外文资料翻译译文内容摘要:
unters, a five vector twolevel interrupt architecture,a full duplex serial port, onchip oscillator and clock addition, the AT89C51 is designed with static logicfor operation down to zero frequency and supports twosoftware selectable power saving modes. The Idle Modestops the CPU while allowing the RAM, timer/counters,serial port and interrupt system to continue functioning. ThePowerdown Mode saves the RAM contents but freezesthe oscillator disabling all other chip functions until the nexthardware reset. Pin Configurations Block Diagram Pin Description VCC Supply voltage. GND Ground. Port 0 Port 0 is an 8bit opendrain bidirectional I/O port. As anoutput port, each pin can sink eight TTL inputs. When 1sare written to port 0 pins, the pins can be used as highimpedanceinputs. Port 0 may also be configured to be the multiplexed loworderaddress/data bus during accesses to external programand data memory. In this mode P0 has internalpullups. Port 0 also receives the code bytes during Flash programming,and outputs the code bytes during programverification. External pullups are required during program verification. Port 1 Port 1 is an 8bit bidirectional I/O port with internal Port 1 output buffers can sink/source four TTL 1s are written to Port 1 pins they are pulled high bythe internal pullups and can be used as inputs. As inputs,Port 1 pins that are externally being pulled low will source current (IIL) because of the internal 1 also receives the loworder address bytes during Flash programming and verification. Port 2 Port 2 is an 8bit bidirectional I/O port with internal Port 2 output buffers can sink/source four TTL 1s are written to Port 2 pins they are pulled high by the internal pullups and can be used as inputs. As inputs, Port 2 pins that are externally being pulled low will source current (IIL) because of the internal 2 emits the highorder address byte during fetches from external program memory and during accesses to external data memory that use 16bit addresses (MOVX @DPTR). In this application, it uses strong internal pullups when emitting 1s. During accesses to external data memory that use 8bit addresses (MOVX @ RI), Port 2 emits the contents of the P2 Special Function 2 also receives the highorder address bits and some control signals during Flash programming and verification. Port 3 Port 3 is an 8bit bidirectional I/O port with internal Port 3 output buffers can sink/source four TTL 1s are written to Port 3 pins they are pulled high by the internal pullups and can be used as inputs. As inputs,Port 3 pins that are externally being pulled low will source current (IIL) because of the 3 also serves the functions of various special features of the AT89C51 as listed below: Port 3 also receives some control signals for Flash programming and verification. ALE/PROG Address Latch Enable output pulse for latching the low byte of the address during accesses to external memory. This pin is also the program pulse input (PROG) during Flash normal operation ALE is emitted at a constant rate of 1/6the oscillator frequency, and may be used for external timing or clocking purposes. Note, however, that one ALE pulse is skipped during each access to external Data desired, ALE operation can be disabled by setting bit 0 of SFR location 8EH. With the bit set, ALE is active only during a MOVX or MOVC instruction. Otherwise, the pin is weakly pulled high. Setting the ALEdisable bit has no effect if the microcontroller is in external execution mode. PSEN P。外文资料翻译译文
相关推荐
odule 1 你何不把正确的拼写和语法写在出错的地方。 And why don’t you write down the correct spelling and grammar next to the mistakes? 还有什么吗。 What else? 许多人在讲英语时不好意思,所以,在开口前,深吸一口气,笑一笑。 Many people are shy when they speak
牲国家利益的坚定立场。 第六篇 《伤逝》 1. 创作背景:与 易卜生 的传入及当时的社会思潮有密切的关系;与鲁迅长期对妇女问题的关注有密切的关系。 2. 鲁迅唯一一篇以 爱情 为题材的小说。 3. 涓生、子君爱情悲剧的原因: 直接原因 :他们当时所处的封建、守旧、冷酷、庸俗、无聊的社会环境,和所面临的生存 (经济 )压力。 间接原因 :他们自身的弱点。 4. 艺术手法:小说采取 “手记体
retention money guarantee 保留金保证书 documents of title to the goods 物权凭证 authority to purchase (a/p) 委托购买证 letter of indication 印鉴核对卡 letter of hypothecation 质押书 general letter of hypothecation 总质押书
dvantage, the objectives of management。 (three) the scope of the strategy, the modern human resources management is the full participation in democratic management。 (four) measures in the strategy of
tandards like HTTP and XML messaging. XML Web services are not tied to a particular ponent technology or objectcalling convention. As a result, programs written in any language, using any ponent