esb项目_技术规范指引_v1内容摘要:

服务的定义和规范。 服务的定义包括服务的功能,输入要素和输出要素等。 服务的消费者根据服务规范组织数据调用 ESB的服务;服务的提供者根据服务规范实现服务。 21. 服务代码 SERVICE_CODE 服务的代码,一个服务的编码,主要定义了服务的业务功能。 22. 服务场景 SERVICE_SCENE,服务的场景,一个服务场景,对服务的业务功能进一步进行细分。 服务代码和服务场景唯一确定一个原子服务。 苏州银行 股份 有限公司 技 术规范 指 引 to supervison plactg,dmhfqubw:. ing and closing m achine of equipm ent lisng。 . installation quality check of m iddle acceptance records。 . buried pieces quality test of m iddle acceptance records。 . gate test detection results and opening and closing m achine m isoning test records. m ajor defects and quality accident records and the processing report. gate and the opening and closing m achine acceptance Hou, Before being transferred to the em ployer, the installation shall be responsible for keeping the equipm ent .M onitoring of pressure forebay: layout 1 autom atic w ater level gauge, m onitoring the w ater level changes. Pressure pipeline proposed in dow n flat into the holes inside the tw o m onitoring section, stress and strain. (4) plant proposed tailrace located on the inside of a w ater gauge, in order to observe the w ater level changes. security m onitoring of w ork content according to this technology term s provides, and construction draw ings requirem ents and supervison people indicates, ICouncil of w ork content including (but not lim ited to): (1) m onitoring第 3 页 2. ESB 使用指引 . 接入 ESB 的步骤 外围系统原有架构设计中如果没有使用 ESB 的设计,需要走架构变更。 架构变更通过之后,才可以使用 ESB,并按下面的操作使用。 一. 详细 的系统接入流程 见 《 ESB 项目 _系统接入规范流程及指南》 二. 获取 ESB 服务分析的产出 —— SZBSD 文档 ESB 有严格的发布计划,如下: 1 周周一 16 : 00 周四 16 : 00S u n . M o n . T u e s . We d . T h u r . F r i . S a t .E S B S Z B S D 版本发布计划版本发布日 发布计划说明如下:  ESB_SZBSD 每周只发布 2 次版本,周一、周四 16: 00 发布版本。 其间不接受紧急版本发布。  每次发布说明中包含该版本的修订服务列 表清单。  SZBSD 文档命名规则: ESB_SZBSD(). 如 :ESB_SZBSD()  ESB_SZBSD 的版本号编码规则如下: 如: 第一位 X: 数字, 09 循环,当第二位逢 9 后进位。 第二位 X: 数字, 09 循环,当第三位逢 9 后进位。 第三位 X: 数字, 09 循环,每次发布加 1。 发布内容说明,包含如下文档: to supervison plactg,dmhfqubw:.。 ykjHBM1P(4)03IC  其中包含 SZBSD 每个模块分类服务规范详细内容。  字段映射文档 XXX SZBSD 服务于后端系 统接口映射说明  版本发布概述 对发布的版本修改、新增或删除的内容进行描述。 三. 外围系统使用 ESB 的 API 开发、测试和上线 ESB 的 API 有两种:  Java 版本 API 向使用 Java 开发的外围系统提供的 API,内容包括: 由 ESB 编 译后发布到公共平台,供各 系统 下载使用。  C 语言版本 API: 向使用 C 语言开发的外围系统提 供的 API,可以向 ESB 项目组获取。 ESB 的 API 提供文档,文档中包含配置参数的设置、说明,数据对象的构建、使用,以及示例程序。 . ESB 环境说明 环境 IP 端口 服务类型 苏州银行 股份 有限公司 技 术规范 指 引 to supervison plactg,dmhfqubw:. ing and closing m achine of equipm ent lisng。 . installation quality check of m iddle acceptance records。 . buried pieces quality test of m iddle acceptance records。 . gate test detection results and opening and closing m achine m isoning test records. m ajor defects and quality accident records and the processing report. gate and the opening and closing m achine acceptance Hou, Before being transferred to the em ployer, the installation shall be responsible for keeping the equipm ent .M onitoring of pressure forebay: layout 1 autom atic w ater level gauge, m onitoring the w ater level changes. Pressure pipeline proposed in dow n flat into the holes inside the tw o m onitoring section, stress and strain. (4) plant proposed tailrace located on the inside of a w ater gauge, in order to observe the w ater level changes. security m onitoring of w ork content according to this technology term s provides, and construction draw ings requirem ents and supervison people indicates, ICouncil of w ork content including (but not lim ited to): (1) m onitoring第 5 页 联 调测试前需 要 与 ESB 项 目组一起沟通确认 测 试环境信息。 . 报文数据结构说明 简介 :服务接口定义将使用 XML 方式来传输接口数据 . 逻辑结构 服务接口的报文数据结构应当遵循以下结构: 其中 CompositeData、 Array、 Field 都是在 Integrator 平台下的标准 数据对象:  Field 值数据对象,用于存储单一数值对象  Array 数组数据对象,可以是域数组或者结构数组  CompositeData 组合数据,用于存储其它类型的数据 报文体的数据结构中,主要包括四大部分:  应用报文头 应用头使用 CompositeData 存储数据,其结构名称为 APP_HEAD,应用报文头结构中只包括域数据对象,如下图: to supervison plactg,dmhfqubw:.。 ykjHBM1P(4)03IC6  系统报文头 系统头使用 CompositeData 存储数据,其结构名称为 SYS_HEAD,系统报文头结构中对于上送主机时为域数据对象( Send),主机下送时为域数据对 象和结构数组对象( Receive)。 上送如下图: 下送如下图:  本地报文头 本地报文头使用 CompositeData 存储数据,其结构名称为 LOCAL_HEAD,本地报文头中包含有一个结构数组,用以存放交易本地授权信息,如下图:  报文体 报文体中可以包括域( Field)、数组( Array)、结构( CompositeData),其中域存储值数据,按名称添加或获取数据;数组可以是域数组或者结构数组,按下标添加和获取数据(其中结构数组以行方式组织多条记录,结构嵌套域数组以列方式组织多条记录),如下图: 苏州银行 股份 有限公司 技 术规范 指 引 to supervison plactg,dmhfqubw:. ing and closing m achine of equipm ent lisng。 . installation quality check of m iddle acceptance records。 . buried pieces quality test of m iddle acceptance records。 . gate test detection results and opening and closing m achine m isoning test records. m ajor defects and quality accident records and the processing report. gate and the opening and closing m achine acceptance Hou, Before being transferred to the em ployer, the installation shall be responsible for keeping the equipm ent .M onitoring of pressure forebay: layout 1 autom atic w ater level gauge, m onitoring the w ater level changes. Pressure pipeline proposed in dow n flat into the holes inside the tw o m onitoring section, stress and strain. (4) plant proposed tailrace located on the inside of a w ater gauge, in order to observe the w ater level changes. security m onitoring of w ork content according to this technology term s provides, and construction draw ings requirem ents and supervison people indicates, ICouncil of w ork content including (but not lim i。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。