中英文外文翻译压力铸造内容摘要:

equipment and manhour。 The price of the casting is easy。 Can adopt and make die casting up with other metal or nonmetallic materials . Assemble manhour save metal also sparingly. There are a lot of advantages in though die casting, but there are some shortings, to be solved. For instance: 1) Because one of speeds is high in the liquid metal filling with type at the time of die casting, the flow state is unstable, so adopt and generally press the casting method, the 南通职业大学毕业设计 (论文 ) 39 casting is apt to produce the air vent, not Can heattreat。 2) To the concave and plicated casting, die casting is paratively difficult。 3)High point alloy (such as the copper, ferrous metal), it is relatively low to press the lifespan of casting mould。 4)Should not produce in batches small , it is with high costs that its main reason pigeonholes the casting mould and is made, the production efficiency of die casting machine is high, produce in batches uneconomically small. Second . The range of application of die casting and development trend Die casting is one of the most advanced metal shaping methods , realizing lacking the smear metal, without effective way of smear metal, it is very wide to use。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。