船用空调通风安装工艺规范内容摘要:
炼,军工品质 —— 永昇中央空调…… PAGE 10 船用空调通风系统安装施工工艺规范 1)螺旋风管下料时要轴向切割; Material should be cut along the axis 2)螺旋风管的端口要去除菱角和毛刺,避免安装时损坏密封圈; Ports of spiral ducts should be wiped off burr to avoid damaging gaskets 3)橡胶密封圈要完好无损并正确地套在凹槽位置; Rubber gaskets should be undamaged and hitch the groove 4)螺旋风管连接附件的两侧若需要时可用铆钉或自攻螺丝固定; The side which connect to accessory can be fixed by rivets or screw bolts if necessary 5)螺旋风管和附件连接处除了用铆钉和自攻螺丝固定外还要用铝铂胶带包扎密封。 Besides rivets or bolts, wrap with aluminiumfoil around connection to be airproof ●螺旋风管安装节点 Installation nodes of spiral ducts 1)螺旋风管接到静压箱或矩形风管如下图: Spiral ducts connect to static pressure box or rectangular ducts shown in the following drawings ……千锤百炼,军工品质 —— 永昇中央空调…… PAGE 11 船用空调通风系统安装施工工艺规范 2)一根螺旋风管上开 90 度支管并在另一根平行的螺旋风管上面经过如下图: A spiral duct opened a brench duct up it, and pass the other duct shown in the following drawings 3)穿舱件通过大梁或舱壁如下图: Peration pieces traverse beams or cabin wall shown in the following drawings 风管通舱件形式及长度如下表: Mode and length of peration pieces of spiral ducts shown in the following table 风管穿越截面范围( A) area of cross section (A) 风管类型 duct type 穿舱件 penestration piece 穿过 A& B级分割区 cross A& B area 其它 other 备注 mark 代号 code 长度( mm) lenght( mm) 代号 code A 矩形风管 rectangular duct DS 200 PD 非绝热螺旋风管 uninsulated spiral duct G 200 PD 预绝热螺旋风管 insulated spiral duct PG 200 PD A≥ 矩形风管 rectangular duct DL 900 PD 非绝热螺旋风管 uninsulated spiral duct GL 900 PD 预绝热螺旋风管 insulated spiral duct PGL 900 PD ……千锤百炼,军工品质 —— 永昇中央空调…… PAGE 12 船用空调通风系统安装施工工艺规范 技术要求: Technology requirement: 1) 900mm长的通舱件应均匀分布在舱壁两侧,各 450mm长。 Peration pieces which is 900mm long should be set beside the wall equally, either side 450mm 2)防火绝缘用同样的材料敷设在通舱件分割区两侧延伸 450mm。 Lay the same insulation material 450mm extending beside the devided area of peratipn pieces 注意: 30000 吨多用途船的风管穿越 A 级, B级舱壁或甲板的贯通件按全船 “防火结构图 ” Note: The air duct of 30,000T multipurpos vessel through A or B bulkheat or the peration pieces shall be according to the “firproofing structural drawing”. 4)空调风管与布风器的连接如下图: Spiral ducts connect to cabin unit shown in the following drawings ……千锤百炼,军工品质 —— 永昇中央空调…… PAGE 13 船用空调通风系统安装施工工艺规范 5)非绝热螺旋风管与抽风头的连接如下图: Uninsulated spiral ducts connect to exhaust nozzle shown in the following drawings ……千锤百炼,军工品质 —— 永昇中央空调…… PAGE 14 船用空调通风系统安装施工工艺规范 螺旋风管吊架 Suspension clamps of spiral ducts 1)螺旋风管吊架安装形式如下图: Installation mode of suspension clamps shown in the following drawings ……千锤百炼,军工品质 —— 永昇中央空调…… PAGE 15 船用空调通风系统安装施工工艺规范 2)螺旋风管吊架表: Table of suspension clamps of spiral ducts 钢质通风 管安装程序 Stainless duct installation procedure 钢质通风管安装都在分段预装。 在分段阶段,船体各分段经喷砂除锈处理后,进行涂装,报验完毕后才可以进行风管等铁舾件的预装,原则上所有的风管等都在分段内预装,分段和分段之间合拢管在分段合拢结束再安装。 ……千锤百炼,军工品质 —— 永昇中央空调…… PAGE 16 船用空调通风系统安装施工工艺规范 Install duct on block we must spray sand and get rid of rust, then we can do some painting work. After finishing above work, we can install some outfittings in subsection item, general situation:aircondition duct, stainless duct galvanized duct, duct support, the other ventilation outfitting before vertical loading the block of hull and joining of fabricated section. 各分段通风管安装应根据相应分段风管安装图,风管(支架)加工零件图和材料清单来组织安装,检查风管等附件标高是否与图纸相符,甲板舱壁上开孔是否符合要求。 Installing duct in every block should be reference for duct installation drawing, support manufacturing drawing, part list. Check the quality of duct。 insure hole on the hull correctly 风管支架定位 → 风管定位(通风附件) → 风管连接密封 Place support→install duct(outfitting) →connect duct ●风管支架安装是风管安装的第一道工序。 支架形式应根据风管截面大小及分段具体情况选择,但必须符合设计图纸或国家标准。 风管支架无特殊要求时,应符合以下要求: Installing support is the first step of duct installation. According to area of duct or site situation and GB, to choose which type of the duct. If no special reqirements of duct, we must obey these rules: 水平安装的矩行风管长边小于 400mm,其支架间距不超过 3m,大于或等于 400mm,其支架间距不超过 2m。 If longer side< 400mm(horizontal installation), the distance of support< 3 m。 If longer side> 400mm(horizontal installation), the distance of support< 2 m。 垂直安装的风管支架间距为 3m,并在每根立管上设置不少于两个固定件。 If the distance of support > 3m(vertical installation), each duct should have more than two support. 风管支架定位应根据风管安装标高来定,对于矩形风管,它有风管上标高和下标高两种标高;圆形风管是以风管中心作为标高尺寸。 The position of duct supporter shall be positioned according to installation elevation, refer to the rectangle air duct which has upper elevation and low elevation of air duct, the center of circle air duct can as the elevation. 风管支架吊杆通常焊接在横梁或扶强材上,如焊接在甲板上时应 加复板。 Supports are usually welded on beam or construction but if welded on deck, plus pound plate. ……千锤百炼,军工品质 —— 永昇中央空调…… PAGE 17 船用空调通风系统安装施工工艺规范 注意: 30000 吨多用途船的吊架要求带复板并热镀锌处理 Note: The hanger for 30,000T multipurpose vessel shall be provided with pound plate and shall be hot galvanized. ●风管安装: Connect installation 施工现场具备安装条件时,应将预制加工好的风管和附件按照安装图顺序和不同系统运至现场,风管和附件应按照系统图顺序编号,并按编号顺序进行安装。 风管连接 Connect duct 风管安装应按照安装图要求进行,风管安装都在分段内安装,风管之间和风管与附件之间连接大多采用法兰连接,连接的法兰与法兰之间应垫上一层阻燃橡胶垫两圈直径5mm 密封橡胶绳;也有用套管连接和对接焊连接形式,如下图。 另外在分段与分段之间设有合拢管,合拢管应在分段合拢后才可安装连接。 Duct should be installed according to installation drawing, mostly the duct install in block, connect by flange, the 5mm rubber rope between each duct。 or thimble joint and welding joint. In。船用空调通风安装工艺规范
相关推荐
( 3)施工员对劳动保护安全生产负总责,要组织实施安全生产措施,进行安全生产技术交底,检查各班组的安全生产情况,督促工人遵章守纪。 负责分析处理一般性事故的工作,发生重伤以上事故立即上报。 ( 4)对职工进行 安全知识 教育,提出预防的措施。 ( 5)同时做好施工现场、仓库、宿舍、食堂的防火、 防盗等的 - 2- 安全保卫工作。 具体措施 ( 1)安全
系分为三个层次: a 03,为低明度 (黑至深灰) b 46,为中明度 (中灰) c 710,为高明度 (浅灰至白) 明确了明 度的三个层次后,我们将要谈谈明度的对比关系。 明度的对比关系也可以归为三个类别: a 强对比 这种对比关系黑白反差大,视觉效果刺激。 b 中对比 对比关系适中,视觉效果平和。 c 弱对比 这种对比关系明暗反差小,视觉效果模糊。 色彩调和的原理
注意事项:宣传工作要做好,务必将越背 越开心这一活动传递给小学生,要运用小学生爱凑热闹的心理,在同学中形成越背越开心的良好氛围。 ○ 3 、 寻找 文艺 天使 您在学校附近以及在小区内张贴寻找 文艺 天使的活动,鼓励想学或者想学 才艺 的同学前来报名,最终根据大众和学校的评选(主要是根据潜力来评选),选出一名 文艺 天使,暑假在 艺术培训学校 学习免学费。 执行方法
施工。 、分条开挖 由于挖泥船斗臂长度的限制, 在每段 必须分条施工,条与条之间之间至上有~ 米的重叠区,避免形成欠挖土埂。 根据挖槽宽度和机械能力合理确定分条开挖的宽度和数量。 、分层开挖 挖泥船一次最有利挖泥厚度 ,由于断面上靠近老驳岸前沿部位以及老堤防拆除的挖深较大,需分层开挖。 、边坡开挖 为保证形 成稳定的设计边坡,边坡开挖采用阶梯型进行开挖。 超、欠面积比必须控制在 1~ 范围内
是可行的。 建议项目单位加快前期工作 ,积极落实建设资金 ,早日开工 ,保质保量完成项目建设 ,尽早投入使用 ,发挥其应有的效益。 第二章 项目背景与建设必要性 第一节 项目建设背景 一、休闲产业的发展 随着就业结构多元化、工作形式多样化、生活需求多模化和家庭生活现代化 ,人们的闲暇时间越来越多。 而时间 特别是人们连续的可自由支配时间 ,是休闲活动得以产生和发展的必要条件