员工培训排课系统遗传算法英文文献翻译-英语论文内容摘要:
ystem. Specifically, the ability to schedule appropriate training courses is an important function of a training system. By utilizing reasonable functions of the training program, such as adaptive course arrangement, this training system can be more practical. Therefore, we intended to focus on appropriate course scheduling and arrangement. The Taiwanese machine tool industry is one of the most important industrial activities on the island. However, employee training for most panies in this sector was performed in conventional means. There is no systematic course scheduling mechanism utilized in the training practice, which results in timeconsuming processes and less training achievement. In this study, the maintenance personnel training in machine tool industry was taken to illustrate the formulation of mathematical models. The optimization model we proposed is capable of handling training course scheduling, which provides optimal course bination for triggering adequate training materials. The training programs of the machine tool industry are collected and anized as well. The objective of this study is threefold: (1) to construct a mathematical model with adequate course arrangement, (2) to solve the model with geic algorithms for obtaining optimal results, and (3) to develop a puter aided training system to facilitate personnel training in the machine tool industry. 员工培训排课系统遗传算法英文文献翻译 2 Literature review In order to search for suitable training course that meets individual needs, this study discusses the scheduling of training courses, the attributes of courses, the construction of a scheduling model, and GA, which was utilized to solve the model. Scheduling and selection of course Many studies have been found in the literature that deals with course selection and scheduling in training programs. Chiou (2020) stated that course scheduling is a plicated issue and is an NPComplete problem. There is no optimal solution in the programming search area. Lin (1998) contended that the plexity and difficulty of the course scheduling is caused by the uncertainty of the correlation between the resource limitations and multiple constraints. The issue of course scheduling is a Constrain Satisfaction Problem, CSP, which obtains sufficiently feasible solutions but has difficulty reaching the optimal solutions. AlvarezValdes, Enric, and Tamarit (2020) designed and implemented a course scheduling system with Tabu search algorithm. Yan (1995) suggested a dynamic instruction strategy system after designing the learning flow of the puter assisted learning system for students, analyzed the addition operation within 1000, and built plete instructional materials for the addition operation. Yan also used fuzzy set theory to provide the qualified grading method for teachers, while using GA to modify the learning flow. That dynamically adjustable learning flow system can control the quantity, sequence and content of the instructional materials, according to the needs of the students, which realizes the educational goal of individualized teaching. This method is more appropriate for the procedural courses. However, it is still difficulttoreality in maintenance personnel train programs since it is timeconsuming. This method requires a test immediately after the course is taken, and with the test results, the system modifies the structure of the instructional materials. The system then uses geic algorithms to search for the next suitable course. However, it needs much time to achieve good results while the number of course unit getting large. Besides, since the personnel training courses mostly are not procedural, this method is not suitable to be utilized for training purposes. Lin, Wu et al., 1998 and Lin, Hu, et al., 1998 suggested the use of fuzzy set theory to select training courses. They considered the factors of the emotion and ability of the trainees, using the characteristic of the fuzzy set theory in accordance with the factors of emotion and ability to modify the attribute values of the course (such as training period), and remend a course sequence. Their research overlooked the procedure of the training, and could not meet the demand for the course preparation. Chiou (2020) used geic algorithms to solve a mathematical model for structured course scheduling, and suggested a unique bimatrix, according to heuristics, to produce solutions that initially satisfied requirements. Based on the requirement for model adjustment, Chiou applied geic search procedures for finding optimal solutions, demonstrating the great search ability and efficiency of GA. However, Chiou’ s approach did not take the course attributes into account. 六维论文网 Employee education and training The ideal policy of the employee training of an enterprise should cover education, training and development. In accordance with concept of lifelong learning, employee training programs need systematic planning and proper course design. Education refers to focusing on the potential needs of the enterprise, and through longterm training, helping the individual gain general knowledge. Training should emphasize the immediate needs of the enterprise, help the individual obtain professional knowledge according to the concept of “ learn now and apply immediately.” Development means to broaden the ideas and increase the ability as a whole through longterm cultivation (Liu amp。 Lee, 1995). Matsushita Konosuke, a famous Japanese manager, once said: “ Foster people before making products (Lin, 1998).” Because people are the basic element of the enterprise activities, many visionary managers or administrators, in addition to focusing on the achievement of the shortterm mission goals, under the circumstances of limited time and funding, are mitted to increase。员工培训排课系统遗传算法英文文献翻译-英语论文
相关推荐
公司实现利润额 ( 30%) 四、奖金的提取 2020 年销售目标 25 吨,月销售 吨,以超额量的多少提取部分利润进行奖金分配。 (1)年终超产数量在 10%以内(含 10%)每公斤提 8 元。 (2) 年终超产数量在 20%以内(含 20%)每公斤提 9 元。 (3) 年终超产数量在 20%以上提每公斤 10 元。 五、车间奖金计算 车间奖金是以车间出产产品的超额数量
月业绩。 业绩以款到账数为核算依据。 2.电话营销员和本公司其他部门员工一样,要严格遵守公司的各项规章制度及条例,违规按章处罚。 四、业务提成的比例 ┌─────────┬──────────┐ │ 月业绩 │ 提成比例 │ ├─────────┼──────────┤ │ │ % │ ├─────────┼──────────┤ │ │ % │ ├─────────┼──────────┤ │
一定会后悔。 别为你 自己 和别人下定论,你所看到听到的可能只是一面。 如果 周围有人 嫉妒 你,那么你可以把他从你的竞争者之列排除了。 1很多事情别人通知你了,要说谢谢,没有通知你,不要责怪,因为那些事你其实应该自己弄清楚。 1一个人最大的痛苦,莫过于被圈在自己设定的圈子里出不来。 就像一只蚕,丝吐的越多, 5 对自己捆绑得越紧,直到最后完全把自己包上,想出也出不来。 1 善良 是一种 智慧
兹定于月日召开会。 现将有关事宜通知如下: 一、 会议议题。 二、 参加人员。 三、 会议时间 月 —— 日(会期,报到。 ) 四、 会议地点。 五、 有关事宜 (一)。 (二)。 (三)。 联系人:,电话:,传真:。 年月日 通报 一、通报种类 表彰通报 —— 即用于表彰先进集体或先进个人的通报。 批评通报 —— 即用于批评某个单位或个人所犯错误问题的通报。 情况通报 ——
求变成自己工作的快乐源泉。 二 .用爱做桥 ,让包容成为一种习惯。 爱是班主任工作的“活水”,她托起班级管理的翅膀。 陶行知先生说过:“没有爱便没有教育”。 这种爱,是发自教师内心的真爱,是一种大爱,不是溺爱,更不是一种因职业要求而被迫装出来的给予和施舍。 爱是尊重,尊重意味着信任、理解、宽容和接纳每一个学生。 每个班级不可能都是可造之才,也不可能全是十全十美的学生,人是有差异的