greargument写作范文之内容摘要:

thos and Palean. But clearly these facts are not strong enough to support the argument. Instead, several logic fallacies mitted in the reasoning undermine the conclusion. First of all it has been assumed that the Palean baskets were not transmitted to Lithos. To support this assumption, it has been further assumed that the only way to transfer the baskets is by crossing the Brim River (if it did exist at the prehistoric time). On the basis of these assumptions, the author provides information that the Palean people could not be possible to cross the river and that they did not need to cross the river. However, what has been neglected is that there might exist other ways to transmit the baskets. For instance, the Palean people sent or sold their baskets to a neighbor tribe who was able to cross the Brim River and the tribe did bring the Pelean baskets to th。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。