电锅炉系统electricboilersystem中英文资料内容摘要:

n, and strongly burning furnace of cylindrical furnace known as the Tornado. Furnace crosssection of generally square or rectangular. Fuel bustion in the furnace flame and high temperature flue gas to form, so the stove around the furnace wall by the high temperature materials and thermal insulation materials. In the furnace wall on the inner surface of the regular laying of waterwall tube, it will not burn the protection of furnace wall and the flame and high temperature flue gas to absorb the large number of radiant heat. Furnace designed to take full account of the characteristics of the use of fuel. Each boiler shall be fueled with the original design as much as possible fuel. Burning characteristics of the larger difference in fuel economy when the boiler operation and reliability can be reduced. Drum is a natural cycle and multiple forced circulation boiler, the economizer to accept the water supply, circuit connection to the steam superheater cylinder delivery device described. Traditional drum made from high quality thick steel plate is a boiler in one of the most important ponents. Drum39。 s main function is water, soft drinks to the separation of pot ruled out running in the saline water and mud residue, to avoid high concentrations of salt and impurities in the boiler water with the steam entering the superheater and the steam turbine in. Device includes an internal drum separator and steam cleaning equipment, water distribution pipes, sewage processing equipment such as drugs. Separator device which is to e from the wall and the saturated steam from the water and to minimize the steam in small water droplets carried. , The lowpressure boilers used as a baffle and baffle gap separating coarse ponents。 over mediumpressure boiler in addition to a variety of widely used types of cyclone for the separation of rough, but also with 100 windows, steel mesh or steam, etc. are carried out further separated. Drum water level is also equipped with a table, a safety valve, such as monitoring and protection facilities. To assess performance and to improve the design, often have to go through the boiler heat balance test. Directly from the efficient use of energy to calculate the thermal efficiency of boiler is a balanced approach is called, from a variety of heat loss to the efficiency of counterbalance method is called counterbalance. Consider the practical benefits of the boiler room not only depends on the thermal efficiency of boilers, but also taking into account the auxiliary boiler and the amount of energy. Unit mass or unit volume of fuel bustion, the chemical reaction is calculated according to the。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。