沥青船技术规格书船舶内容摘要:

................................................................................................................................64 GENERAL..........................................................................................................................................................64 BALLAST SYSTEM ...........................................................................................................................67 BILGE SYSTEM ...................................................................................................................................67 SCUPPER AND DRAINAGE SYSTEM............................................................................................68 Fuel Oil and System .........................................................................................................69 FIRE FIGHTING WASH DOWN SYSTEM .....................................................................................69 AIR AND SOUNDING PIPE ..............................................................................................................73 REMOTE LEVEL AND DRAFT GAUGING SYSTEM ...................................................................73 FRESH WATER SERVICE SYSTEM ................................................................................................74 DISTILLING WATER SYSTEM........................................................................................................74 COMPRESSED AIR SYSTEM FOR DECK SERVICE.....................................................................74 8. AIR CONDITIONING AND VENTILATION .....................................................................................................76 ENGINE ROOM VENTILATION.......................................................................................................76 AIR CONDITIONING SYSTEM ........................................................................................................76 MECHANICAL VENTILATION AND AIR CHANGE RATE ......................................................77 NATURAL VENTILATION...............................................................................................................78 VENTILATION OF SPACE AT CARGO DECK AREA.................................................................78 9. REFRIGERATING PLANT....................................................................................................................................80 10. AUTOMATION, MONITORING AND REMOTE CONTROL ..............................................................81 GENERAL DESCRIPTION .................................................................................................................81 MAIN ENGINE ....................................................................................................................................81 ALARM AND MONITORING SYSTEM.........................................................................................83 ELECTRIC GENERATING PLANT ...................................................................................................85 THERMAL OIL HEATER ..................................................................................................................86 OTHER’S AUXILIARY EQUIPMENT .............................................................................................86 SHIP’S SYSTEM CONTROL .............................................................................................................86 AUTOMATIC TEMPERATURE REGULATION ...........................................................................87 6,300 DWT ASPHALT CARRIER SC509601002SM M III AUTOMATIC CHANGEOVER OF STANDBY PUMP...............................................................87 AUTOMATIC STARTING AND STOPPING OF PUMP ..............................................................87 11. INSTRUMENTATION.................................................................................................................................88 PRESSURE, COMPOUND AND VACUUM GAUGE.....................................................................88 THERMOMETER ................................................................................................................................88 12. SPARE PART AND TOOL..........................................................................................................................89 SUPPLY PRINCIPLE FOR SPARE PART AND TOOL ..................................................................89 ENGINE ROOM INVENTORY ...........................................................................................................89 6,300 DWT ASPHALT CARRIER SC509601002SM M 1 5. MACHINERY GENERAL OF MACHINERY GENERAL The vessel to be designed and constructed as a single screw driven by a diesel engine located aft and in pliance with the requirements of Classification Society. The propelling plant consists of a lowspeed, reversible diesel engine driving a fixed pitch propeller through a fed steel shafting. The propeller shaft to be turned clockwise viewed from aft end of M/E when running ahead. The main electric generating plant consists of two (2) sets of main diesel generator set and one (1) set of emergency diesel generator set. The thermal oil heating plant consists of one (1) set of exhaust gas heater and two (2) sets of oil fired heater. The unattended machinery space to be provided, an airconditioned engine control room to be provided in engine room and to be equipped with engine controls device, main switchboard and other necessary monitoring equipment. SI units to be adopted for design, construction of machineries and measuring units, such as power, pressure, temperature and volume etc.. Pipes/valves flanges to conform to ISO standard. Pipe dimension and。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。