住友(sumitomo)sf320a系列变频器英文说明书内容摘要:
ese errors may cause damage to physical property. (*2) (*1) Such things as injury, burns or shock that will not require hospitalization or long periods of outpatient treatment. (*2) Physical property damage refers to wideranging damage to assets and materials. Meanings of symbols Symbol Meaning of Symbol 0 Indicates prohibition (Don39。 t do it). What is prohibited will be described in or near the symbol in either text or picture form. o Indicates something mandatory (must be done). What is mandatory will be described in or near the symbol in either text or picture form. o Indicates danger. What is dangerous will be described in or near the symbol in either text or picture form. 厶 Indicates warning. What the warning should be applied to will be described in or near the symbol in either text or picture form. ■ Limits in purpose This inverter is used for controlling speeds of threephase induction motors in general industrial use. 外 、 Safety precautions ▼The inverter cannot be used in any device that would present danger to the human body or from which malfunction or error in operation would present a direct threat to human life (nuclear power control device, aviation and space flight control device, traffic device, life support or operation system, safety device, etc.). If the inverter is to be used for any special purpose, first get in touch with the people in charge of sales. ▼This product was manufactured under the strictest quality controls but if it is to be used in critical equipment, for example, equipment in which errors in malfunctioning signal output system would cause a major accident, safety devices must be installed on the equipment. ▼ Do not use the inverter for loads other than those of properly applied threephase induction motors in general industrial use. (Use in other than properly applied threephase induction motors may cause an accident.) 1 ■ General operation Danger See item Di sassembly prohibited • Never disassemble, modify or repair. This can result in electric shock, fire and injury. 2. 0 P rohibited • Never remove the front cover when power is on or open door if enclosed in a cabi. The unit contains many high voltage parts and contact with them will result in electric shock. • Don39。 t stick your fingers into openings such as cable wiring hole and cooling fan covers. This can result i n electric shock or other injury. • Don39。 t place or insert any kind of object into the inverter (electrical wire cuttings, rods, wires). This can result in electric shock or fire. • Do not allow water or any other fluid to e in contact with the inverter. This can result in electric shock or fire. 2. 1 2. 2. 2. o M andatory • Turn power on only after attaching the front cover or closing door if enclosed in a cabi. If power is turned on without the front cover attached or closing door if enclosed in a cabi. This can result in electric s hock or other injury. • If the inverter begins to emit smoke or an unusual odor, or unusual sounds, immediately turn power off. I f the equipment is continued in operation in such a state, the result may be fire. • A l ways turn power off if the inverter is not used for long periods of time since there is a possibility of mal function caused by leaks, dust and other material. I f power is left on with the inverter in that state, it may result in fire. 2. 1 3. 3. ytv Warning P rohibited contact Do not touch heat radiating fins. These devices are hot, and you39。 ll get burned if you touch them. Avoid operation in any location where there is direct spraying of the following solvents or other chemicals. The plastic parts may be damaged to a certain degree depending on their shape, and there is a possibility of the plastic covers ing off and the plastic units being dropped. I f the chemical or solvent is anything other than those shown below, please contact us in advance. ( Tabl e 1) Exampl es of appl i cabl e chemi cal s and s ol vents Chemi cal Sol vent Hydrochloric acid (density of 10% or less) M ethanol Sulfuric acid (density of 10% or l ess) Ethanol Ni tric acid ( dens i ty of 10% or l es s ) Tri ol Caustic soda M esopropanol A mmonia Gl ycerin Sodi um chl ori de ( s al t) ( Table 2) Examples of unapplicable chemicals and solvents Chemi cal Sol vent P henol Gas oline, kerosene, l i ght oil B enzenesulfonic acid Turpentine oil B enzol Thinner 3. 2 ■ Transportation ■ Installation ◊ Danger See item P rohibited • Do not install or operate the inverter if it is damaged or any ponent is missing. This can result in electric shock or fire. • Do not place any inflammable objects nearby. I f a flame is emitted due to malfunction, it may result in a fire. • Do not install in any location where the inverter could e into contact with water or other fluids. This can result in electric shock or fire. 1. 2. o M andatory • M ust be used in the environmental conditions prescribed in the instruction manual. Us e under any other conditions may result in malfunction. • M ust be installed in noninflammables such as metals. The rear panel gets very hot. If installation is in an inflammable object, this can result in fire. • Do not operate with the front panel cover removed. This can result in electric shock. • An emergency stop device must be installed that fits with system specifications (. shut off input power then engage mechanical brake). Operation cannot be stopped immediately by the inverter alone, thus risking an accident or injury. • All options used must be those specified by Sumitomo Heavy Industries. The use of any other option may result in an accident. 1. 1. 1. 1. 1. A\ Warning See item P rohibited • When transporting or carrying, do not hold by the front panel covers. The covers may e。住友(sumitomo)sf320a系列变频器英文说明书
相关推荐
ight incur electric shock and/or fire. After installing the main body, carry out wiring. ........... p. 51 Otherwise, there is a danger of electric shock and/or injury. WARNING zt\Azt\A A AAAA 12
0/60Hz Three phase 380 to 460V 50/60Hz Power supply A Fasten the screws with the specified fastening torque. Check so that ................ there is no loosening of screws. Otherwise, there is a
动控制部分要求采用不低于 VVVF 变压变频调速的控制技术; 器 要求双向离心式 限速器。 要求采用渐进式安全钳; ,其安全储备系数≥ 12。 以上部件必须整件原装,并注明原产地、型号等技术参数。 (如有中文以外的文字时,须附准确表述的中文译文,中外文不一致时,以中文为主)。 投标人须在投标书中详细提供所投产品零部件产地详细清单。 ( 3)电梯功能表 17 安全功能 1 修正运行 2
a。 所以 ,液氩在翅片管内吸热经液相 、气相 两种相变过程 ,不考虑气液两相区气化阶段。 按热力学第一定律 ,翅片管换热器气化过程 中吸收的总热量 : Q=m(houhin)=(Ql+Qg)n(1) 式中 :Q为翅片管在单位时间内的传热量 , kJ/s。 Ql为单排翅片管液相区单位时间内的传热 量 ,kJ/s。 Qg 为单排翅片管气相区单位时间内的 传热量 ,kJ/s。
. 2 投标文件的正本和副本均需打印或使用不褪色的蓝、黑墨水笔书写,字迹应清晰易于辨认,并应在投标文件封面的右上角清楚地注明“正本”或“副本”。 正本和副本如有不一致之处,以正本为准。 电子文档和纸质文件如有不一致之处,以纸质文件为准。 16. 3 投标书 、 投标报价明细表及 投标商务文件封面、投标 书、投标报价明细表 均应加盖投标人印章并经法定代表人或其委托代理人签字或盖章。