小王子英文读后感-英语论文内容摘要:

So that I may fet, replied the tippler. Fet what? inquired the little prince, who already was sorry for him. Fet that I am ashamed, the tippler confessed, hanging his head. Ashamed of what? insisted the little prince, who wanted to help him. Ashamed of drinking! the tippler said. The fouth pla was belong to a businessman, he was busy caculating figures every day ,It’s so funny that he also didn’ t koow what he did for . In the following days ,the little prince met a lamplighter,a were very strange , in the little views of little prince ,what they did are allmeaningless, At last ,the little prince came to the earth , The pure boy met a snake, he was like an old man who had gone through many snake’ s the base of the little prince’ s disappearance . After a long walk ,the little prince reached at a garden which was full of roses ,the roses in the garden were so many ,which made the little。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。