雅思写作素材-雅思写作的五点建议内容摘要:
第三 : 话题相关词汇与表达匮乏。 地址:北京市海淀区知春路紫金数码园东华合创大厦 9层 邮编: 100190 网站: Page 2 of 3 雅思写作 TASK 1 主要涉及图表描述语言,因此相关的词语必须熟记。 而且表达同一概念的时候应该有多种方式,换词,换词性。 TASK 2 涉及到除了政治宗教等差不多方方面面,于是涉及相关的一些热门话题诸如教育,环境,文化等词语和表达必须知道。 比如关于环境方面的,全球气候变暖怎么说,温室气体怎么说,二氧化碳怎么说,海平面上升怎么说。 因为这些都是你在表达观点进行陈述时必须用到词语。 因此早早进行分类记忆,对于后期写作大有帮助。 第四 : 同学在写作中一味追求模板范文。 每次改作文,十个学生有九个一开头都是 “With the develop。雅思写作素材-雅思写作的五点建议
相关推荐
understanding of their faults 时刻提醒自己不再犯相同的错误 prevent them from mitting the same errors 不敢勇于尝试和面对失败 afraid to try and fail 表现出不足够的自制 fail to demonstrate considerable selfregulation 缺乏独立性 lack of
However, by 2020 this trend has changed considerably。 the Japanese doubled their annual GDP over this period and there was also an increase in the GDP of Ecuador, while Tunisia fell to % per year. In
giving me first aid and taking me to a nearby hospital, I fear that the consequences might have been much more serious. The doctor says that my broken leg is healing well, and the bruises and cuts I
differentiates a person who has been trained to play a sport or an instrument, from those who bee good players. In other words, there is more to the skill than a learned technique, and this extra