剑桥雅思小作文真题集(4-8)内容摘要:

vant. Cambridge IELTS 6 TEST 1: The graph and table below give information about water use worldwild and water consumption in two different countries. Summarise the information by selecting and reporting the main features, and make parisons where relevant. Cambridge IELTS 6 TEST 2: The table below gives information about changes in modes of travel in England between 1985 and 2020. Summarise the information by selecting and reporting the main features, and make parisons where relevant. Cambridge IELTS 6 TEST 3: The diagrams below show the life cycle of the silkworm and the stages in the production of silk cloth. Summarise the information by selecting and reporting the main features, and make parisons where relevant. Cambridge IELTS 6 TEST 4: The charts below give information about USA marriage and divorce rates between 1970 and 2020, and the marital status of adult America in two of the years. Summarise the information by selecting and reporting the main features,and make parisons where relevant.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。