晶片的来料检验(编辑修改稿)内容摘要:
t on top of glassivated portion of the die are acceptable). 液 體 水 滴 化 學 污 點 光 致 抗 蝕 劑 GaAs (requirement only) There shall be no cracking or chipping within active circuit area. There shall be no chipouts that extend beyond 50 percent of the substrate thickness or cracks in side walls greater than mils. Silicon: Shall have a visible line of separation between bond pads and/or operating metallization Bridging and shorting 連 結 短 路 墊 ACTIVE CIRCUIT – All areas from outside edge of the bond pads inward, except where there is an active line in the design located beyond the outside edge of the bond pads. DIFFUSION Electrical isolation of one or more active circuits. GLASSIVATION – Top layer of transparent insulating material that covers active area except for bond pads. PASSIVATION LAYER Insulating material on die prior to deposition of metal or between metal layers. Note: Some die by design may not have a glassivation la。晶片的来料检验(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。