工程建设标准强制性条文cpecs-b-1房屋建筑部分英文版内容摘要:

oreyed and Highrise Reinforced Concrete Buildings…………………………… 8 Light Aggregate Reinforced Concrete Structures……………………………………… 11 4. Antiseismic Design for Multistoreyed Masonry Structures………………………… 12 General Provisions……………………………………………………………………… 12 Building of Clay Bricks and Porous Bricks…………………………………………… 13 Building of Small Concrete Blocks…………………………………………………… 16 5. Antiseismic Design for Structural Steel……………………………………………… 17 Highrise Buildings of Structural Steel………………………………………………… 17 6. Antiseismic Design for Mixed Load Bearing Structures…………………………… 20 Bottom Frame and Multistoreyed Internal Framed Buildings……………………… 20 Singlestoreyed Spacious Houses…………………………………………………… 22 — 8 — Section VII Structure appraisal and reinforcement 1. Appraisal of structure safety……………………………………………………………… 1 General rules…………………………………………………………………………… 1 Concrete Structural elements…………………………………………………………… 2 Steel structure elements………………………………………………………… ……… 2 Building block structure elements……………………………………………………… 3 Wooden structure elements……………………………………………………………… 3 Wooden structure of ancient constructions……………………………………………… 4 Earth foundation………………………………………………………………………… 5 2. Appraisal for earthquakeresistance of house…………………………………………… 6 Basis of appraisal of defense against earthquake ……………………………………… 6 General rules…………………………………………………………………………… 6 House of building block………………………………………………………………… 7 Reinforced concrete House… …………………………………………………………… 10 Houses with internal shell frame and bottom shell frame……………………………… 11 Large span houses……………………………………………………………………… 12 Wood structure of ancient constructions………………………………………………… 13 3. Structure reinforcement………………………… ……………………………………… 17 Regulations for antiearthquake reinforcement……………………………………… 17 Building block houses………………………………………………………………… 18 Houses made of reinforced concrete………………………………………………… 21 Houses with internal shell frame and first floor shell frame………………………… 22 Large span houses…………………………………………………………………… 23 Wood structure of ancient constructions…………………………………………… 24 Earth foundation…………………………………………………………………… 28 Section VIII Quality and safety of engineering construction 1. Construction quality of earth foundation……………………………………………… 1 General rules…………………………………………………………………………… 1 Soil with special properties…………………………………………………………… 1 Piling foundation……………………………………………………………………… 2 Supportingprotecting foundation pit…………… …………………………………… 3 Treatment of earth foundation………………………………………………………… 4 2. Construction quality of concrete structure…………………………………………… 5 General rules………………………………………………………………………… 5 — 9 — Connection of reinforcing steel bars…………………………………………………… 8 Reinforced concrete structure engineering project……………………………………… 11 Assembled concrete structure engineering project……………………………………… 15 Prestress reinforced concrete structure engineering project…………………………… 17 Construction in winter…………………………………… …………………………… 20 3. Construction quality of steel structure………………………………………………… 21 Common steel structure engineering project…………………………………………… 21 Shelltype steel structure engineering project…………………………………………… 25 Steel framework structure engineering project……………………………………… 28 4. Construction quality of building block structure……………………………………… 29 General rules…………………………………………………………………………… 29 Building block and mortar……………………………………………………………… 30 Brick laying construction………………………………………… …………………… 31 Building block made of concrete blocks……………………………………………… 33 Steel bar arrangement for building block……………………………………………… 35 Construction work in winter…………………………………………………………… 36 5. Construction quality of wood structure…………………………………… ………… 37 Material standard and dry requirement………………………………………………… 37 Regulations for construction…………………………………………………………… 41 Fabrication of Glue Jointed Structure…………………………………………………… 43 6. Roof waterproof construction quality…………………………………………………… 44 7. Equipment installation quality…………………………………………………………… 46 Fuel gas equipment…………………………………………………………………… 46 Ventilation and air conditioning equipment…………………………………………… 52 8. Construction safety requirements……………………………………………………… 60 Temporary power……………………………………………………………………… 60 Overhead operation…………………………………………………………………… 65 Application of machines……………………………………………………………… 72 — 10 — Section I Architecture Design 1. Basic Design Regulations General Regulations General Regulations for Civil Architecture Design JGJ 3787 Ground level 1. The ground surface level shall be designed according to the control level set by the urban planning. Architectures and spaces neighboring boundary lines of the ground 3. Except permanent vacant spaces determined by urban planning, architectures neighboring boundary lines of the ground shall not make openings, doors, windows, balcony, eaves, waste gas exhausts and rain water drainage to the direction of neighboring land. Architectural projections not allowed to be extruded into road property line. 1. Steps, platforms and windowsills of the building. 2. Underground structures and foundations of the structure. 3. Other underground pipelines within the ground except the lines to be connected with the municipal piping. Surface drainage 1. Facilities to drain rain water from surface and road shall be provided within the ground. Stairs 2. The width of stairs for daily major transportation use shall be determined according to the application characteristics of the building and in general it shall be +(0 ~ ) m per man flow, and the number of man flow shall not be less than two. 3. Where the direction of stairs section is changing, the minimum width of handrail at the landing shall not be less tha。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。