en14350-1中英文对照版本t内容摘要:
conditioning and testing EN ISO 291,塑膠 前处理及测试的标准环境 . EN ISO 2409, Paints and varnishes Crosscut test (ISO 2409:1992). EN ISO 2409,油漆及清漆 十字切劃測試 (ISO 2409:1992). EN ISO 3696, Water for analytical laboratory use Specification and test methods (ISO 3696:1987). EN ISO 3696,實驗室使用的分析水 規格及測試方法 (ISO 3696:1987). ISO 188, Rubber, vulcanized or thermoplastic Accelerated ageing and heat resistance tests. ISO 188,橡膠 ,硬化或熱塑性 加速老化及抗熱測試 . 3 Terms and definitions術語及定義 For the purposes of this document, the following terms and definitions apply. 以下之技术术语适用于本标准 . feeding teat 喂養奶嘴 Substitute mother„s nipple that when attached to a container permits a child to obtain fluid by suckling 连接在一个容器上使婴儿可以在吸吮时进食的母亲奶头的替代品 . drinking accessory 飲水附件 Any device other than a feeding teat which permits a child to obtain fluid from a container EXAMPLE feeding spout 除了喂養奶嘴之外 ,允許兒童獲得其 容器内部 之液體的任何設備 .例如喂養管 . 吸管 Hollow tube drinking accessory through which fluid is sucked 中空的管子 ,通過它吸吮液體的飲水附件 . 容器 Either a feeding bottle, drinking cup or feeding bag. 一個喂養瓶 ,飲水杯或喂養袋 . bottle 喂養瓶 Container which is capable of holding a fluid and incorporates a graduated scale suitable for visual measurement and is intended for feeding a child through a feeding teat or drinking accessory 能 盛装 液體及標有 相应 之刻度 以 方便 目视 測量 容积 的容器 , 并 通過一個奶嘴或飲水附件 给 兒童 喂食 . cup 飲水杯 Container other than a feeding bottle or feeding bag capable of holding a fluid intended for feeding a child 除了奶瓶或喂養袋之外能容納液體供喂養兒童用的容器 . bag 喂養袋 Bag capable of holding fluid and supported for use by a holder NOTE Feeding bags are also known as feeding liners 能容納液體通過一個固定器支撐使用 的袋子 . 备注 :如襯墊一樣認知喂養袋 . ring環蓋 Component used to secure a feeding teat or drinking accessory to a container 将 奶嘴或飲水附件 固定在 一個容器上的部件 . disc密封 环 Component used to create a seal between the container and the locking ring 在容器與圓環蓋上 使用的 一個密封部件 . cover 安全帽 (保护盖 ) Component to cover a feeding teat or drinking accessory 蓋在奶嘴或飲水附件上的部件 . ponents 區配部件 Any of the above defined ponents which are used together whilst feeding a child 當喂養兒童時 ,上述部件 一起 相互配合 使用的部件 . graduations 帶有數值的刻度 Numbered markings which indicate the volume of fluid within the container 显示 容器內液體體積的帶有數值的刻度標記 . feeding teat, drinking accessory or container 一次性的 奶嘴 ,飲水附件或容器 Any item of drinking equipment sold for singleuse 任何出售作 一次性 使用的飲水設備 . 重复 使用 Component intended to be used again after first use 第一次使用后 能重复 使用的部件 . protrusions 突出 物 Drinking accessory, feeding teat or spoon, excluding straws 飲水附件 ,奶嘴或調羹 ,包括吸管 . 4 Description Figures 1, 2, 3, 4 and 5 illustrate typical examples of different items of drinking equipment and their design features. 記述 插圖 (圖 及 5)說明不同型號飲水設備及設計特點的典型例子 . Figure 1 — Design features of a feeding teat Key 1 Nipple 2 Feeding Hole/Holes Figure 2 — Examples of feeding teats Key 1 Feeding spout 2 Trainer spout 3 Straw 4 Trainer spoon Figure 3 — Examples of drinking accessories Key 1 Protective cover 2 Locking ring 3 Feeding teat 4 Sealing disc 5 Feeding bottle 6 Feeding bag 7 Numbered graduations 8 Holder for feeding bag Figure 4 — Examples of containers with feeding teats Key 1 Drinking cup 2 Drinking accessory/feeding spout Figure 5 — Example of container with drinking accessory 5 Requirements要求 General通用 Drinking equipment shall conform to to . 飲水設備應 符合 ~ Visual and tactile examination目 視及觸覺檢查 All ponents of drinking equipment when assembled for use shall be free from points and edges which are likely to cause injury. 所有飲水設備的部件在裝配使用時 ,不能出現很可能引起傷害的銳尖及利邊 . Small parts 小物件 All parts which are designed to be detached (. for cleaning) shall not fit entirely within the small parts cylinder (see Figure 6) in any orientation and without pression. 所有設計成 (为便于 清潔 )可 拆装的 部件 在没有 壓 力作用时在任何方向上都不能完全 裝 入 小物件筒里 (見圖6). Figure 6 — Small parts cylinder Volume Volumetric labelling容积标识 All feeding bottles, but not necessarily drinking cups, shall be marked with graduations at least in milliliters. 除了飲水杯之外的所有喂養瓶應至少用毫升 为单位 標記刻度 . Feeding bottles 喂养 奶瓶 All feeding bottles shall be marked at least once with the letters “ml”. NOTE 1 Additional units for measurement can be used if applicable. NOTE 2 Although this document only requires the provision of numbered graduations, further unnumbered graduations in any position may be provided. The lowest numbered graduation shall not be more than 60 ml. The highest numbered graduation shall be equal to the nominated maximum measurable use of the feeding bottle or container, . 125 ml, 250 ml, 320 ml. The gap between numbered graduations shall not exceed 60 ml. 所有奶瓶至少用字母 “ml”標記一次 . 备注 1 如 可能 ,可使用其它的测量单位作为附加单位标识在奶瓶上 . 备注 2 雖然本文件僅要求有數值刻度的規定 ,也可在任何位置提供 增加 無數值 的 刻度 . 最低的數值刻度不應超過 60ml. 最高的數值刻度應等於奶瓶或容器推薦最大的測量使用值 ,如 125ml,250ml,320ml. 兩個數值刻度間的距離不能超過 60ml. Drinking cups Where drinking cups have one or more numbered graduations, the letters “ml“ shall appear at least once. NOTE 1 Additional units for measurement can be used if applicable. Where a single numbered graduation is present on drinking cups it shall indicate the nominated maximum measurable use of the drinking cup, . 125 ml, 250 ml, 320 ml. Where more than one numbered graduation is present on drinking cups, the gap between graduations shall not exceed 60 ml. 飲水杯 飲水杯有一個或以上的數值刻度時 ,字母 “ml”應至少出現一次 . 备注 1 如 可能 ,可使用其它的测量单位作为附加单位标识在部件上 . 當飲水杯上只有一個 數值刻度時 ,該數值應表明飲水杯推薦最大的測量使用值 , 如 125ml, 250ml, 320ml. 當飲水杯上有 多 個 數值刻度時 , 兩個數值刻度間的距離不能超過 60ml. Volumetric accuracy When tested in accordance with the volumetric accuracy of numbered graduations on feeding bottles and drinking cups (if marked with numbered。en14350-1中英文对照版本t
相关推荐
,并提高效率。 提供方便使用的废物箱。 标明逃生路线,并清除障碍物。 手动工具 用特制的工具进行重复性的工作。 提供安全电动工具并确保安全装置可使用。 在同一地点进行重复性的操作请使用悬挂工具。 使用材料或机件 时采用钳子和夹子来固定。 使用精密工具时提供手工支持。 使工具(除打击工具外)的重量减少到最小。 选择能用最小力量操作的工具。 为手动工具提供有适当厚度、大小、长度和外形的把手以便使用。
020 EN 980:2020 (E) Foreword 前言 This doc u me nt (E N 980:200 8) has been prepared by Tec hnic al Com mittee CE N/CL C/TC 3 Q uality man age m ent and c orres pondi ng general as pec ts for me dic al
c) 与环境和职业健康安全管理体系有关的记录; d) 外来文件 (包括环境和职业健康安全方面的法律法规、标准、规范、条例和其他要求等 ); 文件的编号与检索 文件编号方法 公司体系文件编号方法: 按 Q/ SC24/ 28( Z) XXX— 2020,之标准模式要求执行,其中: Q—— 代表企业标准 SC—— 代表 XXX 机重工有限公司 24 —— 代表环境标准 28 ——
snobbish, caustic, selfish and simpleminded Joseph Sedley: vain, selfish, effeminate William Dobbin: goodnatured, honest III. Comparison between Thackeray and Dickens similarities: ① both