机械类中英文翻译内容摘要:
this part of content when the introduction cam gear, should point out each kind of cam gear the good and bad points and its the adaption situation, showed each kind of cam gear the inner link, will build the foundation for the later translation cam and the column cam contour design. 3rd, the throwout lever movement rule (1) the cam gear cycle of motion and the basic term terminology push the regulation movement angle: With from pushes the cam corner which the regulation corresponds。 Far stops the angle: With from far rests the cam corner which the regulation corresponds。 Return trip movement angle: With cam corner which corresponds from the return trip。 Nearly stops the angle: With from nearly rests the cam corner which the regulation corresponds。 Cam: Take the cam axle center as the center of a circle, take its outline slightly to diameter r0 as the radius circle。 From ravelling schedule: In pushes in the regulation or the return trip from the biggest displacement, indicated with h。 : The cam center of rotation with from guides way the bias distance, indicated with e. Types of Cams Plate cams are simple to follower can be moved in various patterns with various rise /fall should be controlled to avoid abrupt changes in force transmitted from the cam to the should carefully determine horizontal force ponents,since these present problems designing the follower assembly reactions occur at points A and reaction values must be relative vertical position of point A with respect to B needs to be raised if the reaction value at Bis position of B should be as close to cam as possible to minimize flexure in the rollerfollower support. This type produces reciprocating motion in the ,dorces need to be determined and dimensions chosen so as to avoid excessive ponent tapered roller follower is frequently employed。 the groove in the periphery of the cam should be shaped to acmodate the type of cam is expensive to cylindrical cam has two outstanding is the fact that the cam is positive outside forces (such as gravity or spring action ) are needed to hold the follower against the working surface of the second feature is the fact that the follower can move through a plete cycle in the course of several revolutions of the example,it is possible to design the cam so the follower could move from a starting position at the left end to the extreme right position in three revolutions( or more),then the starting position in two variations are possible. A translation cam is the figure shown the cam reciprocates horizontally and the follower moves up and pivoted follower can be used with this type .The translation cam can be made positive by providing a guided plate with an inclined slot for the cam。 the slot cam then engage a pin or roller on a guided vertical reciprocated the latter type ,however,a plete force analysis is a critical phase of the design. In this type,the cam rotates and the follower (ususlly a r。机械类中英文翻译
相关推荐
秦皇岛烟草工业机械厂 河北振兴水泥厂 秦山化工 中国北车集团唐山机车车辆厂 石家庄南东辆段 北京铁路局北京工程建设指挥部 大秦铁路股份有限公司 大秦铁路股份有限公司湖东车辆段 大同铁路分局湖东车辆段 济南西车辆段 锦州铁路分局阜新车辆段 18 沈阳皇姑屯车辆段 沈阳灵山车辆段 沈阳灵山车辆段 霸州市恒源装饰材料有限公司 保定华菱制衣有限公司 中国电 子科技集团公司第十三研究所
减速齿轮、减速装置 reduction gear 减速器 speed reducer 减摩性 antifriction quality 渐开螺旋面 involute helicoid 渐开线 involute 渐开线齿廓 involute profile 渐开线齿轮 involute gear 渐开线发生线 generating line of involute 渐开线方程 involute
28. 前置型油梁式抽油机的设计 29. 固定型液体驱动射流泵采油装置设计 30. 液压反馈抽稠泵设计 31. 海洋钻井平台钻杆自动排放 及移动运系统设计 32. XJ350 修井机绞车的设计计算 33. 往复泵实验装置设计 34. 40 型液动顶驱装置设计 35. 顶驱装置试验台设计 36. 10 型抽油机动力与减速系统设计 37. 特厚壁套管及其抗挤强度分析 38. 钻井岩屑清洗机设计 39
一版更新有利得多。 回顾历史, CAD 和计算机图形学的国际标准制定总是滞后于市场上的工业标准。 CAD 产品更新频繁。 谁家产品的技术思想领先,性能最好,用户最多,主导了市场,谁就是事实上的工业标准。 CAD 技术的发展不是一种 纯学术行为,它是在高技术产品所固有的激烈市场竞争中不断向前推进,永无止境。 CAD 软件一般应集成在一个异构的工作平 台之上,为了支持异构跨平台的环境
ansferred between the CNC system software and application software. NC variable is used for sending control orders such as the selection of work type, cycle starting, feeding keeping and reset