机械专业中英文文献翻译-机械手内容摘要:
uipment Robot is modeled on the part of staffing actions, according to a given program, automatically track and requirements capture, handling or operation of the automatic mechanical devices. Applications in the industrial production of the robot is called industrial manipulator. Production of mechanical hand can improve the automation level of production and labor productivity, can reduce labor intensity and to ensure product quality, to achieve safe production. Especially in the hightemperature, high pressure, low temperature, low pressure, dust, explosive, toxic and radioactive gases and other harsh environments, it is instead of the normal working people, even more significant. Therefore, machining, stamping, casting, fing, welding, heat treatment, plating, painting, assembly and light industry and other aspects of the transport industry more and more widely used Start manipulator structure is relatively simple, specific strong, only the top and bottom of a machine tool feeding device, is attached to the machine dedicated manipulator. With the development of industrial technology, made the ability to achieve independent control according to the procedure repeated operations, and broad scope of the mon program control manipulator, referred to as the universal manipulator. As general manipulator can quickly change work procedures, strong adaptability, changing it in the production of varieties of small batch production to obtain a wide range of applications. manipulator Present Study and trends Manipulator is the earliest industrial robots, is the earliest of the modern robot, it can replace human labor in order to achieve production of the heavy mechanization and automation that can operate in hazardous environments to protect the personal safety, which is widely used in machinery manufacturing, Metallurgy, electronics, light industry and atomic energy and other sectors. Robot in the future development is mainly towards the following four aspects for innovation: accuracy Accuracy is the manipulator to reach the specified degree of precision points, which the resolution of the drive and feedback installations. Repeatability is repeated several times if the action, the location of the robot to reach the same level of precision. Repeat accuracy is more important than accuracy, if a robot localization is not precise enough, usually show a fixed error, this error is predictable, and therefore can be programmed to be corrected. Repeatability is a limited range of random errors, it runs through a certain number of times to repeat the robot to determine. As microelectronic technology and modern control technology, and the pneumatic servo technology out of the laboratory and plete sets of pneumatic servo positioning system technology. Pneumatic Manipulator repeatability will be increasingly high, it will bee more broad application areas, such as the nuclear industry and military industry. Some panies with familyoriented drives Pneumatic Manipulator as simple transmission technology, and the modular assembly of the pneumatic manipulator known as the modern transmission technology. Modular assembly of the pneumatic manipulator driven drive more than the bination of flexible mounting system. It integrates with cables and electrical interface and the guidance system of tracheal device so that the robot motion with ease. Modular pneumatic manipulator because the drive ponents using specially designed ball bearings, it has a high rigidity, high strength and precision guidance accuracy. Excellent positioning accuracy of a new generation of pneumatic manipulator is a。机械专业中英文文献翻译-机械手
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
机械工厂常用英文单词
s sheet and physical inventory list will be sent to accounting department together (Those of NHK will be sent to financial department) 本表请与盘点清册一起送会计部-(NHK厂区送财会部 ) Application status records of
机械与汽车工程学院20xx年度工作总结2_电气与自动化工程
病的老同志学院领导登门慰问 . ,2020 年学院工会组织开展了学院师生乒乓球联谊赛 ,教工乒乓球团体赛 ,组织学院教工赴黄山 ,庐山旅游 ,组织学院女教工赴太湖文博园参观等系列活动 .材料学院 2020年度工作总结 2020 年按照校党委的工作部署 ,坚持以邓小平理论 ,”三个代表 ”重要思想和党的十大精神为指导 ,以科学发展观统领全院工作 ,进一步工作思路 ,增强创新意识
机房ups短信息监控系统技术解决设计方案
状态)的异常报警就成为管理人员一件比较头痛的事情了。 而随着移动 通信技术的不断发展,手机已经成为现代生活中重要的组成部分,而手机短信则以其方便、快捷、随时随地的移动性等优点成为广泛应用的日常通讯手段。 机房 UPS 短信息监控管理解决方案就是利用手机短信这种便利的手段来对 UPS 系统工作运行状态实施短信监控,让机房管理人员可以不依赖计算机直接通过手机短信的方式来随时查询 UPS