四级英语图表作文整理(1)内容摘要:

in the past __________________________, while ________________________________ is decreasing. (从整体上对事物发展的趋势作概括 ) 段落二: Possible reasons for this are as follows. (问题产生的原因 ) On the one hand, _____________________________________________________. (原因一 ) On the other hand, __________________________________________________________________. (原因二 ) Furthermore, _________________________________________________. (原因三 )  段落三: From what has been analyzed, we can draw a conclusion that ________________________________. (得出结论 ) As a matter of fact, with the improvements in ____________________________, the trend will go on in the future. (提出改进的方法或措施 ) Therefore, ________________________________. (最后再强调观点 )  段落一: The chart gives us an overall picture of the ____________(图表主题 ). The first thing we notice is that_______________(图表最大特点 ). This means that as __________, _________________(进一步说明 ).  段落二: We can see from the statistics given that _______________(图表细节一 ). After ving_________(细节一中的第一个变化。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。