外文翻译----高层建筑设计标准内容摘要:
te and structural steel have made great strides and opened horizons for more efficient use of these materials. The structural engineers and architects also have met the challenge to find efficient and economical new structural systems for various ranges and heights of buildings going all the way to well over 100stories. Consequently, the process of selecting a structural system for a tall building has bee more plicated than it ever was. Structural system approach used for the total design of a building. The process of choosing the structural system for a tall building depends on many criteria which are not always structural. Without the understanding of all of these significant criteria, the structural engineer would feel frustrated in his efforts. The process of designing a building is multidiscipline, and since structure is an integral part of the total scheme, the successful adoption of an innovation in concept will have a much harder time of for acceptance if the engineer does not have an understanding of these criteria, The following is a brief discussion of these design criteria.. 1. Environmental Planning Consideration. In any environment the addition of a tall building will certainly influence the operation of the traffic system, as well as the flow of people in the entire neighborhood. Therefore, a tall building project must be resolved in terms of pedestrian, auto and other traffic, and also resolve the overall need for space at the ground level. While an open plaza may be a viable solution under certain climatic and planning conditions, it may not be a reasonable solution where weather conditions are extreme either for winter or for summer. In such cases alternate to open plazas must be considered as a pan of the total solution, and the structural system must respond to it. 2. The Overall Proportions of the Tower. The relationship of the building to the surrounding environment and other existing buildings and plazas may dictate the proportions of the tower itself. It is, of course, obvious that a flat narrow tower will have a higher heighttowidth ratio, which normally would mean more lateral sway. The increase in heighttowidth ratio will generally mean increase in premium for height caused by additional material required to reduce lateral sway, as well as to increase resistance to overturning. Therefore, where slender buildings is an important requirement it is essential to find alternate structural solutions of higher efficiency even though su。外文翻译----高层建筑设计标准
相关推荐
guish noise from the signal solely based on coefficient magnitudes is violated when noise levels are higher than signal magnitudes. Under this high noise circumstance, the spatial configuration of
development strategy. The units in their plans because of the foothold, the focus of the restrictions, it is inevitable to consider only local interests, the petent departments of the project and
内有积液局部体征可有 _移动性浊音 __,空腔脏器穿孔 X 线可见 __隔下游离气体 _,肝浊音界可 _缩小或 消失 ___。 11.急性大出血患者出血量达 __400_ml 时可出现休克早期症状,若出血量 __800__ml 时可出现休克症状。 12.肠梗阻的四大症状是 ___痛 ______、 ___吐 ______、 ___胀 ____、 __闭 _____。
厚 以内时可一次粉刷到位。 当抹灰总厚度大于或等于 15mm 时,应分层粉刷,抹灰总厚度大于或等于 35mm,应有加强措施。 养护:由于本工程地处江边,风大,特别是外墙施工,易使水泥砂浆失水,产生收缩,容易引起开裂空鼓。 因此必须在粉刷完在水泥砂浆初凝后终凝前这一段时间内采用喷雾器进行表面喷水养护,养护标准以表面湿润为准。 当水泥砂浆终凝后,养护改用水管冲水养护,养护时间不少于 7 天
6 高压水枪 清洗墙面 涂装前, 外墙墙面必须牢固、干燥、清洁和无浮灰,可根据情况采取以下不同方法处理: 新墙(未上过漆) ,混凝土、抹灰墙面应有足够的养护期。 2 墙体湿度 — 砖石、砂浆墙面的湿度应在 10%以下。 3 水泥墙面的碱性 — 混凝土、水泥沙浆墙面的碱性应保证 PH 值小于10。 4 用适当工具除去墙体表面的灰浆渣及突起部位。 5 细小油脂污物及粉尘使用中性清洁剂或溶剂清洗
后将清洁剂涂在玻璃或墙角上,稍后用刮条、或刷水擦拭,最后用抹布将墙面揩干。 (4)一个位置工作结束,缓缓调整至下一个位置继续清洁直该纵向位置至 工作结束,然后再横向移动位置; (5)整个工作过程中,安全监督应自始至终作现场安全监督,不得擅离职守; (6)清洗玻璃幕墙严禁使用碱性清洁剂,否则会造成幕墙镀膜在半月左右斑脱、褪色等严重后果。 操作结束: (1)将吊绳、安全绳收好,并检查一遍被损情况。