最新机械手外文翻译内容摘要:
n The actuator to be achieved by the transmission system. Subtransmission system monly 执行机构的动作要由传动系统来实现。 常用 used manipulator mechanical transmission, hydraulic transmission, pneumatic and electric power 机械手传动系统分为机械传动、液压传 动、 transmission and other drive several forms. 气压传动和电力传动等几种形式。 3. Control System Manipulator control system’s main role is to control the machine hand according to certain 机械手控制系统的主要作用是控制机械手按一定的 procedures, direction, position, speed of action, a simple mechanical hand is generally not set up a 程序、方向、位置、速度进行动作,简单的机械手一般不设置专用 dedicated control system, using only trip switches, relays, control valves and circuits can be 的控制系统,只采用行程开关、继电器、控制阀及电路 achieved dynamic drive system control, so that implementing agencies according to the 便可以实现传动系统的控制,使执行机构 requirements of action. Action will have to use plex programmable machine hand controller, 按要求进行动作。 动作复杂的机械手则要求采用可编程控制器、 the microputer control.. 微型计算机进行控制。 3. Mechanical hand classification and characteristics 3机械手的分类和特点 Machine hands are generally divided into three categories: the first is the general machinery 机械手一般分为三类:第一类是不需要人工操作的 does not require manual hand. It is an independent not affiliated with a particular host device. It 通用机械手。 它是一种独立的不附属于某一主机的装置。 can be programmed according to the needs of the task to plete the operation of the provisions. 它可以根据任务的需要编制程序,以完成各项规定的操作。 It is characterized with ordinary mechanical performance, also has general machinery, memory, 它的特点是具备普通机械的性能之外,还具备通用机械、记忆智能 intelligence ternary machinery. The second category is the need to manually do it, called the 的三元机械。 第二类是需要人工才做的, operation of aircraft. It originated in the atom, military industry, first through the operation of 成为操作机。 它起源于原子、军事工业,先是通过操作机 machines to plete a particular job, and later developed to operate using radio signals to carry 来完成特定的作业,后来发展到用无线电讯号操作机 out detecting machines such as the Moon. Used in industrial manipulator also fall into this 来进行探测月球等。 工业中采用的锻造操 作机也属于这一 category. The third category is dedicated manipulator, the main subsidiary of the automatic 范畴。 第三类是专用机械手,主要附属于自动机床 or automatic lines, to solve the machine up and down the work piece material and delivery. This 或自动线上,用以解决机床上下料和工件传送, mechanical hand in foreign countries known as the “Mechanical Hand”, which is the host of 这类机械手在国外称为 “Mechanical Hand” 它是为主机服务的, services, from the hostdriven。 exception of a few outside the working procedures are generally 由主机驱动;除少数外,工作程序一般是固定的, fixed, and therefore special. 因此是专用的。 Main features 主要特点 : First, mechanical hand (the upper and lower material machine hand, assembly machine hand, ( 1)机械手(上下料机械手、装配机械手、 handling machine hand, stacking machine hand, help machine hand, vacuum handling machines, 搬运机械手、堆垛机械手、助力机械手、真空搬运机、 vacuum suction crane, laborsaving spreader, pneumatic balancer,etc.) 真空吸吊机、省力吊具、气动平衡器等)。 Second, cantilever cranes (cantilever crane, electric chain hoist crane, air balance the hanging, etc.) ( 2)悬臂起重机(悬臂吊、电动环链葫芦吊、气动平衡吊等)。 Third, railtype transport system (hanging rail, light rail, single girder cranes, doublebeam crane) (3)导轨式搬运系统(悬挂轨道、轻型轨道、单梁起重机、双梁起重机)。 Four, industrial machinery, application of hand ( 4)工业机械手的应用 Manipulator in the mechanization and automation of the production process developed a new 机械手是在机械化、自动化生产过程中发展起来的一种新型装置。 type of device. In recent years, as electronic technology, especially puter extensive use of 近年来,随着电子技术特别是电子计算机的广 泛应用, machine hand development and production of hightech fields has bee a rapidly developed a 机器人的研制和生产已成为高技术领域内迅速发展起来的 new technology, which further promoted the development of machine hand, allowing machine 一门新兴技术,它更加促进了机械手的发展,使得机械手 hand to better achieved with the bination of mechanization and automation. 能更好地实现与机械化自动化的有机结合。 Although the machine hand is not as flexible as staff, but it has to the continuous duplication 机械手虽然目前还不如人手那样灵活,但它具有能不断 of work and labor, I do not know fatigue, not afraid of danger, the power snatch weight 重复工作和劳动、不知疲劳、不怕危险、抓举重物的力量 characteristics when pared。最新机械手外文翻译
相关推荐
来说,我觉得他们在思想品德、行为习惯方 这方面是非常优秀的。 教学方面 备课深入细致。 平时认真研究教材,多方参阅各种资料,力求深入理解教材,准确把握难重点。 在制定教学目的时,非常注意学生的实际情况,工作总结《工作总结》。 教案编写认真,并不断归纳总结经验教训。 狠抓基础知识和基本技能 范文最新推荐 13 由于我班学生基础较差,为了扎实学生的基础知识和基本技能,我在充分了解学生的基础上对症下药
中华人民共和国民事诉讼法》第一百七十七条第一款、第一百八十三条的规定,经本院审判委员会决定,裁定如下: 一、本案由本院另行组成合议庭进行再审; 二、再审期间,中止原判决(或裁定)的执行。 院长 年月日 (院印) 本件与原本核对无异 书记员 民事裁定书(中止或终结执行法律文 书用) 人民法院民事裁定书 (中止或终结执行其他法律文书用) ()执字第号 申请执行人(或申请执行机关)
校 策吧网:大学活动策划书 官方 群: 78059269 策吧网 五、 参赛要求: 每班至少推荐 2 人,多者不限。 演讲题目自拟,内容真实,思想健康。 脱稿演讲。 普通话标准。 时间不超过 10 分钟。 六、比赛安排 5 月 9 日前,各班将参赛选手名单以及演讲题目报校团委, 5 月 12 日中午抽签。 比赛采用抽签制,按参赛号依次进行比赛。 七、评分标准: 演讲内容:观点鲜明,内容紧扣主题
36。 )固 D.芳 馨 . (x255。 n) 鞭 挞 . (d225。 ) 叱 咤 . (zh224。 )风云 2.依据词典解释,对横线处选填汉字的判断, 错误 . . 的一项是 A.通 —— 达旦 (霄,宵 ) “霄 ”有 “天 空 ” 的意思 , “宵 ”有 “夜 ” 的意思。 判断 : 横线处应 填 “宵 ”。 B.多姿多 —— (彩,采 ) “彩 ”有 “颜色 ” 的意思 , “采
报起到出境止 ,过境、转运和通运货物自进境起到出境止,应当接受海关监管。 第十八条 进口货物的收货人、出口货物的发货人应当向海关如实申报,交验进出口许可证和有关单证。 国家限制进出口的货物,没有进出口许可证的,不予放行,具体处理办法由国务院规定。 进口货物的收货人应当自运输工具申报进境之日起十四日内,出口货物的发货人除海关特准的外应当在装货的二十四小时以前,向海关申报。