住友(sumitomo)sf320系列变频器英文说明书内容摘要:
0/60Hz Three phase 380 to 460V 50/60Hz Power supply A Fasten the screws with the specified fastening torque. Check so that ................ there is no loosening of screws. Otherwise, there is a danger of fire. /f\ Remarks for using earth leakage circuit breakers in the mains supply: Frequency inverters with CEfilters(RFIfilter) and screened motor cables have a higher leakage current against earth. Especially in the moment of switching on this can cause unintentional triggerings of earth leakage circuit breakers. Because of the rectifier on the input side of the inverter there is the possibility to stall the switchoff function through amounts of DCcurrent. The following should be observed: Only short timeinvariant and pulse currentsensitive earth leakage circuit breakers with higher trigger current should be used. Other ponents should be secured with separate earth leakage circuit breakers. Earth leakage circuit breakers in front of an inverter are not an absolute protection against direct touching. /f\ Be sure to set the fuse(s) (the same phase as the main power supply) ................ in the operation circuit. Otherwise, there is a danger of fire. /1\ As for motor leads, earth leakage breakers and electromagic ...... contactors, be sure to use the equivalent ones with the specified capacity (rated). Otherwise, there is a danger of fire. 13 3. Control and operation /!\ WARNING /f\ Be sure to turn on the input power supply after closing the front ................. p. 61 case. While being energized, be sure not to open the front case. Otherwise, there is a danger of electric shock. /K Be sure not to operate the switches with wet hands. ....... p. 61 Otherwise, there is a danger of electric shock. /|\ While the inverter is energized, be sure not to touch the inverter ................ p. 61 terminals even during stoppage. Otherwise, there is a danger of electric shock. /|\ If the retry mode is selected, it may suddenly restart during the trip ............ p. 61, stop. Be sure not to approach the machine. (Be sure to design the p. 811 machine so that personnel safety will be secured even if it restarts.) Otherwise, there is a danger of injury. /f\ Even if the power supply is cut for a short period of time, it may ................ p. 61 restart operation after the power supply is recovered if the operation mand is given. If it may incur danger to personnel, be sure to make a circuit so that it will not restart after power recovery. Otherwise, there is a danger of injury. /|\ The Stop Key is effective only when the function is set. Be sure to ............... p. 61 prepare the Key separately from the emergency stop. Otherwise, there is a danger of injury. /K After the operation mand is given, if the alarm reset is ....... p. 61 conducted, it will restart suddenly. Be sure to set the alarm reset p. 712 after checking the operation mand is off. Otherwise, there is a danger of injury. /|\ Be sure not to touch the inside of the energized inverter or to put a ............. p. 61 bar into it. Otherwise, there is a danger of electric shock and/or fire. /1\ When the power is turned on when the running mand is on, the ................... p. 74 motor starts rotation and it is dangerous. Before turning the power on, confirm that the running mand is not on. /t\ When the Stop key function is ineffective, pressing the Stop key ................. p. 812 does not cancel the stop and trip. Be sure to provide an emergency stop switch separately. When the operation mand destination is a digital operator, this selection is ineffective. 14 j\ CAUTION /K Cooling fin will have high temperature. ....... p. 62 Be sure not to touch them. Otherwise, there is a danger of getting burned. A\ Low to high speed operation of the inverter can be easily set. Be sure ............... p. 62 to operate it after checking the tolerance of the motor and machine. Otherwise, there is a danger of injury. /K If a motor is operated at a frequency higher than standard setting ..................... p. 62 value(50Hz/60Hz),be sure to check the speeds of the motor and the machine with each manufacturer, and after getting their consent, operate them. Otherwise, there is a danger of machine breakage. /|\ Check the following before and during the test run. ...... p. 64 Otherwise, there is a danger of machine breakage. • Was the shortcut bar between P1 and P removed? • Was the direction of the motor correct? • Was the inverter tripped during acceleration or deceleration? • Were the rpm and frequency meter correct? • Were there any abnormal motor vibrations or noise? 4. Maintenance, inspection and part replacement j\ WARNING /K After a lapse of more than 5 minutes after turning off the input power ................ p. 111 supply, perform the maintenance and inspection. Otherwise, there is a danger of electric shock. /f\ Make sure that only qualified persons will perform maintenance, ...................... p. 111 inspection and part replacement. (Before starting the work, remove metallic objects from your person (wristwatch, bracelet, etc.) (Be sure to use tools protected with insulation.) Otherwise, there is a danger of electric shock and/or injury. /t\ WARNING A\ When removing connectors, never pull the wires. (Wires for cooling fan and logic ) Otherwise, there is a danger of fire due to wire breakage and/or injury. p. 111 15 5. Others WARNING /K Never modify the unit. Otherwise, there is a danger of electric shock and/or injury. CAUTION /K Withstand voltage tests and insulation resistance tests (megger tests) are executed before the units are shipped, so that there is no need to conduct these tests before operation. /K Do not attach or remove wiring or connectors when power is applie。住友(sumitomo)sf320系列变频器英文说明书
相关推荐
动控制部分要求采用不低于 VVVF 变压变频调速的控制技术; 器 要求双向离心式 限速器。 要求采用渐进式安全钳; ,其安全储备系数≥ 12。 以上部件必须整件原装,并注明原产地、型号等技术参数。 (如有中文以外的文字时,须附准确表述的中文译文,中外文不一致时,以中文为主)。 投标人须在投标书中详细提供所投产品零部件产地详细清单。 ( 3)电梯功能表 17 安全功能 1 修正运行 2
风险等级单位,应采用相应一级安全防范,需全方位保护措施。 因此,安装安全防范系统十分必要。 随着现代科技的发展,尤其是数字技术和网络技术的发展,监控系统也将由模拟信号系统发展为数字化信息系统,由单机控制向网络传输、控制发展。 我们基于现在安防成熟技术,利用未来的技术发展趋势,我们在比较各家安防产品的特点之后,并根据多年的工程经验,结合了数字硬盘录像机和视频监控矩阵优点
10—— 15 其他设备 ①安装位置与安装质量 ②通电试验 10—— 15 报警中心设备 ①设备安装位置 ②布线位置 ③穿孔、连接处接触情况 ④开关、按钮灵活情况 ⑤通电情况 ⑥软件实用与稳定性情况 100 电 (光 )缆敷设 ①敷设与布线 ②电缆排列位置,布放和绑扎质量 ③焊接及括接头安装质量 ④接线盒接线质量 30 接地 ①接地材料 ②接地线焊接质量 ③接地电阻 100 表 9
ight incur electric shock and/or fire. After installing the main body, carry out wiring. ........... p. 51 Otherwise, there is a danger of electric shock and/or injury. WARNING zt\Azt\A A AAAA 12
ese errors may cause damage to physical property. (*2) (*1) Such things as injury, burns or shock that will not require hospitalization or long periods of outpatient treatment. (*2) Physical property
a。 所以 ,液氩在翅片管内吸热经液相 、气相 两种相变过程 ,不考虑气液两相区气化阶段。 按热力学第一定律 ,翅片管换热器气化过程 中吸收的总热量 : Q=m(houhin)=(Ql+Qg)n(1) 式中 :Q为翅片管在单位时间内的传热量 , kJ/s。 Ql为单排翅片管液相区单位时间内的传热 量 ,kJ/s。 Qg 为单排翅片管气相区单位时间内的 传热量 ,kJ/s。