阀门部件中英文对照内容摘要:

Thin Gate Valves 不封闭式 Unseal type 槽车 Tank Lorry Ball Valves 颤振 Flutter 常闭式 Normally closed type 常开式 Normally open type 超 Cryogenic valve 超高压 Super high pressure valve 超过 压力 Overpressure of a safety valve 衬胶隔膜阀 rubber lined diaphragm 衬胶 rubber lined globe valve 垂直板式 Vertical disc type butterfly valve 磁耦合(球形截流阀) id=tag_keys_links Magic Cooperate Globe Valves 带补充载荷的 Supplementary loaded safety valve 带辅助装置的 Assisted safety valve 单阀碟双面平行 密封 parallel single disk gate valve 单口排气阀 Single Opening Exhaust Valves 单向阀 Nonreturn Valve 单闸板 Single gate disc 单闸板平板 Single Disc Flat Gate Valves 弹簧薄膜式活塞式可调 id=tag_keys_links Spring diaphragm reducing valve 弹簧式 Direct spring loaded safety valve 弹簧座 Spring plate 弹性闸板 Flexible gate disc 当量计算排量 Equivalent calculated capacity 挡板 damper 导阀 Pilot valve 导向套 Valve guide disc guide Subzero valve 低压 Low pressure valve 底阀 bottom valve 底阀 Foot valve 电磁动装置 Eletro magic actuator magic valve solenoid valve 电磁-液动装置 Eletro magichydraulic actuator 电动阀 mortor operated valve 电动阀 motorized valve 电动 Electric Actuated Stop Valves 电动平行式双闸板闸板 Electric Double Disk Parallel Gate Valves 电动楔式 Electric Actuated Wedge Gate Valves 电动装置 Electric actuator 电-液动装置 Eletro hydraulic actuator 电液伺服阀 electrohydraulic servovalve 调节弹簧 Regulation spring adjusting valve control valve regulating valve 调节螺套 Adjusting bolt Adjusting screw 调节圈 Adjusting ring 蝶板 Disc ;瓣阀 butterfly valve ;瓣阀;拍门;铰链阀 flap valve 蝶式缓冲 Butterfly Type Nonslam Check 蝶式 Butterfly swing check valve 定比 Proprutioning pressure reducing valve 定差 Fixed differential reducing valve 定值 Fixed pressure reducing valve 动态特性 Dynamic characteristics 对焊连接阀 Buttwelding valves 对夹蝶板阀 Wafer plate valves 对夹式衬胶 Wafer Type Butterfly Valves with Rubber Itning 对夹式 阀门 Clamp valves 对夹式 Wafer Check Valves 额定排量 Certified capacity 额定排量系数 Derated coefficient of discharge 二通阀 Twoway valves 阀 valve 阀板 valve deck plate 阀板 valve plate 阀板式活塞泵 valve deck plate type piston pump 阀板式活塞泵 valve plate type piston pump 阀瓣 Disc 阀操 纵杆 valve operating rod 阀痤槽 valve seat recess 阀挡 valve grid 阀挡 valve positioner 阀挡 valve stop 阀导杆 valve tail rod 阀导向器 valve guide 阀盖 bon 阀盖衬套 bon bush 阀盖垫片 bon gasket 阀杆 stem 阀杆 valve rod 阀杆 valve spindle 阀杆端部尺寸 Dimmension of valve stem end 阀杆环 stem ring 阀杆螺母 Yoke bushing Yoke nut 阀杆填料 stem packing 阀杆头部尺寸 Dimension of valve stem head 阀簧 valve spring 阀簧压板 valve spring plate 阀控水锤泵 valvecontrolled hydraulic ram 阀框架 valve yoke 阀门 Valve 传动装置 valve bandle set 和管件 Va lves and Fittings 盘根 valve packing 手柄 valve handle 阀盘 disc 阀盘 valve disc 阀片 Disc 阀球 valve ball 阀驱动臂 valve driving arm 阀驱动臂 valve motion arm 阀式活塞 valve type piston 阀式活塞 valve type bucket 阀室式活塞泵 valve box type piston pump 阀室式活塞泵(美) valve pot type piston pump 阀抬起装置 valve lifting device 阀体 body 阀体 valve body 阀箱 valve box 阀箱 valve cage 阀箱 valve chest 阀箱;阀限位器 valve guard 阀箱盖 cover for valve box 阀箱盖 valve box cover 阀箱式活塞泵(美) turret type piston pump 阀形活塞泵 valve type piston pump 阀座 Seat ring 阀座 valve carrier 阀座 valve seat(body seat) 阀座;阀盘 valve seat 阀座环 seat ring 阀座 密封 嵌条 sealing strip for valve seat 法兰 flange 法兰堵头 blind flange 法兰端 flange end 法兰接头 flange joint 法兰连接紧固件(双头螺栓和螺帽) flange bolting 法兰 密 封 面,法兰面 flange facing 法兰面加工 flange facing finish 法兰 Flange Ball Valves 翻板阀 Flap 反冲盘 Disc holder 反向作用式 Reverse acting reducing valve 反向作用式 Reverse acting reducing valve 放空阀 emptying valve 放气阀 air vent valve。 vent valve 放气阀;排气阀 air evacuation valve 放泄阀 escape valve 分置阀室式活塞泵 separate valve box type piston pump 分置阀室式活塞泵(美) side pot type piston pump 封闭式 Seal type 浮动式 Float ball valve 浮球 Ball float 浮 Float Valve 浮球式 Ball float steam trap 浮球式 Free Float Type Steam Trap 浮桶 Bucket float 浮桶式 Open bucket steam trap 辅助( 副)阀 Auxiliary valves 负荷率 Rate of load condensate 附加背 压力 Superimposed back pressure 复位弹簧 Returnning spring 杠杆式 Lever type 杠杆式 Lever and weight loaded safety valve 杠杆式 Lever reducing valve 高温 High temperature valve 高压 High pressure valve 格兰 密封 gland 隔离阀 isolating valve 隔膜 Diaphragm 隔膜阀 diaphragm valve 隔膜式控制阀 diaphragm operated trol valve 工作背压 Operating back pressure 工作温度 Operating temperature 工作温度 Working temperature 工作压差 Operting differential pressure 工作 压力 Operating pressure 工作 压力 Working pressure 公称通径 Nominal diameter 公称 压力 Nominal pressure 固定式 Fixed ball valve 关闭 压力 Lockup pressure 关阀过冷度 Subcooled temperature of close valve 关阀温度 Closing valve temperature 管道 Piping Safety Valves 过冷度 Subcoold temperature 过流阀 (或节流阀 ) Restrictor Valves 喉径 Throat diameter 滑阀 slide valve 滑阀式回转活塞泵 rotary piston pump with slide gate 滑阀型转子泵 eccentric rotary pump with sliding sleeve 环形阀 annular valve 环形阀 double beat valve 换向阀 selector valve 换向阀 shuttle valve 回转滑阀活塞泵 piston pump with rotary gate 回座 压力 Reseating pressure of a safety valve 活塞暱 Piston reducing valve 活塞式阀 piston valve 活塞式阀;柱塞式阀 plunger valve 活塞式 Piston reducing valve 减速阀 Deceleration valves 减压比 Pressure reducing ratio pressure reducing valve 浆液阀 Parallel Slide Valves 角阀 Angle Valve 角阀 isolation valve angle configuration 角 式 Angie type 角式节流阀 Angle Throttle Valves 角式 Angle Stop valves 铰链阀;片状阀 flapper valve 节流阀 throttle valve 节流阀 choke valve 节流阀;节流 throttle 结构长度 Facetoface dimension Endtoend dimension Facetocentre dimension 结构形式 Type of construction Globe valve Shutoff Valve ;关断阀 shutoff valve 截止式隔膜阀 Globe diaphragm valve 紧急切断阀 Emergeny Cutoff Valves 进气阀 air intake valve 进水阀; inlet valve 静态特性 Static charact。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。