建筑电气设计毕业英文翻译内容摘要:
disastrous fire aroused profound consideration of the fire safety of highrise residential buildings in China. This disaster was caused by the energysaving project of the building, not because of the design of the highrise building itself, however, how to improve the fire safety of highrise residential buildings and to safeguard the life safety of the residents has bee the most important issue that must be considered seriously during the fire safety design of this kind of building. Therefore, analysis of the problems in the fire safety design of a highrise building in the north part of China has been done as an example to provide references for the fire safety design of the same kind of buildings in the other areas of China. 2. Fire risks of the highrise residential building Fire risks of the highrise residential building usually include the followings. (1) Rapid fire and smoke spread. Because of the “chimney effect” of the highrise building, fire and smoke can spread to the upper floors very rapidlythrough staircases, elevator shafts and ducts in a very short time if the fire and smoke control measures are not adequate. (2) Difficult fire fighting and rescue. Factors like the height of the building, the inadequate fire fighting equipment and fire fighting at an elevated heightcertainly increase the difficulties of the fire fighting in a highrise building. Moreover, the current cladding systems of mosthighrise buildings in China are bustible, which contribute a lot to the vertical spread of fire. In this case, fire covers thebuilding from outside and it increases the difficulties for fire fighters to do fire fighting and rescue. (3) Difficult safe evacuation of the occupants. Generally speaking, there will be more occupants in a highrise residential building than those of a low building. In addition, the vertical travel distance for a highrise building is quite long, which makes the evacuation more difficult. Furthermore, the fire safety sense of the public in China needs to be improved. The lack of mon sense of fire safety and 第 9 页 信息与控制工程学院毕业设计(论文)英文翻译 ability of escaping safely from the building in case of fire increases the safe evacuation time. (4) Fire usually lasts for a quite long time. Fire lasts longer in a highrise building because highrise buildings are usually large in area and heavy in fire load. Therefore, highrise building fire often lasts longer and sometimes it may spread to the adjacent buildings. 3. Highrise building fire distribution mon Fire Distribution Program Fire distribution methods are monly used in radiation type, tree type, chain, four kinds of hybrid (1) The radial distribution of the failure of any one line to each other affect each other, the equipment is easy to manage a high supply reliability. However, more than qualify ing nonferrous metals consumed in large quantities, switching equipment, and more investment in higher operating costs for a single piece of equipment of large capacity, power supply reliability high. (2) The trunktype distribution when the route failure, a larger sphere of influence, but coupled w。建筑电气设计毕业英文翻译
相关推荐
,认真抓实整改。 开展党员承诺践诺、民主评议,严格处置不合格党员,完善党员日常考核评价机制。 认真组织开展“三严三实”专题民主生活会和组织生活会上个人查找问题整改落实“回头看”,切实解决职工群众反映强烈的不严不实问题,持续深化公司作风建设。 坚持“学”为先,切实解决思想不先进的问题。 针对少数党员理想信念不坚定、党员意识淡薄等问题,坚持把学习放在首位并贯穿始终。 组织全体党员学习党章党规
财产所有权,将财产所有权制度化、抽象化即为所有制,而所有制的内容是由产权关系决定的。 建立现代产权制度从正面讲是对企业的产权定位,从反面来讲,就是对原来的国有企业管理体制进行改革,改革原来的所有制关系。 建立现代产权制度对非 公有经济有意义,但主要是国有企业,改革国家管理国有经济的体制,应该是我国经济体制改革的核心,是社会主义与市场经济对接的关键所在。 (二) 公司治理结构 是核心
宗地相邻双方指界人在现场共同认定。 确认的界址点上需设置界标,进行编号,并精确测定其位置。 根据笔者实际经验, 界址点间的长度一般为 550 米,也可根据权属界线的实际情况,增删部分界址点。 由于建设工程土地勘测定界所涉及的土地一般为拟建设区域,若非建设单位有特别要求,实地一般无须埋设界标。 土地分类调查 将土地利用现状图套绘在地形图上作为土地分类调查的工作底图。 在现场逐一调查实施地类认定时
元宵 ? 2.观察制作材料,了解做元宵的方法。 (1)观察并知道做元宵需要的材料。 (2)了解做元宵的方法和要求。 ★指导语:①我们怎样才能做出圆圆的元宵 ?②老师煮元宵时,小朋友们应该注意些什么 ? 3.做元宵、煮元宵。 (1)提醒幼儿穿好围裙并洗手。 (2)幼儿尝试用搓、团圆、在盘中滚一滚等方法做 元宵。 (提醒幼儿注意不把面粉团弄碎,不要将面粉撒在盘外。 ) (3)教师煮元宵。
效的发展 通过课程建设促进教师队伍建设。 通过课程建设,逐步形成“民族、民间、传统美”的校园文化。 四、课程建设内容 开展民间体育活动,有效运用家长资源,探索适宜儿童运动能力发展的民间体育活动内容。 从幼儿运动技能、身体素质、亲子游戏三个维度挖掘科学健康的民间体育活动内容体系。 预设活动: 探索开展民间体育活动的有效途径。 拟定通过亲子游戏、集体或分组游戏、同龄和混龄儿童合作游戏