量子化学中常见英文缩写的意思英文版内容摘要:
ory) BD Brueckner (orbitals with) double (substitution) (in electron correlation) BDE bond dissociation energy. BDT Brueckner (with) double (and) triple (substitutions) BDTQ Brueckner (with) double, triple, (and) quadratic (substitution) BEA binary encounter approximation BEBO bond energy bond order method BEBO/R relaxed bond energybond order method BET bond equilibrium theory BF (1) body fixed (see BFF) (2) BuckinghamFowler potential function . Buckingham and . Fowler, J. Chem. Phys., 79, 6426 (1983) BFBF body frame Bessel function BFF body fixed frame (for quantum scattering calculations) . Pack, J. Chem. Phys., 60, 633 (1974) BFT bonded function theory BGK BhatnagarGrossKrook (kiic theory model for reactive collisions) BH Barbanis hamiltonian BHF (1) brokensymmetry HartreeFock (2) BruecknerHartreeFock BI bond increment (method in cals. on large molecules) BJH BoppJancsoHeinzinger (potential function) BK BrinkmanKramers (approxn. in ionmolecule collision quantum cal.) BKC Bornvon Karman cell (model for electronic structure cal.) BKCM BurkhardtKonyaCoulsonMarch (for electron momentum densities) BKW BobylevKrookWu (method for solving the Boltzmann equation for a mol. system) BLB BrillouinLevyBerthier (theorem in MO theory) BLCAO bilinear bination of atomic orbitals BLMO (1) best limited basis molecular orbital (2) Boys localized molecular orbital BLYP BeckeLeeYangParr (densityfunctional theory) BMMO best minimal molecular orbital BMV BerthierMillieVeillard method (semiempirical MOSCF) BO (1) biorthonormal (wave function) (2) bond orbital (3) Born Oppenheimer (4) Brueckner orbital (5) bond order BOA (1) bidirectional orbital approximation (in valence bond theory) (2) bond orbital approximation (3) bond orientational anisotropy (4) BornOppenheimer approximation BOARS BornOppenheimer angular radial sepn. (in molecular plexes cals.) BOAW bondorder alternation wave BOC bondorder conservation (model in cals. on reactions) BOCMP bond order conservationMorse potential BOCV biorthogonality constrained variation method BODC BornOppenheimer diagonal correction (in molecular cals.) BOM bond orbital model BOO (1) bond order orbital (2) bond orientational order BORT bond orbital resonance theory BOVB biorthogonal valence bond BOW bondorder wave BPDA Born point dipole approximation BPFT BohmPinesFockTani (hamiltonian in cals. on plasmons) BQMCT basis quantum montecarlo theory (for many electron systems) BR Barker and Ridge (model for calculation of ionmolecule capture rates) T. Su and . Bowers, in Gas Phase Ion Chemistry, edited by . Bowers, (Academic Press, New York, 1979), Vol. 1, p. 83 BRNO best radial natural orbital BRW biased random walk (model for collisional energy transfer) . Lim and . Gilbert, J. Chem. Phys., 92, 1819 (1990). BS breathing sphere (approxn. in molecularscattering cals.) BSA breathingsphere approxn. (for inelastic molecular collisions) BSBL bond strengthbond length (model of atom abstraction reaction) BSM breathing shell model BSO (1) basic symmetric operator (in secondquantization calculations) (2)Brueckner spin orbitals BSPT Blizzard Santry perturbation theory BSQ boson second quantization BSSE basisset superposition error BT bonded tableaux BTUGA bonded tableau unitary group approach BWEN BrillouinWigner (secondorder perturbation theory with) EpsteinNesbet (energy denominators) BWPT BrillouinWigner perturbation theory C CAB (1) bination of atomic boxes (MO method) (2) core and bond (molecular partitioning method) CADPAC a puter program for solving the electronic Schr246。 dinger equation Amos et al., University of Cambridge CADW convergedadiabatic distortedwave (quantum cal. method) CAFEGE classically approximated freeelectrongas exchange CAHF configurationaveraged HartreeFock CAM plex angular momentum (for rotationally inelastic scattering) CAMM cumulative atomic multipole moment (for mol. charge distributions) CAOPM configurationaveraged optimizedpotential model CAS plete active space B. O. Roos, P. R. Taylor, and P. E. M. Siegbahn, Chem. Phys. 48, 157 (1980) CASCI plete active spaceconfiguration interaction CASGEN puter assisted structure generation J. Sadowski and J. Gasteiger, Chem. Rev., 93, 2567 (1993) CASMCSCF plete active spacemulticonfigurationSCF see CAS, MCSCF, SCF CASPT plete active spaceperturbation theory CASPT2 a perturbation method based on plete active space with secondorder perturbation theory K. Andersson, P. A. Malmqvist, and B. O. Roos, J. Chem. Phys. 96, 1218 (1992) CASSCF plete active space selfconsistent field theory (a version of multiconfiguration selfconsistent field theory for solution of the electronic Schr246。 dinger equation see CAS, SCF) . Roos, Int. J. Quantum Chem. Symposium 14, 175 (1980) CASSCFCCI plete active space selfconsistent fieldcontracted CI CASSI plete active spacestate interaction CASVMCSCF plete active space valence spacemulticonfigurationSCF CAUGA Clifford algebra unitary group approach CB CoulombBorn CB1 corrected first Born (perturbation theory in atomion collisions) CB2 secondorder Coulomb Born CBe CoulombBethe (for electronion scattering) CBE CoulombBornexchange CBEA constrained binary encounter approximation CBF correlated basis function CBLM clusterBethelattice method (for electronic structure cals. on crystals) CBO (1) corrected BornOppenheimer (in cals. for mol. plexe。量子化学中常见英文缩写的意思英文版
相关推荐
修改”或“撤回”字样。 在投标截止时间之后,投标人不得补充、修改投标文件。 根据本须知第 16 条的规定,在投标截止期与招标人在招标文件中规定的有效期终止日之间的这段时期内,投标人不能撤回投标文件,否则其投标保证金将被没收。 23.资格审 查 申请书材料的更新 投标人在提交投标文件时,如资格审 查 申请书中的内容发生重大变化,投标人须对其更新,以证明其仍能满足资格预审 评审标准
度培训计划》 德信诚 培训网 更多免费资料下载请进: 好好学习社区 与顾客有关过程的控制程序 SLQB202005 目的 明确与产品有关要求,力争达到顾客满意。 适用范围 适用于对顾客要求的识别,对本公司产品有关要求的评审及与顾客沟通。 职责 市场部负责识别顾客满意度。 工作程序 与产品有关要求的确定 市场部根据顾客规定的订货要求,如合同草案、技术协议草案及电话和口头订货。 : ①
三 . 建筑门窗及部品 建筑门窗主要包含外门窗及分户门,建筑部品主要栏杆、空调百叶及窗护栏等。 1 . 建筑门窗 1 .1外门窗主要采用铝合金及塑钢型材制作所采用的铝合金和塑钢型材及五金配件,除特殊需开模者外一律选用国家标准系列型材;除厨房、卫生间窗玻璃及玻璃幕墙外,一律选用普通双层中空玻璃。 1 .2外门开启可以选用平开及推拉方式;外窗开启可以选用外平开、内 平开、内开内倒
能发电有限公司金塔二 期 10MWp 光伏并网电站工程逆变器(含直流柜)、汇流箱、箱变设备采购 招标文件 合同编号: CXJTEQ/GFSB [2020]004 13 ⑵当单价与数量的乘积和总价不一致时,以单价为准,并修正总价及投标报价。 如果投标人不接受修正后的价格,则其投标将被拒绝。 评标委员会判断投标文件的响应性只根据投标文件本身的内容,而不依据外部的证据。