汽车变速器外文翻译内容摘要:
enomenon Technical condition in the clutch normal circumstances, transmission at the same time put up or two files linked to the need to stall, the results linked to other stalls. 2. Reasons ① interlocking device failure: if the fork shaft, pin or interlocking interlocking ball too much wear and tear, etc.。 ② the bottom of the arc gear face wear and tear is too large or fork axis of the allocated blocks wear groove is too large。 ③ ball pin gear lever broken or the ballhole, ball 松旷 wear too. In short arbitrary file transmission is mainly due to institutional failure manipulation. 3. Fault diagnosis and troubleshooting ① linked to the need to stall, the results linked to the other stalls: rocking gear lever, to check their point of view before, if in excess of the normal range, while the lower end of failure by the gear lever ball pin and the positioning groove ball with or 松旷 , the ball is too large holes caused by wear and tear. Swung shift 360 176。 , pared with a broken pin. ② If the pendulum angle to normal, still not on, or linked to more than picking file, then the lower end of failure by the gear lever away from the limitations arising from the groove in (due to break away from the bottom of the arcshaped guide groove face wear and tear or wear). ③ At the same time linked to the two files: the fault caused by the interlocking device failure. (C), the difficulties linked to files 1. Phenomenon Clutch technical condition, but can not be linked smoothly linked file into the stalls, often percussive sound gear. 2. Reasons ① synchronizer failure。 ② Bending fork shaft, locking the spring strong, ball injury, etc.。 ③ a shaft or a spline shaft bending injury。 ④ inadequate or excessive gear oil, gear oil does not meet the specifications. 3. Fault diagnosis and troubleshooting ① Synchronizer check whether the fall to pieces, cone ring is conical spiral groove wear, whether worn slider, spring is too soft, such as elastic. ② If the Synchronizer normal, check whether the bending of a shaft, spline wear is severe. ③ check whether the mobile axis normal fork. (D), abnormal sound transmission 1. Phenomenon Transmission refers to transmission work abnormal sound when the sound is not normal. 2. Reasons 1) abnormal sound gear Gear wear off very thin gap is too large, the impact of running in。 bad tooth meshing, such as the repair did not replace the gear pairs. New and old gear with the gear mesh can not be correct。 tooth metal fatigue spalling or damage to individual teeth broken。 gear and the spline shaft with 松旷 , or the axial gear clearance is too large。 axis caused by bending or bearing 松旷 space to change gears. 2) Bearing ring Serious bearing wear。 Bearing (outer) ring with the journal blocks (holes) with the loose。 Ball Bearing Ma breakup or a point of ablation. 3) ring made for other reasons Such as the transmission within 缺油 , lubricants have been thin, too thick or quality deterioration。 transmission into the foreign body inside。 some loose bolts fastening。 odometer or the odometer shaft ring gear, such as fat. 3. Troubleshooting ① transmission issued metal dry friction sound, which is 缺油 and the poor quality of oil. Refueling and inspection should be the quality of oil, if necessary, replacement. ② for moving into a file if the sound obvious, namely, the profile of gear tooth wear。 If the occurrence of cyclical noise, while damage to individual teeth. ③ when the ring gap, and riding the clutch pedal under the noise disappeared after the general axis is a before and after the bearing or regular engagement ring gear。 if any files are changed into the ring, after more than twoaxis bearing ring. ④ transmission occurs when a sudden impact the work of sound, most of the tooth was broken and should be removed timely transmission inspection cover to prevent mechanical damage. ⑤ moving, only for transmission of a file into the ring gear made in the abovementioned good premise, it should check with improper gear mesh, if necessary, should be reassembling a pair of new gear. In addition, it may be synchronizer gear wear or damage should be repaired or replaced depending on the circumstances. ⑥ when shifting gear ring made of impact, it may be the clutch。汽车变速器外文翻译
相关推荐
简析: 任何物体皆有自身的磁场 ,磁场由质子、中子和电子整体运动生成 ,不同分子结构形成不同的物质 ,其磁场的稳定性决定了分子结构的稳定性。 磁场间具有相吸与相斥作用,当磁场间相互吸引时能量增加,相斥则能量减少。 在正常状态下碳氢化合物和空气均呈中性,分子相互排斥,导致燃料不能充分燃烧,未充分燃烧的部分变成废气排放。 如果燃料经过节油器后,磁矩使流体中的分子重新组合成高能量分子结构。
国汽车尾气污染的原因 „„„„„„„„„„„„„„„„„„„ 13 二、 NOX 与 A/F 的关系 ........................................................................ 15 影响 NOX 的因素 .............................................................
级管理追究责任制,并严格执行。 2. 6 由经理召集有关人员,定期和不定期对每一工位的安全、防火情况进行检查,对违反责任制人员,要及时进行纠正和处罚。 2. 7 公司内的用电线路及电器装置、由专门的电工负责,任何人不得随意布线和改动。 2. 8
站的冠军由马莎拉蒂 MC12 跑车夺得,以 3 小时 1 分 11 秒 193 的 成绩在珠海 公里长的赛道上跑了 113 圈。 全球超级跑车制造厂的必争之地,法拉利、克莱斯勒、马莎拉蒂、兰博基尼、阿斯汀马丁、保时捷等品牌的超级跑车是世锦赛上的座上宾。 车的型号中的英文字母 法拉利 一般是用 F打头 (Ferrari 的首字母 ),但也有部分车型没有 F 字母 而后面数字大多是和发动机排量有关
《十年光辉 十载 梦想》 810 分钟形象宣传片脚本 (解说词版本) 3 10 年励精图治,成果斐然。 10 年来, 因 为您的 热忱关怀 和厚爱,我们才得以茁壮成长; 10 年来, 因为您的 无私 奉献和奋斗,我们才得以创造奇迹。 回顾联创的发展历程, 过去的十年, 正是 不断锐意进取、不断挑战自我的过程 —— 自公司成立以来,经营业绩以年均 40%以上的速度增长,年销售收入从 3000
业,并经过一定时间整改治理方能排除的隐患,或者因外部因素影响致使生产经营单位自身难以排除的隐患。 第三条 交通运输主管部门统筹本地区交通运输隐患排查治理监管工作;公路管理、道路运输、港航管理、质量 22 监督和渡口管理等行业管理机构和负有行业安全生产监管职责的单位(以下简称行业管理机构)具体负责本行业监管范围内的隐患排查治理监管 工作;隐患主体责任单位负责排查治理具体工作。 第四条