图像检索系统外文翻译内容摘要:
ity. Due to the independence between these approaches, is likely that their bination could improve the performance of a search system by benefiting of both approaches. In the present work, we present an image retrieval system based on a bined search of text and content. II. SYSTEM OVERVIEW The present image search system has been implemented using Java , C++, and PostgreSQL. The set of image object were taken from Flickr web site1 using the SAPIR collection [3]. In the offline phase, the images are downloaded from Flickr using the URL provided by the SAPIR collection. The contentbased descriptors extracted from the images were: Color Histogram 3 3 3 using RGB color space (a 27d vector), Gabor Wavelet (a 48d vector), Efficient Color Descriptor (ECD) 8 1 using RGB color space (a 32d vector), ECD 8 1 using HSV color space (a 32d vector), and Edge Local 4 4 (a 80d vector). The Color Histogram and Gabor Wavelet descriptors were implemented in C++ with the OpenCV library, and the other ones were implemented in Java. The textbased descriptors (title, description, and tags) were extracted from the SAPIR collection. The feature vectors were calculated using the vectorial model and the tfidf weighing [1]. Six feature vectors were created for each image, three for the text using the Porter stemming algorithm [4] and three without stemming. A wordlist, stoplist, and the reverse file for the text features (with and without stemming) were also calculated and stored in the PostgreSQL database. In the online phase, the user enters the query image, a search text, and a weighed distance function for each available feature. The distance functions can be metric (like Euclidean distance) or nonmetric (like DPF and cosine distance). Then, the system performs a kNN search using a weighed bination of distances, normalized by the maximum distance of a feature to the origin. All the textbased and contentbased features (up to 11 vectors for an image) are stored in a PostgreSQL database for efficient retrieval of a s mall subset, and in a binary file designed for efficient linear scan. Currently, the system contains more than 115,000 images in the collection and the binary file size is about 130 MB. The system contains two different Graphical Use。图像检索系统外文翻译
相关推荐
remediare”(修复)两词合成,言下之意即污染土壤的植物修复是一种利用自然生长植物或者遗传工程培育植物修复金属污染土壤环境的技术总称。 它通过植物系统及其根际微生物 群落来移去、挥发、稳定土壤环境污染物的方法,是植物、土壤和根际微生物相互作用的综合效果。 根据所需修复土壤的物理、化学和 生物特点、污染程度、污染物理化性质、所要求达到的净化指标和期限,以及植物对重金属的吸收积累能力
论文 )的重点和难点 重点: “经贸 E 家”在线同学录 是 基于 B/S 体系架构 和 Windows XP 环境 创建 的 ,前台使用 Dreamweaver的可视化编程进行开发 , 后台数据库采用 ACCESS并通过 IIS进行发布,它还利用 ADO( Active Data Object)方便地访问数据库,能很好地对数据库进行 处理。 另外介绍了 同学录系统的实现过程
ud_no 学生学号 int 4 是 stud_name 学生姓名 varchar 50 否 stud_password 学生登录时密码 char 20 否 stud_tel 学生电话号码 varchar 50 否 stud_ 学生电子邮件 varchar 50 否 stud_yearid 学生入学年份 int 4 否 stud_dept 学生所属于院部 varchar 50 否
礼品的时间较少。 礼品类型 调查显示,装饰类的产品是大学生选择礼品的主要类型,其次是具有实用性的产品,具有特色的礼品也越来越受到他们的亲睐,玩具类和工艺类得的礼品也比较受欢迎,他们较少选择电子类和摆设类的产品。 大学生作为特殊的群体越来越受到普遍关注,大学生是一个庞大的消费群体,也是一个特殊的消费群体,调查发现,无论是从经济来源、消费结构、理念还是 消费 水平来看, 大学生都出现超前、实用
情况进行评价。 也有学者对这三个标准进行了丰富,如池国华、关建朋、乔跃峰( 2020)通过对企业的组织背景、内部控制系统以及内部控制评价系统的理论分析,认为合理、科学的内部控制评价系统应当具备的 特征是:以风险管理为主线,以内部管理为视角,以资源约束为条件,因此评价系统构建时,必须坚持权变、目标导向和经济性三项基本原则。 二、内部控制评价方法介绍方面 在这个方面国内主要是对内部控制自我评价(