单片机外文翻译--stc89c52处理芯片内容摘要:
external numerical memory, P2 mouth output P2 latches content. In programming and calibration, flash P2 mouth also absorb high eight address byte and some control signal. P3: a P3 mouth on the inside of the eight twoway pullup resistors I/O buffers can drive, p2 output four TTL logic level. For P3 port to write 1, the internal resistance to port, can push as input mouth. When used as input, external and internal foot because of low resistance, will output current IIL . P3 mouth AT89S52 special functions also as the second efficacy , are shown below. In programming and calibration, flash also absorb some P3 mouth control signals. Port pin second efficacy: RXD serial input TXD serial export , INTO the discontinuous 0 INT1 1 the discontinuous time/counter TO 0 T1 1 time/counter, WR external numerical memory write for RD external numerical memory read for In addition, also absorb some used in mp3 mouth FLASH memory programming and calibration of program control signals. RST, reset input: when the vibrator, RST pin appeared two machine cycle above high level will be reset the chip. ALE/PROG when access to external program memory or numerical memory, ALE address latch allow output pulses are used to latch address of low eight bytes. Normally, ALE with clock frequencies are 1/6 output pulse signal with fixed, so it can be used for the purpose or output clocks. Timing Those who want an attention is: whenever access to external numerical memory will skip a ALE pulse. For FLASH memory programming, this pin is used for input programming pulse . PROG If necessary, but through special effect to the zone registers SFR 8EH D0 position, the unit can be banned ALE operations. This position is a bit, MOVX and MOVC instructions will be activated. ALE In addition, the foot will be weak, execute external。单片机外文翻译--stc89c52处理芯片
相关推荐
下弦杆制动力计算 以下弦杆 E2E4为例,将活载作如图所示的布置,根据结构力学方法,当三角形影响线顶点左边的活载之和等于右边之和时,为产生最大杆力的活载布置位置。 单线铁路下承式栓焊简支钢桁梁桥课程设计 9 bRaR ba ? )(80)( 922205 xxx ???????? 解得 x= 故桥上活载总重 = )( ??????? 在主力作用下的内力已计入冲击系数,制动力按静活载的 7%计算:
案件中找不到正义 C. 维护法制程序的意义大于一时的伸张正义 D. 为了保证法制程序的实施,律师常常不得已而为之 14. 今年, 11 名高考 “状元”因面试成绩不理想被香港大学拒之门外。 这与内地高校追逐高分考生、为招收到“状元”而津津乐道、各地大捧高考“状元”等现象形成了鲜明的对比。 此举引来轩然大波,媒体纷纷将矛头指向“应试教育”。 笔者认为,香港大学招生和“素质教育”并没有太大的直接关系
wanders out of code space. • An external telemetry data storage memory to provide backup of data in the event of an interruption in data transmission. The brief description of each of the software
每小时小于 次时,可加下一级荷载。 ????(2) 桩顶上拔量观测:在桩顶两边沿直径方向对称安装位移计进行测读。 ????检测过程 本次试验采用两台千斤顶加载,将两个千斤顶分别放在支承墩上面,主梁的下面。 试验加荷方式为慢速维持荷载法,试桩每级荷载增量均为 100kN,应委托方要求最大试验荷载加至 1000kN。 试验进展顺利,未出现异常现象。 试桩在最大荷载作用下的桩顶上拔小于