rnc设备典型业务配置方案-不错内容摘要:

s for DCCH Uplink Transport channel parameters Transport channel parameters for UL: kbps SRBs for DCCH Higher layer RAB/signalling RB SRB1 SRB2 SRB3 SRB4 User of Radio Bearer RRC RRC NAS_DT High prio NAS_DT Low prio RLC Logical channel type DCCH DCCH DCCH DCCH RLC mode UM AM AM AM Payload sizes, bit 136 128 128 128 Max data rate, bps 3400 3200 3200 3200 AMD/UMD PDU header, bit 8 16 16 16 MAC MAC header, bit 4 4 4 4 MAC multiplexing 4 logical channel multiplexing Layer 1 TrCH type DCH TB sizes, bit 148 TFS TF0, bits 0x148 TF1, bits 1x148 TTI, ms 40 Coding type CC 1/3 CRC, bit 16 Max number of bits/TTI before rate matching 516 Max number of bits/radio frame before rate matching 129 RM attribute 155165 默认值: 160( ) TFCS TFCS size 2 TFCS SRBs for DCCH = TF0, TF1 Physical channel parameters DPCH Uplink Modulation QPSK Codes and time slots / radio frame SF16 x 1 code x 2 time slots Max. Number of data bits / radio frame 164 bits TFCI code word / radio frame 4 bits TPC / radio frame 2x 2 bits SS / radio frame 2x 2 bits Puncturing Limit 1 大唐移动通信设备有限公司 RNC 设备典型业务配置方案 版本 : 第 4 页 共 30 页 Downlink Transport channel parameters Transport channel parameters for DL: kbps SRBs for DCCH Higher layer RAB/signalling RB SRB1 SRB2 SRB3 SRB4 User of Radio Bearer RRC RRC NAS_DT High prio NAS_DT Low prio RLC Logical channel type DCCH DCCH DCCH DCCH RLC mode UM AM AM AM Payload sizes, bit 136 128 128 128 Max data rate, bps 3400 3200 3200 3200 AMD/UMD PDU header, bit 8 16 16 16 MAC MAC header, bit 4 4 4 4 MAC multiplexing 4 logical channel multiplexing Layer 1 TrCH type DCH TB sizes, bit 148 TFS TF0, bits 0x148 TF1, bits 1x148 TTI, ms 40 Coding type CC 1/3 CRC, bit 16 Max number of bits/TTI before rate matching 516 Max number of bits/radio frame before rate matching 129 RM attribute 155165 默认值: 160( ) TFCS TFCS size 2 TFCS SRBs for DCCH = TF0, TF1 Physical channel parameters DPCH Downlink Modulation QPSK Codes and time slots / radio frame SF16 x 1 code x 2 time slots Max. Number of data bits / radio frame 164 bits TFCI code word / radio frame 4 bits TPC / radio frame 2x 2 bits SS / radio frame 2x 2 bits Puncturing Limit 1 大唐移动通信设备有限公司 RNC 设备典型业务配置方案 版本 : 第 5 页 共 30 页 Conversational / speech / UL: DL: kbps / CS RAB + UL: DL: kbps SRBs for DCCH Uplink Transport channel parameters Transport channel parameters for Conversational / speech / UL: kbps / CS RAB Higher Layer RAB/Signalling RB RAB subflow 1 RAB subflow 2 RAB subflow 3 RLC Logical channel type DTCH RLC mode TM TM TM Payload sizes, bit 39, 81 (alt. 0, 39, 81) 103 60 Max data rate, bps 12200 TrD PDU header, bit 0 MAC MAC header, bit 0 MAC multiplexing N/A Layer 1 TrCH type DCH DCH DCH TB sizes, bit 39, 81 (alt. 0, 39, 81) 103 60 TFS TF0, bits 0x81(alt. 1x0) (note) 0x103 0x60 TF1, bits 1x39 1x103 1x60 TF2, bits 1x81 N/A N/A TTI, ms 20 20 20 Coding type CC 1/3 CC 1/3 CC 1/2 CRC, bit 12 N/A N/A Max number of bits/TTI after channel coding 303 333 136 Max number of bits/radio frame before rate matching 152 167 68 RM attribute 180220 默认值: 200 170210 默认值: 190 215256 默认值: 235 NOTE: In case of using this alternative, CRC parity bits are to be attached to RAB subflow1 any time since number of TrBlks are 1 even if there is no data on RAB subflow1 (see clause in TS ). ( RM 值均为 节的默认值) Transport channel parameters for UL: kbps SRBs for DCCH 参见。 TFCS TFCS size 6 TFCS (RAB subflow1, RAB subflow2, RAB subflow3,DCCH)= (TF0, TF0, TF0, TF0), (TF1, TF0, TF0, TF0), (TF2, TF1, TF1, TF0), (TF0, TF0, TF0, TF1), (TF1, TF0, TF0, TF1), (TF2, TF1, TF1, TF1) 大唐移动通信设备有限公司 RNC 设备典型业务配置方案 版本 : 第 6 页 共 30 页 Physical channel parameters DPCH Uplink Modulation QPSK Codes and time slots / radio frame SF8 x 1 code x 2 time slots Max. Number of data bits / radio frame 328 bits TFCI code word / radio frame 16 bits TPC / radio frame 2x 2 bits SS / radio frame 2x 2 bits Puncturing Limit 协议值: 修正值: [注 1] 注 1: PL≤( 160 328) /( 200 152+ 190 167+ 235 68+ 160 129) ≈ ,取。 Downlink Transport channel parameters Transport channel parameters for Conversational / speech / DL: kbps / CS RAB Higher Layer RAB/Signalling RB RAB subflow 1 RAB subflow 2 RAB subflow 3 RLC Logical channel type DTCH RLC mode TM TM TM Payload sizes, bit 0, 39, 81 103 60 Max data rate, bps 12200 TrD PDU header, bit 0 MAC MAC header, bit 0 MAC multiplexing N/A Layer 1 TrCH type DCH DCH DCH TB sizes, bit 0 39 81 103 60 TFS (note 1) TF0, bits 1x0 (note 2) 0x103 0x60 TF1, bits 1x39 1x103 1x60 TF2, bits 1x81 N/A N/A TTI, ms 20 20 20 Coding type CC 1/3 CC 1/3 CC 1/2 CRC, bit 12 N/A N/A Max number of bits/TTI after channel coding 303 333 136 Max number of bits/radio frame before rate matching 152 167 68 RM attribute 180220 默认值: 200 170210 默认值: 190 215256 默认值: 235 NOTE 1: The TrCH corresponding to RAB subflow 1 should be used as the guiding TrCH, (see clause in TS ). NOTE 2: CRC parity bits are to be attached to RAB subflow1 any time since number of TrBlks are 1 even if there is no data on RAB subflow1 (see clause in TS ). ( RM 值均为 节的默认值) Transport channel parameters for DL: kbps SRBs for DCCH 参见。 大唐移动通信设备有限公司 RNC 设备典型业务配置方案 版本 : 第 7 页 共 30 页 TFCS TFCS size 6 TFCS (RAB subflow1, RAB subflow2, RAB subflow3,DCCH)= (TF0, TF0, TF0, TF0), (TF1, TF0, TF0, TF0), (TF2, TF。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。