英文文献文献翻译计算机内容摘要:

puter virus carriers sometimes can be deleted documents Or lowlevel formatted drives, and other measures to eliminate the virus pletely, and the work once a puter work Clean stations failed to disinfect the entire work can be reinfected by the virus, or even just pleted removal The work of a workstation is likely to be online by another workstation virus infection. Therefore, Only workstations in addition to killing viruses, and can not solve the virus harm to the work is. 6, the type of work virus As the work increasingly developed, the type of work virus has been increasing, generally summed up as The following categories: 1. Worm It is the use of the transmission mechanism of replication and dissemination work, the mode of transmission is through the work And , the prefix is Worm. For example, in recent years the great harm Nimda virus is Demodex A worm virus. The virus used Microsoft39。 s Windows operating system, puter flu With this virus, will continue to automatically dialup Inter access and use information in the document or the address Sharing work spreads, and ultimately undermine the most important user data. 2. Macro Virus Hong virus is a Storage in the document or template in the Acer puter virus. The prefix Macro, once open such documents, which Acer will be implemented, then the virus would Acer Been enabled transferred to the puter, and in the presence of the Normal template. From then on, all since The document will be kept moving infection that the Hong virus, and if other users opened the flu Documents with the virus, the Hong virus will be transferred to his puter. 3. Destructive procedures virus The prefix destructive virus program is: Harm. The characteristics of this virus is a good in itself Look at the user clicks on icons to temptation, when the user clicks on the virus, the virus will direct users Computer generated destruction. If C formatted disk (), the killer orders (Harm. ). 4. System virus The prefix system for the virus: Win32, PE, Win95, W32, W95, and so on. These viruses The characteristics of the general public can be infected with the windows operating system *. exe and *. dll file, And through these documents for dissemination. If the CIH virus. 5. Backdoor virus Backdoor virus prefix is Backdoor. The total of such virus through work Sowing, opened the back door to the system to the user and potential safety problems. 6. Bundling machine virus Bundledvirus prefix is: Binder. The characteristics of this virus is the virus writers will use Specific procedures will be bundled with a number of applications such as , IE bundled up on the surface It is normal to see the paper, when users run these bundled virus, will run。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。