单片机外文文献和中文翻译内容摘要:
wanders out of code space. • An external telemetry data storage memory to provide backup of data in the event of an interruption in data transmission. The brief description of each of the software tests used is given below. It should be noted that for each test, the returned telemetry (including time tag) was sent to both the test controller and the telemetry memory, giving the highest reliability that all data is captured. Interrupt – This test used 4 of 6 available interrupt vectors (Serial, External, Timer0 Overflow, and Timer1 Overflow) to trigger routines that sequentially modified a value in the accumulator which was periodically pared to a known value. Unexpected values were transmitted with register information. Logic – This test performed a series of logic and math putations and provided three types of error identifications: 1) addition/subtraction, 2) logic and 3) multiplication/division. All mispares of putations and expected results were transmitted with other relevant register information. Memory – This test loaded internal data memory at locations D:0x20 through D:0xff (or D:0x20 through D:0x080 for the CULPRiT DUT), indirectly, with an 0x55 pattern. Compares were performed continuously and mispares were corrected while error information and register values were transmitted. Program Counter The program counter was used to continuously fetch constants at various offsets in the code. Constants were pared with known values and mispares were transmitted along with relevant register information. Registers – This test loaded each of four (0,1,2,3) banks of generalpurpose registers with either 0xAA (for banks 0 and 2) or 0x55 (for banks 1 and 3). The pattern was alternated in order to test the Program Status Word (PSW) special function register, which controls generalpurpose register bank selection. Generalpurpose register banks were then pared with their expected values. All mispares were corrected and error information was transmitted. Special Function Registers (SFR) – This test used learned static values of 12 out 21 available SFRs and then constantly pared the learned value with the current one. Mispares were reloaded with learned value and error information was transmitted. Stack – This test performed arithmetic by pushing and popping operands on the stack. Unexpected results were attributed to errors on the stack or to the stack pointer itself and were transmitted with relevant register information. VII. TEST METHODOLOGY The DUT Computer booted by executing the instruction code located at address 0x0000. Initially, the device at this location was an EPROM previously loaded with Boot/Serial Loader code. This code initialized the DUT Computer and interface through a serial connection to the controlling puter, the Test Controller. The DUT Computer downloaded Test Code and put it into Program Code RAM (located on the Main Board of the DUT Computer). It then activated a circuit which simultaneously performed two functions: held the DUT reset line active for some time (~10 ms)。 and, remapped the Test Code residing in the Program Code RAM to locate it to address 0x0000 (the EPROM will no longer be accessible in the DUT Computer39。 s memory space). Upon awaking from the reset, the DUT puter again booted by executing the instruction code at address 0x0000, except this time that code was not be the Boot/Serial Loader code but the Test Code. The Test Control Computer always retained the ability to force the reset/remap function, regardless of the DUT Computer39。 s functionality. Thus, if the test ran without a Single Event Functional Interrupt (SEFI) either the DUT Computer itself or the Test Controller could have terminated the test and allowed the posttest functions to be executed. If a SEFI occurred, the Test Controller forced a reboot into Boot/Serial Loader code and then executed the posttest functions. During any test of the DUT, the DUT exercised a portion of its functionality (., Register operations or Internal RAM check, or Timer operations) at the highest utilization possible, while making a minimal periodic report to the Test Control Computer to convey that the DUT Computer was still functional. If this report ceased, the Test Controller knew that a SEFI had occurred. This periodic data was called telemetry. If the DUT encountered an error that was not interrupting the functionality (., a data register mispare) it sent a more lengthy report through the serial port describing that error, and continued with the test. VIII. DISCUSSION A. Single Event Latchup The main argument for why latchup is not an issue for the CULPRiT devices is that the operating voltage of volts should be below the holding voltage required for latchup to occur. In addition to this, the cell library used also incorporates the heavy dual guardbarring scheme [4]. This scheme has been demonstrated multiple times to be very effective in rendering CMOS circuits pletely immune to SEL up to test limits of 120 MeVcm2/mg. This is true in circuits operating at 5, , and Volts, as well as the Volt CULPRiT circuits. In one case, a 5 Volt circuit fabricated on noncircuits wafers even exhibited such SEL immunity. B. Single Event Upset The primary structure of the storage unit used in the CULPRiT devices is the Single Event Resistant Topology (SERT) [5]. Given the SERT cell topology and a single upset node assumption, it is expected that the SERT cell will be pletely immune to SEUs occurring internal to the memory cell itself. Obviously there are other things going on. The CULPRiT 8051 results reported here are quite similar to some。单片机外文文献和中文翻译
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
单片机外文翻译--stc89c52处理芯片
external numerical memory, P2 mouth output P2 latches content. In programming and calibration, flash P2 mouth also absorb high eight address byte and some control signal. P3: a P3 mouth on the inside
单线铁路下承式栓焊简支钢桁梁桥西南交通大学
下弦杆制动力计算 以下弦杆 E2E4为例,将活载作如图所示的布置,根据结构力学方法,当三角形影响线顶点左边的活载之和等于右边之和时,为产生最大杆力的活载布置位置。 单线铁路下承式栓焊简支钢桁梁桥课程设计 9 bRaR ba ? )(80)( 922205 xxx ???????? 解得 x= 故桥上活载总重 = )( ??????? 在主力作用下的内力已计入冲击系数,制动力按静活载的 7%计算:
单桩竖向抗拔静载试验报告
每小时小于 次时,可加下一级荷载。 ????(2) 桩顶上拔量观测:在桩顶两边沿直径方向对称安装位移计进行测读。 ????检测过程 本次试验采用两台千斤顶加载,将两个千斤顶分别放在支承墩上面,主梁的下面。 试验加荷方式为慢速维持荷载法,试桩每级荷载增量均为 100kN,应委托方要求最大试验荷载加至 1000kN。 试验进展顺利,未出现异常现象。 试桩在最大荷载作用下的桩顶上拔小于