张汉熙版高级英语第二册补充练习总结内容摘要:

. 4. The generator was doused, and the lights went out. (para 9) Water got into the generator and put it out. It stopped producing electricity, so the lights also went out. 5. Everybody out the back door to the cars! (para 10) Everybody go out through the back door and run to the cars. 6. The electrical systems had been killed by water. (para 11) The electrical systems in the car had been put out by water. 7. John watched the water lap at the steps, and felt a crushing guilt. (para 17) As John watched the water inch its way up the steps, he felt a strong sense of guilt because he blamed himself for endangering the whole family by deciding not to flee inland. 8. Get us through this mess, will You? (para 17) Oh God, please help us to get through this storm safely. 9. She carried on alone for a few bars。 then her voice trailed away. (para 21) Grandmother Koshak sang a few words alone and then her voice gradually grew dimmer and stopped. 10. Janis had just one delayed reaction. (para 34) Janis displayed rather late the exhaustion brought about by the nervous tension caused by the hurricane. Lesson Two Marrakech 词汇 (Vocabulary) thread (v.) : pass through by twisting, turning, or weaving in and out 穿过,通过 pomegranate (n.) : a round fruit with a red, leathery rind and many seeds covered with red, juicy, edible flesh; the bush or small tree that bears it 石榴;石榴树 chant (n.) : a simple liturgical song in which a string of syllables or words is sung to each tune(礼拜仪式唱的 )单调的歌 bier (n.) : a platform or portable framework on which a coffin or corpse is placed 棺材架;尸体架 hack (v.) : break up(1and)with a hoe, mattock, etc. (用锄等 )翻地,挖 (土 ) oblong (adj.) : longer than broad; elongated 长方形的 lumpy (adj.) : full of lumps; covered with lumps 多块状物的;凹凸不平的 hummocky (a.) : full of or looking like low, rounded hills 布满小丘的;似小圆丘的 derelict (adj.) : deserted by the owner; abandoned; forsaken 无主的;被遗弃的 lot (n.) : a plot of ground 一块地 undifferentiated (adj.) : without clear qualities or distinctive characteristics 无区别的;无显著特点的 mound (n.) : a heap or bank of earth, sand, etc. built over a grave, in a fortification, etc. 土堆;堤;坟堆 prickly (adj.) : full of prickles 多刺的 prickly pear : any of a genus of cactus plants having cylindrical or large, flat, oval stem joints and edible fruits 仙人掌 (属 ) bumpy (adj.) : full of bumps; rough; jolting 崎岖不平的;颠簸的;震摇的 gazelle (n.) : any of various small, swift, graceful antelopes 瞪羚 hindquarter (n.) : either of the two hind legs and the adjoining loin of a carcass of veal, beef, lamb, etc.; [p1.]the hind part of a four—legged animal(牛、羊、猪等 的 )后腿肉; [复 ](四肢动物的 )后躯 nibble (v.) : take small, cautious, or gentle bites 小口地咬;谨慎地咬 (啃 ) butt (v.) : strike or push with the head or horns: ram with the head(用头或角 )撞击;顶撞 midair (n.) : any point in space, not in contact with the ground or other surface 空中;上空 navvy (n.) : n unskilled laborer, as on canals, roads, etc. 劳工;无特殊技术的工人 sidle (v.) : move sideways, esp. in a shy or stealthy manner(羞怯或 偷偷地 )侧身行走 stow (v.) : pack or store away; fill by packing in an orderly way 装载;装进;收藏 municipality n. a city, town. etc. having its own incorporated government for local affairs 自治市 (或镇 ) ghetto (n.) : (in certain European cities)a section to which Jews were formerly restricted(某些欧洲城市中从前的 )犹太人居住区 高级英语 第二册 第 6 页 共 34 页 sore (adj.) : giving or feeling physical pain; painful 疼痛的;感到疼痛的 skullcap (n.) : a light, closefitting, brimless cap, usually worn indoors(室内戴的 )无沿便帽 infest (v.) : overrun or inhabit in large numbers, usually so as to be harmful or bothersome; swarm in or over(虫害等 )侵扰;骚扰;蔓延 booth (n.) : a stall for the sale of goods, as at markets or fairs(市场或集市上的 )货摊;摊店,摊棚 prehistoric (adj.) : pertaining to ancient times, very oldfashioned 老式的;古旧的 warp (v.) : bee bent or twisted out of shape 变 弯曲;变歪 frenzied (adj.) : full of uncontrolled excitement 疯狂的,狂乱的 clamour (v.) : make a loud confused noise or shout; cry out 喧嚷,喧嚣,吵闹 grope (v.) : feel or search about blindly, hesitantly, or uncertainly 摸索;探索 selfcontained (adj.) : having within oneself or itself all that is necessary; selfsufficient, as a munity 自给自足的 witchcraft (n.) : the power or practices of witches: black magic; sorcery 巫术;魔法 square (adj.[colloq.]) : satisfying; solid; substantial[口 ]令人满意的;充实的 conspicuous (adj.) : attracting attention by being unexpected, unusual, outstanding 惹人注目的,显眼的 grove (n.) : orchard 果园 legionnaire (n.) : a member of a legion 军团的成员 backbreaking (adj.) : requiring great physical exertion; very tiring 费劲的;辛苦的,累人的 desolate (adj.) : uninhabited; deserted 荒无人烟的,荒凉的 lucerne (n.) : a type of plant whose leaves grow in groups of three and which is used for feeding farm animals 紫花苜蓿 fodder (n.) : gorse food for cattle, horses, sheep, etc. as cornstalks, hay and straw(牛、马、羊的 )粗饲料;饲草 yoke (v.) : put a yoke on; join together; link 用轭连起;连合 ;连结 harrow (n.) : a heavy frame with spikes or sharp—edged disks, drawn by a horse or tractor and used for breaking up and leveling plowed ground, covering seeds, rooting up weeds, etc. 耙 furrow (n.) : a narrow groove made in the ground by a plow 沟,畦;犁沟 trickle (n.) : the act of trickling; a slow, small flow 滴,淌;细流 ; subsoil (n.) : the layer of soil beneath the surface soil 底土,下层土, mummify (v.) : shrivel or dry up 干瘪;枯干;成木乃伊状 hobble (v.) : go unsteadily, haltingly, etc. 蹒跚 leathery (adj.) : 1ike leather in appearance or texture. tough and flexible(外观或质地 )似皮革的;坚韧的,粗硬的 infuriate (v.) : cause to bee very angry; enrage(使 )发怒,激怒 damnably (adv.) : execrably 该诅咒地;极坏地 packsaddle (n.) : a saddle with fastenings to secure and balance the load carried by a pack animal 驮鞍 bridle (n.) : a head harness for guiding a horse 马勒 halter (n.) : a rope, cord, strap, etc., usually with a headstall, for tying。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。