ts16949来料检验程序(中英文)内容摘要:
工作日内生产部啤出色牌, IQC 接色牌后 1 至 2 个工作日完成;对于无需测色原料, IQC 接 RMT 后, 2 个工作日内完成。 For plastic ining material , Normally, Production mold color chip within 3 working days and IQC plete inspection within 1 to 2 working days after received the color chip。 For plastic ining material which not need check color, IQC plete inspection within 2 working days。 其它来料:接 RMT 后, 2 个工作日 .Others ining material is pleted inspection within 2 working days. 塑胶原料检验记录于 QFQC027 《塑胶原料检验报告书》中,油墨检验记录于QFQC039《油墨检验报告书》中。 其余 来料检验 记录于 QFQC036《来料检查报告书》中。 Recording inspection data of plastic raw material in Plastic raw material inspection reportQFQC027, printing ink inPrinting ink inspection reportQFQC039, and others ining material in ining material inspection reportQFQC036. 德信诚培训网 更多免费资料下载请进: 好好学习社区 IQC 根据检验报告,每月做成 QFQC036《来料检验月报表》 , Email QA 经理、 物料经 理、采购经理和各 PM。 IQC based on inspection report to prepare monthly report of ining inspectionQFQC036 which to QA manager, Material manager, Purchasing manager and respective program management team. 对于客户提供物料,如果 IQC 检验半年以上未发生过品质问题,经项目经理、品质部经理、生产部经理批准后,可向 IQC 申请该物料进行免检。 IQC 将该物料纳入《免检物料清单》中。 但 IQC 可对免检部品随机检查,如发现品质异常,可随时取消该物料免检资格。 For the materials provided by customers, if no ining failures are found by IQC for more than consecutive 6 months, with Program Manager and Quality Manager and Production Manager approval, ining inspection will not be needed. And IQC will update Bypass Material List. But IQC inspectors have the authorization to do inspection for these materials, if any nonconformance is found in inspection free period。 Ining free of inspection will be canceled. 免检 amp。 紧急放行 Concessionamp。 Urgently releasing 对于生产急需而来不及检验或工程打样无样板的来料,相关部门需填写《来料免检 amp。 紧急放行申请表》 QFQC043 一 式 4 份交 IQC 确认,并标明放行根源。 Ining material of urgent need amp。 engineer building MEamp。 QE and having no enough time for ining inspection, related dept. need fill in Ining Material Concessionamp。 urgently releasing applicationQFQC043(total 4 sheets) submitted to IQC for confirmation and identifying root cause 货仓需在申请书上确认实收来料数量, 对应批次号以及 RMT 号。 Warehouse confirm on the application report about receipted Ining material quantity, relevant batch no. and RMT no.。 德信诚培训网 更多免费资料下载请进: 好好学习社区 IQC 根据实际情况以及放行来料是否符合以下条件决定是否放行。 Based on actual state and whether the requested material meets the following condition. IQC shall determine to release it or not. 第一次来料或工程打样使用 First ining material amp。 Engineer Building 生产紧急,接单后没有 2 个工作日供 IQC 检查。 Urgent need by production and less than 2 working days for IQC inspection after received RMT 此来料品质稳定,先前未发生严重品质问题。 This kind of ining material quality is steady and no serious quality problem before 如以上条件不符合,生产仍需紧急放行, IQC 则必须提供情况说明并得品质部高级主管级或以上人员确认。 If not meeting above condition and production still need urgently releasing, problem description and approved by Quality senior supervisor or upwards are necessary. IQC 将及时对免检 amp。 紧急来料进行跟进生产中质量情况。 如发。ts16949来料检验程序(中英文)
相关推荐
保存期五年 《管理评审计划》 保存期五年 XXXX 有限公司 人力资源管理与培训程序 文件编号: SJ/QP005 文件版本: B 生效日期: 发文编号: 编制 XX 审核 XX 批准 XX 人力资源管理与培训流程图 责任单位 流程描述 备注 Y Y N N N Y 制订人力资源发展规划 审核 确定岗位规范和任职条件 制订本部门岗位规范 提出人员需求申请 招聘 提交培训 需求申请 绩效考核
.工作环境 组织必须确定和管理为达到产品符合要求所需的工作环境。 确保人员安全及达到产品质量 组织必须考虑产品安全和员工潜在风险最小化的方法,别是在设计和开发过程和制造过程的活动中。 生产现场的清洁 组织必须保持生产现场处于有序、清洁的状态,并按产品和制 造过程需求进行维护。 7 产品实现 ISO 9001:2020质量管理体系 要求 7 产品实现 组织必须策划和开发产品实现所需的过程。
槽 Lathe Rough 粗车 Lathe Thread 车螺纹 Layer/Layout 视图 /布局 Lead And Lag 前导角和后导角 Level First 水平优先 Levels At Island Tops 切削各岛屿的顶面 Libraries 库 Linear Only 只输出直线插补 List 显示列表 Loop 循环 M Machine Control 机床控制
编号、格式按《质量体系文件编写导则》执行。 文件编写完后,对于第一层和第二层文件则需填写《文件审批表》。 文件会签由文件内容所涉及的各部门进行会签。 对于第一层和第二层文件同意则在《文件审批表》会签 栏签字,不同意则将意见、建议以书面形式反馈到编制部门。 审核及批准 质量手册由管理者代表审核,总经理批准。 质量管理体系程序文件由文件编制部门部长审核,文件内容所涉及的部门部长或授权委托人进行会签
试验活动,以及产品接收准则; d)实现过程及输出产品满足要求提供证据所需的记录(见 ..4)。 策划的输出形式必须适合于组织的运行方式。 质量培训网 金舟军译中文版 11 ISO/TS16949:2020 金舟军译中文版 注 1 : 对应用于特定产品、项目或合同的质量管理体系的过程(包括产品实现过程)和资源作出规定 的文件可称之为质量计划。 注 2 : 组织也可将 的要求应用于产品实现过程的开发