外文翻译--电火花成形加工技术的现状与发展趋势内容摘要:
ng processing basic theory research not yet made the substantive progress, although some scholars to the processing process electric discharge trace, the material eclipse eliminated the principle and so on to propose some new views, but obtained the significant breakthrough by no means in the electric spark machining mechanism research aspect. The more active research area mainly concentrates in the processing craft theory and the control theory aspect. In the processing craft fundamental research aspect, how does the research 9 hot spot mainly is enhance the electric spark forming processing the surface quality and the processing speed, reduces the loss, the development electric spark machining scope, as well as exploration plex, tiny structure processing method and so on. Will apply through the research results in the production practice, will prehensively enhance the electric spark forming processing workability. In the control fundamental research aspect, the intelligent control always is the research key. The domestic and foreign production new electric spark forming processing engine bed mostly has used the intelligent control technology, this technical application makes the engine bed operation to be easier, requests to the operator lowly. At the same time, the intelligence control system has from the learning capability, but the online automatic monitor, the adjustment processing process, realizes the processing process optimized control. Although the electric spark forming processing fundamental research in aspects and so on basic theory, processing craft theory, control theory all has certain development and the enhancement, but the processing craft theory, the control theory need to obtain the further full scale development, must have the breakthrough in the entire electric discharge process mechanism research. Therefore, the electric spark forming processing fundamental research trend of development will be further is discussing the processing craft theory and the control theory, enhances the electric spark forming processing workability and the processing scope, obtains the better control effect at the same time, key research electric discharge process mechanism. The electric spark forming processing mechanism research has not made the unprecedented progress the primary cause except outside the electric discharge process itself plexity, randomness, but also because the research technique and the method lack the innovation. Therefore, it is necessary to profit from other research area the success experience, directs the human advanced research technique and the experimental technology, the victory tradition research technique limitation, the deep person analysis and the revelation entire electric discharge process intrinsic essence, the establishment may reflect objectively the electric discharge process rule the theoretical model, instructs the electric spark forming processing craft theory and the control theory research, but the puter simulation technical possibilities realizes this process effective tool. 2. electric spark forming processing equipment structure improvement The model modern machining engine bed development experience, the electric spark forming processing equipment develops to the numerical control direction is a irreversible tendency. On the one hand should by the high accuracy, the high velocity, change into the pursue goal automatically, seizes the market by the technical superiority。 On the other hand should consider fully the equipment the performance price pared to, through to the engine bed function reasonable localization, makes the structure improvement and the modular design, uses the 10 open numerical control system, enhances rationality which the engine bed designs, provides by the lowest price and the enough function to the user may satisfy each kind of electric spark forming processing engine bed which the different processing needs. Modern machining technological development impact, before suits uses the electric spark machining a part of processing domain to substitute gradually for the machining way. But, the modern science and technology development proposed to the ponents manufacture precision a higher request, each kind of high performance material application is day by day widespread, simultaneously, some ponents structure tends to the plication, the microminiaturization, thinly, this all causes the machining technology to be restricted in certain processing domain application, but these are exactly the electric spark forming processing technical superiority, also is it has the existing space and the development potential reality basis. For the prehensive impetus electric spark forming processing equipment technology advancement, while uses the advanced control system, the engine bed structure design also needs further to consummate, its main development direction displays in following two aspects: (1) straight line servosystem application The electric spark forming processing equipment uses the straight line electrical machinery servosystem to be possible to cause the workability to obtain the distinct improvement, the concrete manifestation is: May realize the axis direct translation, omits a guide screw nut transmission link, thus guarantee axis high speed movement。 Uses the straight line electrical machinery and the slide integration structure, may eliminate between the slide and the electrical machinery because of has the machinery lag in response phenomenon which the middle link causes, enhances the system the sensitivity, reduces the dynamic response time, the guarantee processing process stability。 The straight line electrical machinery servosystem mode of motion had decided its position examination link must use the straight line position feedback part, the rea。外文翻译--电火花成形加工技术的现状与发展趋势
相关推荐
eaders, level control, character recognition etc. Nowadays packing containing an LED and a photodiode, called „optocoupler‟ is used for switching on power or control circuits. Because the light
mm采用 2个扣件在两端扣牢 , 具体按下图。 1立杆垂直度允许偏差值不大于 H/1000, 排列直线段允许偏差值不大于 L/1000( H为高度 , L为水平长度)。 1大横杆和小横杆水平度偏差值不大于 L/8000 1外架搭设必须满足规定使用要求 , 同时必须达到强度 , 刚度和稳定性。 1外架搭设完毕后 , 应组织有关职能部门人员进行检 查验收 ,达到符合验收质量后方可使用。 第四节
落实党风廉政建设主体责任不力的情况进行了通报,新乡原市委书记因落实主体责任不力,受到党纪处分,并被免职,纪委书记也受到相应处理,它的一个班子里面两个常委和一个市长被追究法律责任。 四川南充在党代会选举过程中出现大面积拉票贿选,最后经过 2 年多的调查核实, 33人被移送司法机关追究刑事责任, 344 人受到党纪政纪处分,原南充市委书记以玩忽职 守罪被判 3 年有期徒刑,有名常委被判有期徒刑 20
域摆放导视牌,指示系统。 指示系统由外海办公室负责彩色打印,活动当天由各个区域指挥人员负责粘贴或摆放,于活动当天 7:00 之前粘贴完毕。 不能粘贴区域由工程部门制作粘贴架,指示系统内容包括: 各区域指示牌 车辆停放指示 各观礼区标示牌 等 K、 观礼区、奠基区、嘉宾区、直播区、主席台铺设红地毯,如当日天气条件允许,提前一天由活动公司负责把红地毯运至项目现场,并铺设固定完毕
at once. WCDMA is fully pliant with IMT2020 and is the air interface technology for standards in the 2GHz bandwidth (the IMT2020 core band), known as UMTS (Universal Mobile Telemunication System) in
万科西岭工程 【 外墙面砖镶贴工程施工方案 】 8 全部整块瓷砖镶贴完毕、胶粉浆凝固以后,将底层靠墙托板取下,然后将非整块瓷砖补上贴牢。 面砖接缝的宽度横缝应为 8~ 10mm,坚缝应为 8~ 10mm,不得采用密缝。 缝深宜为 35mm。 对窗台、檐口、装饰线、雨篷、阳台和落水口等墙面凹凸部位,设置滴水槽。 对面砖进行各项检查完毕后,用专用勾缝剂勾灰色缝,勾缝时先勾水平缝,再勾垂直缝