阀门中英文对照表内容摘要:

High pressure valve 格兰密封 gland 隔离阀 isolating valve 隔膜 Diaphragm 隔膜阀 diaphragm valve 隔膜式控制阀 diaphragm operated trol valve 工作背压 Operating back pressure 工作温度 Operating temperature 工作温度 Working temperature 工 作压差 Operting differential pressure 工作压力 Operating pressure 工作压力 Working pressure 公称通径 Nominal diameter 公称压力 Nominal pressure 固定式球阀 Fixed ball valve 关闭压力 Lockup pressure 关阀过冷度 Subcooled temperature of close valve 关阀温度 Closing valve temperature 管道安全阀 Piping Safety Valves 过冷度 Subcoold temperature 过流阀 (或节流阀 ) Restrictor Valves 喉径 Throat diameter 滑阀 slide valve 滑阀式回转活塞泵 rotary piston pump with slide gate 滑阀型转子泵 eccentric rotary pump with sliding sleeve 环形阀 annular valve 环形阀 double beat valve 换向阀 selector valve 换向阀 shuttle valve 回转滑阀活塞泵 piston pump with rotary gate 回座压力 Reseating pressure of a safety valve 活塞暱减压阀 Piston reducing valve 活塞式阀 piston valve 活塞式阀;柱塞式阀 plunger valve 活塞式减压阀 Piston reducing valve 减速阀 Deceleration valves 减压比 Pressure reducing ratio 减压阀 pressure reducing valve 浆液阀 Parallel Slide Valves 角阀 Angle Valve 角阀 isolation valve angle configuration 角式 Angie type 角式节流阀 Angle Throttle Valves 角式截止阀 Angle Stop valves 铰链阀;片状阀 flapper valve 节流阀 throttle valve 节流阀 choke valve 节流阀;节流 throttle 结构长度 Facetoface dimension Endtoend dimension Facetocentre dimension 结构形式 Type of construction 截止阀 Globe valve 截止阀 Shutoff Valve 截止阀;关断阀 shutoff valve 截止式隔膜阀 Globe diaphragm valve 紧急切断阀 Emergeny Cutoff Valves 进气阀 air intake valve 进水阀;进口阀门 inlet valve 静态特性 Static characteristics 静态特性偏差 Static characteristics derivation 开阀过冷度 Subcooled temperature of open valve 开阀温度 Opening valve temperature 开启高度 Lift 壳体试验 Shell test 壳体试验压力 Seal test pressure 空气阀门 Air valves 快速排污阀 Quick Draining Valves 类型 Type 冷凝结水排量 Cold condensate capacity 冷态试验差压力 Cold differential test pressure 理论排量 Theoretical flowing capacity 连接槽尺寸 Dimension of connecting channel 连接尺寸 Conncetion cimension 连接形式 Type of connection 帘面积 Curtain area 流道面积 Flow area 流道直径 Flow diameter 流量孔板 flow orifice plate 流量控制阀 flow control valve 流量特性 Flow characteristics 流量特性偏差 Flow characteristics derivation 漏汽量 Steam loss 脉冲式疏水阀 Impulse steam trap 密封面 Sealing face 密封试验 Seal test 密封试验压力 Seal test pressure 明杆平行式双闸板闸板 Double Disk Parallel Gate Valves 明杆闸阀 Outside screw stem rising through handwheel type gate valve 膜片。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。