英语四六级作文经典美文美句内容摘要:

s a panionship of books as well as of men。 and one should always live in the best pany, whether it be of books or of men. A good book may be among the best of friends. It is the same today that it always was, and it will never change. It is the most patient and cheerful of panions. It does not turn its back upon us in times of adversity or distress. It always receives us with the same kindness。 amusing and instructing us in youth, and forting and consoling us in age. Men often discover their affinity to each other by the mutual love they have for a book just as two persons sometimes discover a friend by the admiration which both entertain for a third. There is an old proverb, ‘ Love me, love my dog.? But there is more wisdom in this:? Love me, love my book.? The book is a truer and higher bond of union. Men can think, feel, and sympathize with each other through their favorite author. They live in him together, and he in them. A good book is often the best urn of a life enshrining the best that life could think out。 for the world of a man’ s life is, for the most part, but the world of his thoughts. Thus the best books are treasuries of good words, the golden thoughts, which, remembered and cherished, bee our constant panions and forters. Books possess an essence of immortality. They are by far the most lasting products of human effort. Temples and statues decay, but books survive. Time is of no account with great thoughts, which are as fresh today as when they first passed through their author’ s minds, ages ago. What was then said and thought still speaks to us as vividly as ever from the 6 printed page. The only effect of time have been to sift out the bad products。 for nothing in literature can long survive e but what is really good. Books introduce us into the best society。 they bring us into the presence of the greatest minds that have ever lived. We hear what they said and did。 we see the as if they were really alive。 we sympathize with them, enjoy with them, grieve with them。 their experience bees ours, and we feel as if we were in a measure actors with them in the scenes which they describe. The great and good do not die, even in this world. Embalmed in books, their spirits walk abroad. The book is a living voice. It is an intellect to which on still listens. 第四篇: If I Rest,I Rust 如果我休息,我就会生锈 If I Rest, I Rust The significant inscription found on an old key? If I rest, I rust?would be an excellent motto for those who are afflicted with the slightest bit of idleness. Even the most industrious person might adopt it with advantage to serve as a reminder that, if one allows his faculties to rest, like the iron in the unused key, they will soon show signs of rust an。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。