机械工程英语第二版翻译实用版内容摘要:

and manufacturing operations to be performed and their sequence. A program sheet is then prepared, which consists of the necessary information to carry out the particular operation, such as cutting tools, spindle speeds, feeds, depth of cut, cutting fluids, power, and tool or workpiece relative positions and movements. Based on this information, the part program is prepared. Usually a paper tape is first prepared for trying out and debugging the program. Depending on how often it is to be used, the tape may be made of more durable mylar. ( 1)手工编程。 手工编程包括根据部分工程图纸首先算出刀具,工件以及工作台的尺寸关系,继而决定执行的操作和工序。 那么一个包括执行特定操作所需必要信息的程序表就准备好了,例如刀具切削,主轴转速,进给,切削深度,切削液,以及刀具或者工件间的相对位置或者移动。 根据这些信 息,部分程序就准备好了。 通常一个纸带首先被准备好用于试用和调试程序。 根据纸带被使用多久,纸袋通常用更耐用的聚酯薄膜制成。 Manual programming can be done by someone who is knowledgeable about the particular manufacturing process and is able to understand, read, and change part programs. Because they are familiar with machine tools and process capabilities, skilled machinists can do manual programming with some training in programming. However, the work involved is tedious, timeconsuming, and uneconomical consequently, manual programming is used mostly in simple pointtopoint applications. 手工编程可以由那些具有特定制造工艺知识和能够理解,阅读以及更改部分程序的人来完成。 因为他们熟悉机床刀具和工艺流程,熟练的机械师可以做一些手工编程的编程培训。 然而,所涉及的工作是乏味的,费时的,因此不合算。 手工编程大多数用于简单的点对点应用上。 (2) Computeraided programming. Computeraided part programming involves special symbolic programming languages that determine the coordinate points of corners, edges, and surfaces of the part. Programming language is the means of municating with the puter and involves the use of symbolic Characters. The programmer describes the ponent to be processed in this language, and the puter converts it to mands for the NC machine. Several languages having various features and applications are mercially available. The first language that used Englishlike statements was developed in the late 1950s and is called APT (for Automatically Programmed Tools). This language, in its various expanded forms, is still the most widely used for both pointtopoint and continuouspath programming.( 2) 计算机辅助编程。 计算机辅助编程是一种涉及到特殊符号的编程语言,这种语言可以决定角点的坐标,刀口以及工件的表面。 编程语言是与计算机通信的方式 并且涉及到符号字符。 编程员用这种语言描述加工零件,而由计算机将零件程序转换为数控机床的执行指令。 许多种商业应用上的语言有多种多样的特点和应用。 第一种被使用的是类似于英语语句的语言,它在十九世纪五十年代末被开发出来并被称为 APT语言。 这种语言,由于它多种多样的扩展形式,一直是最广泛的用于点对点和连续路径编程的语言。 Complex parts are now machined using graphicsbased, puteraided machining programs. A tool path is created in a largely graphic environment that is similar to a CAD program. The machine code (GCode) is created automatically by the program. 复杂的工件现在使用基本的绘图进行制造 , 计算机辅助制造程序。 刀具的路径是在类似于一个 CAD程序的大量的绘图环境下制造出来的。 这种机器代码由程序自动生成。 Before production begins, the programs should be verified, either by viewing a simulation of the process on a monitor or by making the part from an inexpensive material (such as aluminum, wood, wax, or plastic), rather than from the actual material specified for the finished part. 在生产开始之前,程序应该被校验,还有就是通过一个显示器观看工艺流程的模仿或者使用廉价的材料(例如铝,木头,石蜡,或者是塑料)制作工件,而不是使用指定用于已加工零件的真实材料。 Computeraided part programming has the following significant advantages over manual methods: 计算机辅助编程有以下几个优于人工方式的重要优点。 ● Relatively easy use of symbolic language. ● Reduced programming time. Programming is capable of acmodating a large amount of data concerning machine characteristics and process variables, such as power, speeds, feed, tool shape, pensation for tool shape changes, tool wear, deflections, and coolant use. ● Reduced possibility of human error which can occur in manual programming. ● Capability of simple changeover of machining sequence or from machine to machine. ● Lower cost because less time is required for programming. 比较容易使用的 符号语言 缩短了编程时间。 编程是一种容纳了大量关于机械特点和工艺变量数据的一种能力,例如动力,速度,进给,刀具形状,刀具形状改变的补给量,刀具磨损,偏转,以及冷却液的使用。 减少了在人工编程中出现人为错误的可能性。 因为编程时所需更少的时间,降低了成本。 The use of programming languages not only results in higher part quality but also allows for more rapid development of machining instructions. In addition, simulations can be run on remote puter terminals, to ensure that the program functions as intended. This method prevents unnecessary occupation of expensive machinery for debugging procedures. 编程语言的使用不仅导致更高的工件质量而且考虑到了 机械指令的更加快速发展。 另外,模拟可以在远程计算机的终端设备上运行,这就确保了程序按照既定来运行。 这种方法可以防止昂贵的机器由于调试程序产生不必要的占用。 Selection of a particular NC programming language mainly depends on the following factors: 选择某一种数控机床编程语言主要取决于以下几个因素: ● Level expertise of the personnel in the manufacturing facility ● Complexity of the part ● Type of equipment and puters available ● Time and costs involved in programming 生产设施人员的专业水平级别 工件的复杂程度 设备的外形以及计算机的应用 涉及编程的时间及费用 Because numerical control involves the insertion of data concerning workpiece materials and processing parameters, programming must be done by operators or programmers who are knowledgeable about the relevant aspects of the manufacturing processes being used. Before production begins, programs should be verified, either by viewing a simulation of the process on a CRT screen or by making the part from an inexpensive material, such as aluminum, wood, or plastic, rather than the material specified for the finished part. ( 无英语) 因为数控涉及有关工件材料和加工参数的数据插入,编程必须由有制造业的相关方面知识的操作工和程序员来完成。 在生产开始之 前,程序应该被校验,还有通过一个 CRT屏幕来观察工艺流程的模拟或者用廉价的材料制造工件,例如铝,木头或者塑料,而不是使用指定用于已加工零件的真实材料。 NC part programming languages 数控编程语言 Probably over 100NC part programming languages have been developed since the initial MIT research…which are generally considered important. 自从 1956念麻省理工学院的初步研究数控编程系统以来大概有超过 100种的数控编程语言已经被开发出来了。 大多数语言开发用于特殊的需求和机械并且它们没有经受住时间的考验。 然而,相当多的语言在今天一直被使用。 在本小节,我们回顾一下那些被普遍认为是重要的语言。 APT APT(自动编程工具 ), APT语言是麻省理工学院研发的关于数控机床控制编程系统的成果。 它的研发开始于 1956年六月,它第一次用于生产是在 1959年左右。 几天它是在美国应用最广泛的语言。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。