单片机控制系统外文翻译内容摘要:
, allowing different modes of operation, while some actually contain specialpurpose microprocessors to permit quite plex operations to be carried out without directly involving the main microprocessor. The microprocessor , memory and input/output circuit may all be contained on the same integrated circuit provided that the application does not require too much program or data storage . This is usually the case in lowcost application such as the controllers used in microwave ovens and automatic washing machines . The use of single package allows considerable cost savings to e made when articles are manufactured in large quantities . As technology develops , more and more powerful processors and larger and larger amounts of memory are being incorporated into single chip microputers with resulting saving in assembly costs in the final products . For the foreseeable future , however , it will continue to be necessary to interconnect a number of integrated circuits to make a microputer whenever larger amounts of storage or input/output are required. Another major engineering application of microputers is in process control. Here the presence of the microputer is usually more apparent to the user because provision is normally made for programming the microputer for the particular application. In process control applications the benefits lf fitting the entire system on to single chip are usually outweighed by the high design cost involved, because this sort lf equipment is produced in smaller quantities. Moreover, process controllers are usually more plicated so that it is more difficult to make them as single integrated circuits. Two approaches are possible。 the controller can be implemented as a generalpurpose microputer rather like a more robust version lf a hobby puter, or as a ‘packaged’ system, signed for replacing controllers based on older technologies such as electromagic relays. In the former case the system would 4 probably be programmed in conventional programming languages such as the ones to9 be introduced later, while in the other case a specialpurpose language might be used, for example one which allowed the function of the controller to be described in terms of relay interconnections, In either case programs can be stored in RAM, which allows them to be altered to su。单片机控制系统外文翻译
相关推荐
g force. In this paper, we demonstrate a piezoelectric motor that does not have the above limitations. It is implemented by a single piezoelectric scanner tube(PST) that is axially and deeply cut
l be used repeatedly, the entire procedure for the 80% code. And the remaining 80% of the directive is not frequently used in the process is a mere 20%, it is clear that This structure is not very
电压为 Vi,考虑到开关管 S 漏极对公共端的导通压降 Vs,即为 ViVs。 ton 时通过 L 的电流增加部分 △ ILon 满足式 (1)。 L tVVI onsiLon )( (1) 式中: Vs 为开关管导通时的压降和电流取样电阻 Rs 上的压降之和,约 ~。 toff 时,开关管 S 截止,二极管 D 处于导通状态,储存在电感 L 中的能量提供给输出,流经电感 L 和二极管
l carried. To eliminate this problem, a signal transmission system was developed. This system is usually either pneumatic or electrical. And control instruments in one location. This makes it
灯光控制方式,使得控制效果更加灵活;声光报警模块,预先延时报警通知关灯动作,使得管理更加人性化。 该教室照明系统简单实用,适用范围广,减少 人工管理成本。 本章小结 教室作为教学的重要场所, 面对教室 照明质量差且 浪费严重这一现象,着眼大局,为保护学生视力、提高学习效率, 创造一个健康舒适、高效节能的学习环境, 提高 和 改善教室照明质量,优化 照明 控制系统 势在必行。 在 合理布局照明设备
singlechips in the car, even in plex industrial control systems may have hundreds of single chip at the same time! The number of SCM is not only far more than the sum of PC and other puting even more