建筑地震材料的中英文翻译内容摘要:

extensively damaged. The lightweight concrete shear walls at the first story literally shattered, exposing the reinforcing steel to view. The presence of a redundant steel frame within the building may have prevented the collapse of this structure.A sixstory concrete shearwall building in San Francisco also experienced substantial damage. This building had recently been seismically strengthened with the addition of steel braces on the building perimeter. Due to poor design and construction workmanship, the attachment of the braces to the building was inadequate and most of the bolts failed. Building deflections following failure of the bracing caused an interior column to punch through a floor slab. Extensive damage to shear walls above door openings also occurred.Tiltup BuildingsConcrete tiltup buildings are the most mon form of modern lowrise industrial and mercial construction throughout California. They usually are constructed with plywood sheathed woodframe roofs supported by perimeter concrete walls. They are called tiltups because the perimeter walls are constructed lying flat against the floor slab and then tiltedup into position around the building. Extensive damage to these buildings has been observed in past earthquakes, including the 1987 Whittier and 1971 San Fernando events.Thousands of tiltup buildings are present in the affected region. Although some significant damage was experienced near the epicenter, the greatest concentrations of these buildings are located in areas that experienced very weak ground motion. Most of these buildings therefore had little damage.Several buildings in Hollister were investigated. Several tiltup building partially collapsed as the result of inventories of stacked cans containing tomato product impacting the walls during the earthquake. Damage was extensive. Much of the inventory was lost or severely damaged. This underscores the importance of addressing seismic issues relating to equipment and contents, as well as structural designThe buildings appeared to be late 1960s or early 1970s vintage and as such were observed not to have rooftowall anchors. These anchors were required following collapses of tiltups during the San Fernando Earthquake in 1971. Much of the roof of a half of one building occupied by the adjacent tenant also collapsed, causing extensive interior damageIn Watsonville, several panels of a large tiltup owned by a food packager bowed outward at midheight and approached collapse. Concrete spalled off of several of the pilasters in the building wall, exposing the reinforcing steel, some of which buckled. In another, newly constructed Watsonville tiltup, interpanel connections at a skewed corner were damaged and roof sheathing was severely torn.Steel Buildings Modern steelframe buildings performed excellently in this earthquake, as they have in the past. Damage to these structures was typically limited to cracking of cladding and interior partitions and widespread disarray of contents. The nonstructural damage sustained by steelframe buildings may largely be attributed to their flexibility, which results in very large displacements.A steelframe building with corrugated metal siding in Hollister serves as a warehouse for a food pany. As with the concrete tiltup buildings in Hollister, this tomato packing pany experienced severe damage to its steelframe building and significant loss of inventory. Canned tomato products stacked over 30 feet high on standard pallets were mobilized by the earthquake. Most stacks collapsed, impacting and ripping through the corrugated metal side walls. Impact forces were so great that several tapered steel columns and beams were severely damaged. These steel members twisted, bent, and failed, taking down an entire section of the building. Much of the inventory was lost or severely damaged. As with concrete tiltup warehouses, this incident highlights the effect that stored inventory can have on the integrity of a building during an earthquake.SummaryThe remote epicentral location of this earthquake allowed the San Francisco Bay Area to survive with relatively few instances of structural collapse. Except for buildings near the epicenter, most cases of severe damage occurred in older buildings with little seismic capacity and in areas of extremely weak soils. The fact that many inadequate structures in the region experienced little damage indicates that ground motion in most areas was not severe. Even so, most businesses experienced at least a week39。 s business interruption and some capital loss. Many businesses must relocate to new facilities until their buildings are repaired or replaced. In future stronger shocks or in earthquakes located closer to the major population centers, much more extensive damage and mercial loss are likelyResidential Structures Most residential buildings in the affected area are of woodframe construction. Such buildings have generally performed well in past earthquakes because they tend to be light, minimizing inertial forces。 and because they are relatively rigid, minimizing damage associated with deformation, such as cracking of interior walls. There are, however, major exceptions to this generally good performance record. Older (especially pre1940s) homes, because they lack positive connections to their foundations or have raised floors supported by relatively weak cripple walls.Some of the more irregularly shaped newer homes。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。