综合写作tpo25阅读与听力文本内容摘要:
inally, what could ancient people have done with the electricity that the vessels were supposed to have generated? They had no devices that replied on electricity. As batteries, the vessels would have been pletely useless to them. Lecture Your reading says that these vessels were not used as batteries in ancient times, but the arguments used in the reading are not convincing. The battery explanation could very well be correct. First, about the absence of wires or other conductors. Remember, vessels were discovered by local people, not archaeologists. These people might have found other material located near the jars. But since they were not trained archaeologists, they may。综合写作tpo25阅读与听力文本
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。