牵引系统中英文翻译内容摘要:

ation acceleration rate. Test results show that the mass of the Typethree sleeper is larger, so its track structure possesses much higher stiffness than the New Typetwo sleeper track structure. In the wheelset falling test, the typethree sleeper track structure offers smaller vibration acceleration rates of rails and sleepers and much lower vibration frequencies, as pared with the New Typetwo sleeper track structure. However, the wheelrail impact forces of the track structures with two types of sleepers are basically the same, Field tests show that the Typethree sleeper track structure is more stable. According to the test results, to enhance the track stability and prolong the track maintenance cycle, it is better to adopt Typethree sleepers and 60kg/m rails on the lines where trains where trains run at the speeds 160 km/h. The optimized schedule of the traction system can be integrated to the existing traction control system. BASIC MODEL OF SYSTEM AND RECTIFIERS For a mass transit system, in order to increase the energy efficiency of the power supply system, regenerative braking is employed together with the rheostat braking. During regenerative braking, the power is either absorbed by nearby trains or returned to the power system through converters in the nearby substations. For a given train running from the current station to the distinction station, ignoring those temporary stops, we assume the speed profile of trains can be represented by several key parameters including the starting time, motoring time, coasting time, braking time and running time [XS, XA, XC, XD, r] as illustrated in , where suffix S denotes starting, A denotes motoring, C denotes coasting and D denotes braking. For long distance run, such as intercity railway system, the motoring and coasting operation modes may repeat more than one time to cover long distance. There is an ever increasing demand for the onboard Inter access from the passenger train. As deploying the broadband wireless along the railway is one of the resolutions for the proposes of Inter services on the passenger train, it is the hot research spot at present. Aiming at this direction, this paper proposes a work topology for the railway broadband wireless link, mesh nodes invalid risk degree and influence factor, and a lyaly minimum spanning tree algorithm. And then, the performance of robust of the banyantree topology is analyzed. Based on the banyantree topology, this paper presents a design of mulitportal bus structure and amultiradio Mesh node structure for the railway wireless mesh work, using the microcell deployment method and the mixed channel multiplexing method. And then the performance of latency and throughput of the work system are analyzed. Finally, an illustrative implementation scheme is designed for a railway section with a length of 300km. Based on the theoretical analysis and illustrative implementation proposal, the paper that the banyantree topology is the suitable for the implemention of railway broadband wireless overlay with low latency, hig。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。