精馏塔设计外文翻译内容摘要:

is difficult to volatilize liquid transfer by steam, steam, liquid phase mass transfer between processes. This design is stupid chlorobenzene continuous separation of distillation tower, and is a important basic raw material of anic synthesis, used as a dye, medicine, pesticide, anic synthesis in the manufacture of 河北联合大学 6 phenol, nitrochlorobenzene, two nitrochlorobenzene, aniline, nitrophenol and insecticide DDT, also used as ethyl cellulose and many resin of downstream products, nitrochlorobenzene is the main consumer of chlorobenzene, nitrochlorobenzene is of vital dyes, pesticides, pharmaceutical order to nitro chloridize benzene as raw materials to production of pnitrophenol, pnitroaniline, amino phenol, benzene two amine, paminophenol methyl ether and amino benzene ether and a series of anic chemical as a result of Using Benzene Chlorination of chlorobenzene, benzene and chlorobenzene miscible, so we need to design a distillation column used for the separation of volatile benzene and not easy to volatilize and chlorobenzene. First of all, benzene and chlorobenzene raw material in the raw material preheater of heating to boiling point, then, from raw materials into the feed inlet into the distillation of being heated to boiling point, a mixture of both gas phase mixture, and the mixture in liquid phase, when the raw material mixture was separated from the gas mixture, in the distillation tower rises, and the liquid mixture in distillation tower in phase mixture to rise to the top of the tower at the top of the condenser, the vapor mixture is cooled down to the bubble point, wherein the liquid portion into the top product cooler, stop for a certain time and then into benzene storage tank, and wherein the gaseous ponent back into the distillation tower, this process is called phase mixture from the bottom of the tower into a portion to the bottom of the tower product cooler, one part enter。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。