汽车专业外文文献英文翻译内容摘要:
nded) to the possibilities of an ecological disaster on the horizon, maybe it’s time that we got over our need to drive huge SUVs and start moderating our fuel consumption. Then again, as gas prices hovering around $ and with no ceiling in sight, we may have little choice in the matter. Engine Operating Principles Most automobile dngines are internal bustion, reciprocating 4stroke gasoline engines, but other types have been used, including the diesel, the rotary ( Wankel ) , the 2srtoke, and stratified charge. Reciprocating means up and down or banck and forth, It is the up and down action of a piston in the cylinder blick, or engine block. The blick is an iron or aluminum casting that contains engine cylinders and passges called water jackets for coolant circulation. The top of the block is covered with the cylinder head. Which forms the bustion chanber. The bottom of the block is covered with an oil pan or oil sump. Power is produced by the linear motion of a piston in a cylinder. However, this linear motion must be changed into rotary motion to turn the wheels of cars of trucks. The piston is attached to the top of a connecting rod by a pin, called a piston pin or wrist pin. The bottom of the connecting rod is attached to the crankshaft. The connecting rod transmits the upanddown motion of the piston to the crankshaft, which changes it into rotary motion. The connecting rod is mounted on the crankshaft with large beaings called rod 北京化工大学北方学院汽车服务工程 —— 外文文献原稿和译文 bearings. Similar bearings, called main bearings, are used to mount the crankshaft in the block. Shown in Fig. 11 The diameter of the cylinder is called the engine bore. Displacement and pression ratio are two frequently used engine specifications. Displacement indicates engine size, and pression ratio pares the total cylinder volume to pression chamber volume. The term stroke is used to describe the movement of the iston within the cylinder, as well as the distance of piston travel. Depending on the type of engine the operating cycle may require either two or four strokes to plete. The 4stroke engine is also called Otto cycle engine, in honor of the German engineer, Dr. Nikolaus Otto, who first applied the principle in 1876. In the 4stroke engine, four strokes of the piston in the cylinder are required to plete one full operating cycle. Each stroke is named after the action it performs intake, pression, power, and exhaust in that order, shown in Fig12. Intake stroke As the piston moves down, the vaporized mixture of fuel and air enters the cylinder through open intake valve. To obtain the maximum filling of the cylinder the intake valve opens about 10176。 before ., giving 20176。 overlap. The inlet valve remains open until some 50176。 after . to take advantage of ining mixture. Compression stroke The piston turns up, the intake valve closes, the mixture is pressed within the bustion chamber, while the pressure rise to about 1Mpa, depending on various factors including the pression ratio, throttle opening and engine speed. Near the top of the stroke the mixture is ignited by a spark which bridges the gap of the spark plug. Power stroke The expanding gases of bustion produces a rise in pressure of the gas to some , and the piston is forced down in the cylinder. The exhaust valve opens near the bottom of the stroke. Exhust stroke The piston moves back up with the exhaust valve open some 50176。 before ., allowing the pressure within the cylinder to fall and to reduce ‘back’pressure on the piston during the exhaust stroke, and the burned gases are pushed。汽车专业外文文献英文翻译
相关推荐
ar which is attachedtothedifferentialcase Doublereduction final drives may be found on military design vehicles, such as the 5ton truck. Many mercially designed vehicles of this size use a single or
制及管理的规范性公司记账凭 证所附的原始凭证单据齐全,不存在原始单据另行存放的情况,并按照业务流程,将相关范文最新推荐 13 表单附于记账凭证之后。 根据业务管理需要,采购业务记账凭证后通常附有采购发票、采购合同或订单、外购入库单、进料检验单、付款单据。 销售业务记账凭证后通常附有销售发票、发货通知单、销售出库单,合同另行归档保管。 非经营性资金往来事项的记账凭证后通常附有政府补助协议或文件
度为 50km/h,即 m/s时 ,按式 (2),式 (3)计算 ,得 : 1一 2— — ~ — L一 (73。 一 )/a一 ( 一 )/— 式中 :液压系统的 t比规定的制动协调时间大 ≈ ,即 t1— +— . (2)其他汽车 ,汽车列车空载路试要求验算 . 按 GB72582020表 4,充分发出的平均减速度不小 于。 按表 3,制动距离不大于 速度为 30km/h=
卡、嘉宾胸花、剪彩用具、雨衣雨伞、领导题词所需用品等由专人负责。 (一)城区外场布置 主礼区前道路外围彩虹门两道 24 米,布于两侧中心线 100 米外;飘球 10 对;彩旗 800 面; 路口彩虹门一道 24 米;飘球 4 对(四方路口向); 酒店前路口彩虹门一道 18 米;飘球 4 个; 四、气氛营造 1、礼仪小姐 A、数量: 10 位 B、规格:专业 C、位置:主席台两侧及休息接待处、酒店
不得检出 总排口 56 甲基对硫磷 所有排污单位 不得检出 不得检出 总排口 57 马拉硫磷 所有排污单位 不得检出 不得检出 总排口 58 11 种有机磷农药总量 b 所有排污单位 不得检出 不得检出 总排口 59 五氯酚及五氯酚钠 (以五氯酚计 ) 所有排污单位 总排口 60 氯苯 所有排污单位 总排口 61 对-硝基氯苯 所有排污单位 总排口 62 2, 4-二硝基氯苯 所有排污单位
度,减少接缝,是整个箱梁底板外观质量控制的关键。 ( 3)箱梁钢筋采用 预制厂后场加工,钢筋台座绑扎,整体吊放的工艺进行,如何 21 保证整体吊放过程中,整个钢筋笼的刚度,减少吊装变形,提高箱梁保护层厚度合格率是箱梁钢筋施工的关键。 ( 4) 箱梁预制施工 预应力波纹管安装线性控制, 预应力 张拉施工控制 等是箱梁预应力施工控制的关键。 ( 5)箱梁预制过程中外模及内模安装精度控制