20xx-20xx年专四真题作文范文内容摘要:

is a good habit, while the rest believe using tomorrow’s money today is better. For me, I agree with the latter point of view. Most people may have heard of the story about a Chinese old lady and an American old lady. The former spent all her life painstakingly saving enough money to buy a new apartment, without living in it for a long time before her death, while the latter first borrowed money form the bank to buy a new apartment in her youth and lived in it fortably, then spent the rest of her life paying the loan. In the story, the results are the samethey both bought an apartment, but their life experiences are radically different。 the former hardly lived in the house for she had spent all her life saving money for it, while the latter enjoyed living there for quite a long time because she “ used to。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。