混凝土相关外文翻译内容摘要:
( 3) where ()c and ()t are the weighting functions of pressive and tensile internal variables, respectively. The principles for determining ()c and ()t are as follows: for the loading process with dominant tensile stress states, ()t=1 and ()c=0。 similarly, for the loading process with dominant pressive stress states, ()t=0 and ()c=1。 for other loading conditions, 0 ()t1, 0 ()c1 , and ()t+ ()c =1. Finally, the yield criterion can be expressed as ( , , ) ( , , , , ) 0c t c tf k k f k k k k; (4) According to the theory of the consistent ratedependent model, a consistency condition should be satisfied: f : 0ctct ctctf f f fd d d d dkk kk (5) Two thermodynamicsbased plastic constitutive models of concrete that have simple forms and can satisfy the energy laws naturally have been developed by Leng et al. (2020). Results from both models, obtained under static loading, agree with experimental results. The two models have been established, respectively, in HaighWestergaard stress space and principle stress space, the difference being that the Lode angle is neglected in the HaighWestergaard stress space model and considered in the principle stress space model. The two yield criteria can be expressed as 温州大学本科毕业设计 建筑与土木工程学院 3 22221 2 1 2() 1[ ( ) ] [ ( ) ]t c t cpqa p a p p b p b p p (6) and 222 3122 2 21 2 3()( ) ( ) 1A A A (7) where p is the volumetric stress。 q is the shear stress。 and are the shift stresses on the hydrostatic axis and principle stress axis, respectively。 1A , 2A , and 3A are the stress dimensions, where 1 2 1 2 3( ) ( )i i i i t cA a a a p p i=(1,2,3,)。 cp and tp are the intersection points of the yield surface and hydrostatic axis。 and 1a , 2a , 3a , 1b and 2b are dimensionless parameters to be determined The plastic flow rules of the two models are, respectively, 220 .5 ( )1tcpvpsp p pd AqdB (8) and 2 2 2 2 2 21 2 3 2 3 1 1 3 2 1 2 1: : [ ( ) ] : [ ( ) ] : [ ( ) ]pppd d d A A A A A A (9) where 220 . 5 ( )[ ] ( )2 tcp p p qB ; 2()ctpp , the relative level of shift stress。 pvd and psd are the volumetric plastic strain increment and deviatoric plastic strain increment, respectively。 12()tcA a p a p p 。 12()tcB b p b p p 。 and 1pd , 2pd and 3pd are three principle plastic strain increments. According to the results of experiments (Suaris and Shah 1985。 Reinhardt 1984), the relationships between the pressive and tensile strengths of concrete and the internal variable and rate of the internal variable are ( ) ( )c d c c c c cf f H S ( 10) and ( ) ( )td t t t t tf f H S ( 11) where cdf and tdf are dynamic strengths of concrete under uniaxial pression and tension, respectively, and ()ccH ,。混凝土相关外文翻译
相关推荐
同步、耦合同步、反馈同步、脉冲同步等。 混沌同步在超宽带无线通信中的应用 近年来 , 超宽带 (UWB) 通信技术得到了广泛的重视与研究 , 有着良好的应用前景。 2020年 2月 14日 , 美国联邦通信委员会 ( FCC) 正式通过了将 UWB技术应用于民用的议案 , ~ UWB开放。 UWB通信技术是一种利用极窄脉冲的超宽带传输技术 , 这是它与以往通信技术最大的区别之一。 由于传输的脉
这里就要表明为什么我们下了一个这样的定义。 首先,我们没有使用传统意义上的旁白概念;其次,这也并不是剧本语 言中所指的解说白。 明确起来,其实我们所说的旁白指的是剧本语言中第三人称解说白。 既然大家都不是专业编剧,那么我们索性也就不使用严格的术语,只以网配圈通常大家所理解的概念来讲旁白这个问题。 于是,我们要问第二个问题 ——旁白有什么用。 旁白的作用,很简单,角色的台词说不清楚
5月 28 日 至 6月 5 日 6 月 5日 至 6 月 13 日 6月 13日 至 6月 21日 调色 5 月 1日 至 5 月 9日 5月 10日 至 5月 18日 5月 19日 至 5月 28日 5月 29 日 至 6月 5 日 6月 6 日 至 6月 13 日 6 月 14 日 至 6 月 22 日 6月 23日 至 6月 27日 涂刷 5月 10日 至 5月 18日 5月 19日 至
中选原因的义务;投标单位的文件均不退还。 三、投标文件 投标文件应包括:投标书、供货范围明细、投标货物符合本文件规定的证明文件及投标单位认为需要加以说明的其它内容。 投标资格证明文件包括:营业执照、生产许可证和产品准用证、产品质量检验报告等资料的复印件。 投标单位应对本文件的全部招标内容进行投标,按文件提供的格式编写投标书,包括供货范围明细表、性能参数描述、投标综合说明等。
限 质量要求技术标准详见《技术条款》,供方必须保证其提供的货物在各方面符合技术规定的质量、规格和性能。 在规定的质量保证期内,供方必须对由于设计、工艺或材料的缺陷而造成的任何缺陷负全部责任。 出现上述情况,供方必须在收到需方通知后 96小时内,免费更换。 供方还必须对需方因合同材 料质量缺陷所造成的一切直接损失与间接损失承担全部经济赔偿责任。 供方所提供货物的质量保证期为一年。 第五条
侧面非承重模板时,混凝土应具有 1. 2N/ mm2 以上强度;拆模时注意保护棱角,避免用力过猛过急;吊运模板,防止撞击棱角,运输时,将成品阳角 用草袋等保护好,以免碰损。 (2)缺棱掉角,可将该处松散颗粒凿除,冲洗充分湿润后,视破损程度用 1: 2 或 1: 水泥砂浆抹补齐整,或支模用比原来高一级混凝土捣实补好,认真养护。 七、表面不平整 1 现象 混凝土表面凹凸不平,或板厚薄不一,表面不平。