数据采集外文翻译内容摘要:
ue input channel, each channel can output 16 the digital quantity. Six channel simultaneous sampling, and conversion, timeshare transmission, effectively reduce generated due to the sampling time different phase error. SY 5402EVM onboard DSP chip is TI pany39。 s 16 fixedpoint digital signal processor TMS320VC5402. It has high costperformance and provide highspeed, bidirectional, multichannel belt cushion, be used to serial port with system of other serial devices directly interface. The realization method of ac sample: In the field of power quality analysis,The fast Fourier transform (FFT) algorithm analysis of electric system harmonic is monly the FFT algorithm to signal a strict requirements synchronous sampling. The synchronous sampling influence: it39。 s difficult to acplish synchronous sampling and integer a period truncation in the actual measurement, so there was a affect the measurement accuracy of the frequency spectrum leakage problem. The signal has to deal with through sampling and A/D conversion get limited long digital sequence,the original signal multiplied by A rectangular window to truncated. Timedomain truncation will cause the detuning frequency domain, spectrum leakage occurs. In the synchronous sampling, because the actual signal every harmonic ponent can39。 t exactly landed in frequency resolution point in, but fall between the frequency resolution points. But FFT spectrum is discrete, only in all sampling points, while in other places of spectrum is not. Such through FFT and cannot directly get every harmonic ponent, but only the accurate value in neighboring frequency resolution point value to approximate instead of, can cause the fence effect realization method of synchronous sampling signal: According to provide different ways of sampling signal, synchronous sampling method and divided into software synchronous sampling method and hardware sy。数据采集外文翻译
相关推荐
成电路,硬件高度集成,体积小,进一步提高了系统可靠性。 (5)使用维修方便。 cNc 装置有诊断程序.当数控系统出现故障时,能显示出故障信息,使操作和维修人员能了解故障部位,减少了维修停机时间。 cNc 装置有零件程 序编辑功能,程序编制很方便。 有的 cNc 装置还有对话编程和蓝图编程功能,使程序编制简便。 零件程序编好后,可显示程序,甚至通过空运行将刀具轨迹显示出来,检验程序的正确性。
国防、航空、航天事业的发展和能源等基础产业装备的大型化需要大型且性能良好的数控机床的支撑。 而超精密加工技术和微纳米技术是 21 世纪的战略技术,需发展能适应微小型尺寸和微纳米加工精度的新型制造工艺和装备, 所以微型机床包括微切削加工 (车、铣、磨 )机床、微电加工机床、微激光加工机床和微型压力机等的需求量正在逐渐增大。 (八) 信息交互网络化 对于面临激烈竞争的企业来说,使数控机床具有双向
太阳升高后,就会发出我们熟悉的白光。 在这种光线下,所有的物体都会呈现出自己应有的色彩,是表现色彩最为准确的光线环境。 数码相机入门教程 (四 )用光构图技巧 (图文版 )用光构图技巧光线的运用从摄影术诞生之日起,就被人们称为是 “ 用光作画 ”。 光线的运用直接关系到拍摄效果 —— 您拍出的是一幅留念照片还是一幅精彩作品往往就此确定。 对于光线应用而言,我们首先介绍光线的角度
谜》、《筛选与枚举》、《年龄问题》、《巧求周长》、《鸡兔同笼》、《植树问题》、《最不利原则》等几十个章节 四、教学 计划: 一年级: 数一数填一填 第几个和共几个 按规律填数 火柴棒游戏 图形与算式 相等与不相等 推算 数图形 加加减减 二年级: 对应 找规律 巧算 报数游戏 有趣的数
坐标轴 xaxis, yaxis, zaxis 横坐标 xcoordinate 纵坐标 ycoordinate 原点 origin 象限 quadrant 截距 (有正负之分 )intercede (方程的)解 solution 几何 geometry 点 point 线 line 面 plane 体 solid 线段 segment 射线 radial 平行 parallel 相交
所组成,如图 19- 4 所示。 由于 CC4013( c)的 D3 端接 VDD ,因此,在 P2 点所产生的上升沿作用下, CC4013( c)翻转,翻转后 3Q = 0,由于开机置“ 0”时或门( 1)(见图 2- 5)输出的正脉冲将 CC4013( c)的 Q3 端置“ 0”,因此 3Q = 1,经二极管 2AP9 迅速给电容 C2 充电,使 C2 二端的电压达“ 1”电平,而此时 3Q