图像处理英文文献翻译-英语论文内容摘要:

utational procedure to design FDCP the design to need to involve to the big memory allocation, the regression analysis, the multi windows, data sharing and the position operation and so on many contents, therefore uses the objectoriented programming (OOP) Visual C++ is the relational schematic drawing. host which divides between the shape dimension putational procedure various functions module controls the module control entire procedure as the FDCP programming language. chart 4 the window frame to renovate, the news transmission and processing as well as each function sub module linking up with the sub window user area。 The image display module responsibly pletes in the sub window user area demonstrated divides the shape picture as well as the puted result。 The putation module includes 4 different putational methods the the sub module to halve the shape picture with different method the dimension to carry on the putation。 The data exchange module mainly uses in with other Windows procedure or software carries on data exchange. this procedure to use 2 different method, namely uses the clipboard and the WMF picture document and the data file. use visible programming language Visual C++ basic kind of storehouse (Microsoft Foundation Class: MFC) carries on the programming, may fully use the C++ language objectoriented programming the merit, can enhance the code to carry out the efficiency, guaranteed the procedure is easy to expand, the maintenance, the transplant, the code pact, the efficiency higher merit, simultaneously fully used the Windows platform to support the multi duties the characteristic, was easy to realize the different application procedure data exchange. other also to be allowed according to the need, to calculated the module to make the corresponding supplement, caused to increase the new putational method is easy. procedure to provide the extremely friendly user contact surface. chart 5 is FDCP had demonstrated 5 level of Koch curve main window contact surface. it had File, View, Fractal, Window and Help and so on the menu as well as respective under pull the menu position. among, the image display module uses MFC and the SDK mix programming, the procedure frame pletes using MFC. but because MFC brings the CBitmap kind of demonstration speed is slower, for the acceleration image display process, uses MFC the frame to transfer the SDK function to realize the demonstration function. because this procedure needs to support the many pictures document simultaneous working, therefore the FDCP procedure must use the MDI window form to carry on the design. for the confirmation procedure reliability, Separately used the straight line, the square, the Koch curve, kantuo 3 point array this 4 kind。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。