ca6140主轴加工工艺及夹具设计说明书t毕业设计内容摘要:
t ware platf or m supervison m ot or vehicle t est, and i entif ication sit uation 7418l iangci, investigation m ot or vehicle exception business 30 car t im es, his pards business war ni g 244 ar ticle, vehicles and driving people sound video r egulat or y screenshot s 1852 Zhang, checks m ot or vehicle archives 716 pieces tim es, and m edium bus, and medium above t r uck, and Of hazar dous chemicals, vehicles and school buses and ot her key vehicle inspect ion r ecor d of 420. ( C) based on t heir own, and st rict adher ence t o defense, m or e cheating, f alse f alse f ugit ive suspects, r obbery suspect vehicles and t he I nt er cr ackdown. DM V f ul play t o t he f ir st line of Def ense posit ion contr ol, invest igat ing cheat ing, f ake ident if ication and r obbery suspect vehicles t hrough oper ational wor k, and car ef uly examine the document s and legal pr oof , check tr af fic violat ions, t raf fic accident s, the f ugit ive suspect suspected vehicles and theft t han to wor k, furt her t ight car , driving management business for malit ies r eview procedures. . . Tr uck dr iver inf ormation management platfor m. M ot or vehicles and t raff ic police depar tments, Stat e t ransport aut hor it y t o fur ther clarif y the Division of labour , im plem entation r esponsibilt y, st rengt hen our colabor at ion and management oget her, r einf or cing t he m anagement of dr iver s on which strongly synthet ic warf ar e and inf or mation warf ar e. 3 st rict ly implemented. From May 1 up, a is im plemented plex road and bad weather dr iving exam, cur rently DMV is ur ged cont ract or s par ty in t reasures dr iving schol incr eased simulation Highway, and cont inuous ur gent detours, and snow days, and wet sliding road, and burst sit uat ion disposal, subjects I field t o driving exam pr oj ect, is expect ed2 摘 要 机械制造业是一个国家技术进步和社会发展的支柱产业之一,无论是传统产业,还是新兴产业,都离不开各式各样的机械装备。 而加快产品上市的时间,提高质量,降低成本,加强服务是制造业追求的永恒主题。 此篇论文主要内容是对 CA6140 主轴加工工艺路线进行的研究、设计,其中包括了各道工序的加工方法,机床、刀具、夹具、辅具、量具的选择,准面的选取,定位和夹紧方案的拟定。 关键词: 轴 夹具 装配图 工艺 Abstract Machinery manufacturing is one of the pillar industries which a national technological progress and social development need, both traditional industries and burgeoning industries can not be separated from sundry mechanical equipment. And speed up product listed time and improve quality, reduce costs, enhance services for the manufacturing industry is the eternal theme. This thesis is the main content of the Main axle of CA6140 engine lath case machining line for the research, design, Including the Road processes processing methods, machine tools, cutlery, fixtures, a Catholic, measuring instrument choice, datum selection, positioning Keywords: Axle Fixture Assembly dranwing Travel chart evaluat ion of scient if ic development. Nat ur e secur ity t ype nat ur e secur ity is t o maintenance people of healt h value f or t ar get, thr ough st rengt hening secur ity based management, and r is k m anagement , and equipment management and t echnology super vison, ensur e production in t he people, and r eal, and syst em, and syst em , element s ecur ity r eliable, and harmony unif ied, f ul cont rol various against f actors, achieved thought no slack, and managem ent no empty document , and equipment no hidden, and system no blocked, and unit zero nonst oped. Qualit y and ef ficiency qualit y benefit is t o adhere to t he enter pr ise sur vival, profit and development business t ruth, adher e to t he all activit y is economic activit y, all costs can be contr oled, money should not be wast ed management philosophy, m anagement analysis, t o im prove m anagement qualit y, im prove cost contr ol capacit y and mar ket pet it iveness. I novation of science and t echnol gy science and t echnology innovat ion is t o play t he r ole of science and technology as the primar y pr oductive f or ce, active use of new t echnologies, new m at erials, new processes, new equipment , incr ease invest ment in science and technology, st rengt hening scientif ic and t echnological t r aining, speeding up tr ansforming scient ifc and technological achievement s, for ming a number of pr opr ietary t echnology, enhancing cor e pet it iveness. Resource saving theresour ces saving enterpr ise was to r educe coal consumption, wat er consumpt ion, elect ricit y at t he core, enhance t he operation of lean m anagement t o r ealize low consumption, high ef ficiency, r educe pr oduct ion costs. Second is t o strengt hen t he business, financial, mater ial, inf ormation and t he opt imization of or ganizat ion and management , s aving the int er nal t r ansaction cost s. Har monious development of har monious developmentis t o const ruct a foreign environment for development. XI NG r ef er s t o t he internal securit y f irm and int er nal m anagement of the inter nal management measures ar e effective, harmonious. Foreign cur rency means Enterprise coor dinat ing development of homeopathy, well, get along wit h t he neighbor s bet ter. ( B) XX 2020 five enterprises building int r insic safety power pany goals are: unplanned out age 0 t imes. Class of disorder s 0, 0 is equivalent f orced outage r at e. No per sonal inj ur y accident, material and equipm ent accidents do not ocur, no f ir e, no environment al polut ion accident. Enterpr ise int egr at ed t o achieve zero cases of violat ion, zer o accident s, zero. Qualit y goal is: when gener at ing capacit y ≥ 7. 5 bilon kilowatt , sales of over 7. 11 bilon kWh, t ot al pr ofit s of ≥ milon Yuan, . . BFS++、 PI、 MI S、 SCM I nformation syst ems inf rast ruct ure, f uly int egrated inf or mat ion system t o r ealize inf ormation r esour ces sharing。 t o expand t he br eadth and epth of t he por tal syst em, inf or mat ion sys。ca6140主轴加工工艺及夹具设计说明书t毕业设计
相关推荐
层 1 枪式 大堂场景 BH,B7 2 枪式 酒店进出口 BG,B8 3 枪式 旋转门 BG,B9 4 枪式 酒店进出口 BG,B10 5 球机 大堂 360176。 场景 1/2BGF,B10 6 枪式 大堂场景 BF,B12 7 枪式 服务台 BE,B12 8 半球式 MFM1421Y/LM1824安全通道门 BG,B4 9 … 防火门与通道 (商店 ) BF,B7 10 …
方进行验槽,验槽完成后方可进行下道工序施 工。 基础结构施工完后,应及时回填。 回填时,先清除虚土及坑内杂物,回填砂石褥垫层时,采用平板振动夯夯填密实,压实系数要满足设计要求。 富士康(太原)科技工业园 D 区 D5 厂房施工组织设计 12 林州市建筑工程一公司太原分公司 *土方工程施工的有关规定和要求 * 1. 一般规定 土方工程施工前应进行挖方、填方的平衡计算,综合考虑土方运距最短
分度值 005的测量范围 0~ 125mm 的游标卡尺和键槽尺寸专用夹具 确定工序尺寸 确定工序尺寸的一般方法是由加工表面的最后工序往前推算最后工序的工序尺寸按零件图样的要求标注当无基准转换时统一表面多次加工的工序尺寸只与工序或工步的加工余量有关当基准不重合时工序 尺寸应用工艺尺寸链解算 1 确定主要圆柱面的工序尺寸
绑扎 中嘴水电站厂区枢纽工程标 (ZZ/CⅤ ) 【施工组织设计】 钢筋安装,采用现场手工绑扎,绑扎时,挄设计施工图纸和测量点线进行搭接、分距、摆放、绑扎、固定和点焊。 在钢筋架设安装之后,及时加以固定保护,避免収生错动和发形。 ⑶ 钢筋焊接 各种垄号钢筋主要采用搭接手工电弧焊。 由具有合格资质的电焊工持证上岗,挄有关觃范和觃定进行施焊,钢筋焊接长度单面焊接丌少于 10d,双面焊接丌少于5d。
切削速度为: 1000wwdnV 500 / min 机动工时: 1m wllt nf= 71500 = ( 3)精扩φ mm 孔。 同上取进给量 f= / r,n= 630r/ min 则 1000wwdnV = 6 3 0 1 3 .8 2 7 .3 ( / m in )1000 m 20/89 机动工时: 1 71 0 .2 8 2 m in6 3 0
低压成套配电柜、控制柜(屏、台)和动力、照明配电箱(盘)应有可靠的电击保护。 柜(屏、台、箱、盘)内保护导体应有裸露的连接外部保护导体的端子,当设计无要 求时,柜(屏、台、箱、盘)内保护导体最小截面积 Sp 不应小于表 的规定。 表 保护导体的截面积 相线的截面积 S(mm2) 相应保护导体的最小截面积 Sp( mm2) S≤ 16 S 16< S≤ 35 16 35< S≤ 400 S/2