液压与气动系统外文翻译内容摘要:
ble features of fluid power, it is not a panacea for all power transmission problems .Hydraulic, systems also have some drawbacks. Hydraulic oils are messy, and leakage is impossible to pletely eliminate. Also, most hydraulic oils can cause tires if an oil leak occurs in an area of hot equipment. Now, below a concrete example hydraulic stations to introduce the advantages of the hydraulic system. Hydraulic Station and the development of hydraulic ponenis Profiles Hydraulic Pump Station also known as the stations are independent hydraulic device. It requested by the oil gradually. And controlling the hydraulic oil flow direction, pressure and flow rate, applied to the mainframe and hy draulic devices separability of hydraulic machinery. Users will be provided after the purchase hydraulic station and host of implementing agencies (motor oil or fuel tanks) connected with tubing, Hydraulic machinery can be realized from these movements and the work cycle. Hydraulic pump station is installed, Manifold or valve bination, tanks, a bination of electrical boxes. Functional ponents Pump device is equipped with motors and pumps. hydraulic station is the source of power. to mechanical energy into hydraulic oil pressure can be. Manifold from hydraulic valve body and channel assembled. Right direction for implementation of hydraulic oil, pressure and flow control. Valve portfolio plate valve is installed in up board after board connects with the same functional IC. Tank plate welding semiclosed containers, also loaded with oil filtering work, air filters, used oil, oil filters and cooling. Electrical boxes at the two patterns. A set of external fuse terminal plate: distribution of a full range of electrical control. Hydraulic Station principle : motor driven pump rotation, which pump oil absorption from the oil tank. to mechanical energy into hydraulic pressure to the station, hydraulic oil through Manifold (or valve binations) realized the direction, pressure, After adjusting flow pipe and external to the cylinder hydraulic machinery or motor oil, so as to control the direction of the motive fluid transformation force the size and speed the pace of promoting the various acting hydraulic machinery. A development course China Hydraulic (including hydraulic, the same below), pneumatic and seals industrial development process can be broadly divided into three phases, namely : 20 early 1950s to the early 1960s, the initial stage: 60`s and 70 for specialized production system :8090`s growth stage for the rapid development stage. Which, hydraulic industry in the early 1950s from the machine tool industry production of fake Sugrinder. broaching machine, copying lathe, and other hydraulic drive started. Hydraulic Components from the plant hydraulic machine shop. selfoccupied. After entering the l960s, the application of hydraulic technology from the machine gradually extended to the agricultural machinery and mechanical engineering fields, attached to the original velocity of hydraulic shop some stand out as pieces of hydraulic professional production. To the late 1960s, early 1970s, with the development of mechanized production, especially in the second automobile factory in providing efficient. automated equiment. along with the Hydraulic Components manufacturing has experienced rapid development of the situation, a group of SMEs have bee professional hydraulic parts factory. 1968 China161。 175。 s annual output of hydraulic ponents have nearly in 1973, machine tools, agricultural machinery, mechanical engineering industries, the production of hydraulic parts factory has been the professional development of more than 100 and an annual output more than one million, an independent hydraulic manufacturing industry has begun to take shape. Then , hydraulic pieces of fake products from the Soviet Union for the introduction of the product development and technical design bining the products to the pressure, Hypertension and the development of the electrohydraulic servo valves and systems, hydraulic application areas further expanded . Aerodynamic than the start of the industrial hydraulic years later, in 1967 began to establish professional pneumatic ponents factory, Pneumatic Components only as modity production and sales. Sealed with rubber and plastics, mechanical seals and sealing flexible graphite sealing industry, the early 1950s from the production ordinary 0rings, rubber and plastics extrusion, such as oil seal sealing and seal asbestos products start to the early 1960s, begun production of mechanical seals and flexible graphite sealing products. 1970s, the burning of the former Ministry, a Ministry, the Ministry of Agricultural Mechanization System, a group of professional production plants have been established, and the official establishment of industries to seal industrial development has laid the foundation for growth. Since the l980s, in the country`s reform and opening up policy guidelines, with the development of the machinery industry, based mainframe pieces behind the conflicts have bee increasingly prominent and attracted the attention of the relevant departments. To this end, the Ministry of the original one the 1982, formed the basis of mon pieces of Industry, will be scattered in the original machine tools, agricultural machinery, mechanical engineering industries centralized hydraulic, pneumatic and seals specialized factories, placing them under mon management infrastructure pieces Bureau, so that the industry in the planning, investment, technology and scientific research and development in areas such as infrastructure pieces Bureau of guidance and support. Since then entered a phase of rapid development, has introduced。液压与气动系统外文翻译
相关推荐
投标文件后,可以修改或撤回其投标,但投标人必须在规定的投标截止期之前,将修改或撤回的书面通知递交到招标机构。 煞忸您 投标人的修改或撤回通知应按投标人须知第 18 条规定编制、密封、标记和发送。 煞忸您 在投标截止期之后,投标人不得对 其投标做任何修改。 煞忸您 从投标截止期至投标人在投标书格式中确定的投标有效期之间的这 .段时间内,投标人不得撤回其投标,否则其投标保证金将按投标须知第
月 日 注: 最终支付数额以企业按省发布费率报价及造价管理机构审定的安全防护措施费通知书数额为准,并与本单一并作为施工合同的附件使用。 本单一式四份,行政服务中心、造价管理机构、建设单位和施工企业各执一份。 6 附件 2 淄博市建筑工程安全防 护 文明施工措施费用 预 存 通 知 书 工程名称 : 年 月 日 建设单位 施工单位 费用项目 单位 数量 标准 金额 安全文明施工费 合计人民币大写
店开业前后三天,作为店铺营运入轨期,甲方应向加盟店派遣人员进行开业和经营指导。 乙方必须参加甲方组织的年度销售会议及临时经营者会议。 甲方应提前四周通知开会日期。 除经营者会议外,甲方将不定期向乙方派遣市场负责人进行指导和培训。 七、商标、服务标志及相关权利 本合同所涉及的所有商标、服务标志及其相关权利的所有权均归属于甲方。 甲方承诺在本合同执行期间,乙方加盟店可以使用甲方商标
务经费,职工因公负伤赴外地就医路费,职工生活困难补助,职工浴室、理发室、幼儿园托儿所人员的工资,以及按照国家的规定开支的其他职工福利支出,不包括职工福利设施的支出。 (同时颁发的其他行业财务制度有相似的规定) 新《企业财务通则》改变了这一格局。 财政部《关于实施修订后的〈企业财务通则〉有关问题的通知 》(财企 [2007]48号)规定:修订后的《企业财务通则》实施后,企业不再按照工资总额