driveconvf61系列变频器英文说明书内容摘要:
urrent. OL operation starts at 100%. (OL set=100%) Estimated torque is displayed in percentage Remarked 06 Motor speed Motor (synchronous) revolution rpm 07 OL counter OL counter % 08 Line speed Line speed ... 6 Display on LCD 09 10 11 12 13 14 11term check 12term check 0term check Items Input terminal check 1 Input terminal check 2 Output terminal Units bit bit bit Remarked 1 is displayed when terminal block is turned on. For meaning of each bit, se table below. Ditto Ditto 15 ROM Version ROM Version XXXX of ROM software version VF61XXXX is displayed through conversion of alphabetic characters into numeric characters like A=0, B=1 and so forth. 16 17 Special moni Trouble moni For manufacturer’s adjustment Reading error records. Contents of latest five errors and current, voltage, etc. of these errors are displayed. Function mode Press the FUNC key, and current data is displayed as shown below. The internal data of the setting functions may be checked and changed. (See below.) Code number of setting function and contents are displayed. To change a displayed code number of the setting function, press a numeric key (09), function entry key, and up or down arrow key. SP set1, SP set2 and option of sixteen basic data codes 0 to 15 and expanded items of code 16 may be selected with the SET, up and down arrow keys. Set data is displayed. Changing set data (1)Before changing data The numeric keys may be used. To change the set data, press the SET key. * FUNCTION SET * (00)Ref(Set).F [Hz] *.0 [Hz] The lowest line is displayed when the SET key is pressed. Display when numeric entry is selected. Press the SET key, the numeric entry key is automatically established. Change data with the numeric entry key. Flicker 7 * FUNCTION SET * (00)Ref(Set).F [Hz] (2) After changing data Change data, then press the SET key. * FUNCTION SET * (00)Ref (Set).F [Hz} The lowest display disappears, and new data appears. Set data code list (Items selectable in function mode) Code Numbe 00 01 02 03 04 Display on LCD Descriptions Set ranges (Selection items) Fmax (Note 1) 280500 140250 80110 Linear SqrLaw Bend start Free start Decel stop Free stop Option Standard factory set data Setting resolution Units Rewriting in operation O O O O O Fmax means the maximum of Ref(Set).F, and other set values whose upper limit is Remarks Ref(Set).F Set frequency Forward jogging frequency Reverse jogging frequency Preset frequency 1 Preset frequency 2 Hz Hz Hz Hz Hz 05 Max. frequency Power control (base) frequency Rated output voltage Acceleration time (1) Deceleration time (2) Torque boost volume Setting overload ratio V/F pattern selection Start mode selection Stop mode selection Expanded set item selection Hz X 06 07 08 09 10 11 12 Rated Min F 400 200 100 1 1 1 Hz V V sec sec % Hz % X O O X X O O O Linear: V/F linear SqrLaw: V/F square reduction Bend: V/F folded line start: Starting at minimum frequency Free start: Free starting Decel stop: Stopping after deceleration Free stop: Free stopping For selecting items 17 and after. See the application manual. Depends on the 400V and 200V classes 13 V/F Pattern Linear X 14 start Decel stop X 15 X 16 O Note 1: When changing the set data of code number 05 (maximum frequency), also change the overfrequency in the following procedures: Select code number 16 Expanded set item selection to select. . Display code number 21 . Change data to a value higher than the setting of code 05 with the SET and numeric key entry. Data recording (1)When data of each function has been set, it should be protected as shown in below. (2)We remend that function data be stored separately, before maintenance work, in order to prevent the data from being lost due to unexpected accidents. 8 Operation Mode Display changes if the operation key is pressed. * OPERATION * REM/STOP/FOR/JOG () FOUT [Hz] REM: Remote operation is selected. DIR: Operation from the console is selected. FOR/REV:Forward/reverse selection. JOG: Jogging START/STOP: Starting or stopping operation. Monitor code number, content and data. to protect Data On pletion of adjustment, protect data in order to prevent it from being written or lost by maloperation, etc.. (1)Remove the cover from the unit. Open the console to the right. VFC61 SW1 ON 4 3 2 1 Set switch 4 of SW1 on the control PCB (VFC61) to ON. Any data cannot be written in the function mode. (2) Undo the console. Close the cover. Safety precaution Be sure to protect data while the VFC61 is stopped. 3. Automatic Measuring The exact constants (resistances) of the motor used with inverter should be set in order to run the inverter properly. Carry out automatic measuring for the motor only by disconnecting the motor from the load. Safety precaution As the voltage is impressed to the motor by automatic measuring, connect the GND terminal of the motor to ground. 9 (1) (2) (3) Inputting Motor Data Press the FUNC key. Select code number 16. Press the SET key, select SP, set2 with the up or down arrow keys, and press the SET key again. Change the code number displayed on the console one by one with the up or down arrow key. Set the data shown on the right according to the rating indicated on the name plate of the。driveconvf61系列变频器英文说明书
相关推荐
D 天馈分析仪。 1耦合器与功分器作为功率分配器件,一般根据工程中的应用分类两类,一类是 腔体分配器件,一类是 微带 分配器件,二者的主要区别是 插损 与 功率容量。 1在 800MCDMA 通信系中 ,用 EC/IO来表示信噪比。 1电梯覆盖一般有 电梯井道专项天线覆盖方式 、 电梯厅吸顶天线兼顾覆盖方式 、 电梯井泄漏电缆专项覆盖方式 、 随行电缆方式 、 随行直放站机方式 等。
g 的职工在线培训与考试系统概要设计 2736 系统设计原则 27 运行环境需求 2728 技术需求 28 总体结构图设计 28 系统层次结构图 2830 系统业务模块设计 3031 全局数据结构设计 3133 数据库表名清单 3132 数据库表之间关系说明 3233 外部接口 33 用户界面 33 软件接口 33 内部接口 33 运行设计 3335 运行模块组合 34 运行控制 34
持 24x7 全天进程技 术支持 次日配件派递(全球范围内 ) 一级城市 4 小时内配件送达(全球范围内) 现场 备用件 本地服务支持 在 Isilon, 我们深知快速有效提供现场支持癿重要 性。 在我们癿白金和黄金宠服计划 中, Isilon 癿区域服务代表在您需要癿时候,随时准备为您服务,包括提供进程系统诊断和送递配件到现场。 其他现场服务,可通过请求以下一个咨询服务: 兇迚癿存储整合
wever, things soon change to be very unnormal. It is surprising to find that Dracula is the evil creature, vampire. Harker’s fianc233。 e, Mina, and her friend, Lucy soon bee his prey. Later, Lucy and
(公 章) 投标单位授权代表姓名(签字): 日 期: 通讯地址: 邮政编码: 电 话: 传 真: 投标单位开户行 : 账 号 : 17 二、 投标保证金的银行保函格式 (本次招标不采用) 致: 本保函是 (投标单位名称 )(以下简称投标人)为参加太仓市 公安局 的"太仓市应急指挥中心决策会议系统暨 工业级液晶拼接 大屏显示系统设备及安装集成工程"而递交的投标保证金。 (保函开出银行名称)无条件地
0 A A 附 录 A (资料性附录) 预评价和控制效果评价的基本工作程序 预评价和控制效果评价的基本工作程序见图。 接受医疗卫生机构委托 签订委 托评价协议书 准 备 阶 段 1 拟定评价所需资料概要,交与医疗卫生机构准备 2 收集有关资料(法律法规、技术标准及其他技术资料) 3 初步调查分析,确定放射诊疗项目类型和危害类别 拟订评价方案或提纲 依据评价技术要求开展评价工作 实 质 控 施 审