机械方向毕设外文翻译内容摘要:
ansferred between the CNC system software and application software. NC variable is used for sending control orders such as the selection of work type, cycle starting, feeding keeping and reset operation etc from application software to NC kernel, or reading the machine tool coordinate and the NC kernel work states from the NC kernel. The NC data include the NC program, tool data and machine tool parameters etc. Using the PLC variable, the orders can be sent to the PLC kernel from application software straightway and the information of PLC kernel can be read. The PLC kernel offers plenty blending function for invoking. The NC software environment of the CH2020/S is shown in figure 4. Fig. 4. CH2020/S NC software environment Based on objectoriented technology, in the open CNC software, the control sys tem is divided into many functional modules to acplish different functions. The C/S module is used for transferring the information between modules and control sys tem kernel or different modules [4][6]. The module offering service function is the server module and the module asking for the function service is client module. For the scalability, maintainability and reconfiguration of CNC system software, the software is designed with modular method. Based on the control system function, different modules are designed for multitask ability of control system. The main control module should acplish many plex tasks, such as the initialization, the NC program input, edit piling, setting parameters and operation. So it is needed to design a series of unattached function program modules, and furthermore, the same program module has the different module contents under the different control methods. 大连交通大学 2020 届本科毕业生毕业设计(论文)外文翻译 j i The control program is designed based on the Windows operating system, so it has the multitask coordinated ability. In the program, user manipulative performance is posed of many windows and each of them executes one task. And the functions are realized petitively in the different windows. The states of each task are managed by the management program [5][6]. The main function of mainmenu performance is monitoring, performance management, function controlling and system managing. The control part is the vital part of the whole software, and it determines the qualification of the control system. The flow chat of the whole software is shown in . After initialization of the system, the reference point setting and etc., the SERCOS Master’s drivers can be used for operating its interface card. And SERCOSMaster interface card supplies the difference interpolation funct。机械方向毕设外文翻译
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
机械电子工程专业论文
一版更新有利得多。 回顾历史, CAD 和计算机图形学的国际标准制定总是滞后于市场上的工业标准。 CAD 产品更新频繁。 谁家产品的技术思想领先,性能最好,用户最多,主导了市场,谁就是事实上的工业标准。 CAD 技术的发展不是一种 纯学术行为,它是在高技术产品所固有的激烈市场竞争中不断向前推进,永无止境。 CAD 软件一般应集成在一个异构的工作平 台之上,为了支持异构跨平台的环境
机械手_外文文献及翻译
mics equations of the parallel manipulator are derived using Kane method, according to the theory, the active forces are equal to inertial forces, the dynamics statespace equation can be written by τ